| Date |
Text |
| 2022-07-27 10:20:00 | Z22070011 - 3400 N FLAGLER BOAT LIFTS 7.26.22 SUB |
| | COMMENTS FROM RICK ROSSANO, SR. PROJECT COORDINATOR, |
| | ENGINEERING SERVICES AT 561-494-1098 [email protected] |
| | GENERAL: |
| | O PLEASE RESPOND TO ALL COMMENTS IN WRITING, AND |
| | INCLUDE PROJECT NAME, ADDRESS AND PERMIT NUMBER |
| | (Z-XXXXXXXX). |
| | O THE CITY OF WEST PALM BEACH HAS A NUMBER OF |
| | REGULATIONS AND PERMIT REQUIREMENTS WHICH DIRECTLY |
| | AFFECT THE DEVELOPMENT AND INSTALLATION OF WATER AND |
| | WASTEWATER UTILITIES WITHIN THE CITY. PLEASE SEE |
| | DEVELOPMENT PERMIT SUBMITTAL REQUIREMENTS AT THE LINK |
| | BELOW: |
| | A. HTTP://WPB.ORG/CMSPAGES/GETAMAZONFILE.ASPX?PATH=~\WP |
| | B_WEBSITE\MEDIA\ENGINEERING\DEVELOPMENT-APPLICATION-FUL |
| | L-PACKAGE_2016.PDF&HASH=7BD4DD7EB6115181D8C5977BCC02A97 |
| | B1960045731D3658206F27451722716EF |
| | B. THIS AND OTHER RELATED ENGINEERING DOCUMENTS CAN BE |
| | FOUND HERE: |
| | HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR |
| | MS,-PERMITS-APPLICATIONS |
| | C. ALSO SEE: CODE OF ORDINANCES, CITY OF WEST PALM |
| | BEACH, FLORIDA, CODIFIED THROUGH ORD. NO. 4183-08, |
| | ADOPTED SEPT. 22, 2008. (SUPPLEMENT NO. 18) |
| | CHAPTER 90 UTILITIES, ARTICLE I. IN GENERAL, |
| | SEC. 90-7. POLICY REGARDING EXTENSION OF WATER OR SEWER |
| | SERVICE FACILITIES OF THE CITY. |
| | THE WATER AND WASTEWATER SERVICE AGREEMENTS AND THE |
| | CONSTRUCTION PERMITS ADDRESS RESERVATION OF CAPACITY |
| | BASED ON USAGE, METER SIZE AND FEES, DESIGN STANDARDS, |
| | BACKFLOW PREVENTION, FIRE SERVICE AND IRRIGATION. |
| | O AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH |
| | CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED, |
| | STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR |
| | MORE INFORMATION, REFER TO THE LINK BELOW: |
| | A. HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PU |
| | BLICATIONS/BACKFLOW-CROSS-CONNECTION- CONTROL-MANUAL |
| | O PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY |
| | OF WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC |
| | RIGHT OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF |
| | YOUR PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE |
| | MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL |
| | IN THE WPB ENGINEERING SERVICES DEPARTMENT AT |
| | [email protected] OR 561-494-1079 FOR FURTHER |
| | ASSISTANCE. NOTE THAT FIELD RECORDS ARE FOR INFORMATION |
| | ONLY. FIELD VERIFY UTILITY LOCATIONS USING FIELD |
| | SURVEY, POT-HOLING, SOFT DIGS ETC. |
| | O PROVIDE INFORMATION FOR WATER & SEWER SERVICES |
| | (EXISTING, PROPOSED, ETC.) |
| | |
| | QUESTIONS AND COORDINATION CONTACTS: |
| | O MARK HURLEY, FIELD CUSTOMER SERVICE SUPERVISOR WITH |
| | CITY OF WPB PUBLIC UTILITIES, REGARDING PLACEMENT OF |
| | BACKFLOW DEVICES AND WATER METERS. CONTACT HIM AT |
| | 561-822-2262 OR [email protected] |
| | O MIKE TECHNOW, PROJECT ENGINEER, PUBLIC UTILITIES |
| | DEPARTMENT AT 561-494-1047 OR [email protected] |
| | O TRACY WARD, SR. STORMWATER ENGINEER, ENGINEERING |
| | SERVICES DEPT. AT 561-494-1120 OR [email protected] |
| | |
| |
Print |