Text |
| 2022-10-18 16:47:31 | THE FOLLOWING NOTES WERE NOT ABLE TO BE INPUT INTO |
| | COMMUNITY PLUS AT THE TIME OF REVIEW DUE TO THE IT |
| | ISSUES WITH COMMUNITY PLUS. THE COMMENTS WERE EMAILED |
| | TO THE CONSULTANT AND ARE BEING ADDED TO COMMUNITY PLUS |
| | ON 10/18/2022 AS STORM #2. STORM #3 COMMENTS WILL |
| | ADDRESS THE 9/30/2022 RE-SUBMITTAL. |
| | |
| | |
| | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE |
| | 8/26/2022 SUBMITTAL. |
| | |
| | |
| | 1. [NOT SATISFIED ??? REVISED SURVEY NOT INCLUDED IN |
| | THE SUBMITTAL] THE CITY???S OFFICIAL VERTICAL DATUM IS |
| | NGVD1929. THE CITY HAS ALLOWED THE USE OF NAVD1988 AS |
| | LONG AS THE CONVERSION EQUATION TO NGVD1929 AT THE |
| | PROJECT LOCATION IS PROVIDED. PROVIDE THE VERTICAL |
| | DATUM CONVERSION TO NGVD1929 ON THE SURVEY. |
| | |
| | 2. [SATISFIED] MOVE THE TRENCH DRAIN OUTSIDE THE RIGHT |
| | OF WAY OF PINE STREET. |
| | |
| | 3. [PARTIALLY SATISFIED ??? EXPLAIN HOW SEA LEVEL RISE |
| | WAS CONSIDERED] DRAINAGE CALCULATIONS TO CONSIDER SEA |
| | LEVEL RISE ON THE GROUNDWATER TABLE AND TAILWATER |
| | CONDITIONS. |
| | |
| | 4. [NOT SATISFIED] JUSTIFY THE DIAMETER OF THE OUTFALL |
| | PIPE. |
| | |
| | 5. [SATISFIED] WHAT WILL BE THE CONTRIBUTING AREA TO |
| | THE EXFILTRATION TRENCH UNDER THE DRIVEWAY TO N. |
| | FLAGLER DRIVE. THE HEAD ON THE TRENCH WILL BE LIMITED |
| | TO THE TRENCH DRAIN RIM ELEVATION. |
| | |
| | 6. [SATISFIED] DESIGN ACCESS (HEIGHT CLEARANCE) TO |
| | EXFILTRATION TRENCH SYSTEMS FOR MAINTENANCE AND FUTURE |
| | REPLACEMENT WHEN THE EXFILTRATION TRENCHES ARE NO |
| | LONGER FUNCTIONING AS DESIGNED. |
| | |
| | 7. [SATISFIED] SIDEWALK AND PARKING EASEMENTS WILL BE |
| | NEEDED FOR SIDEWALKS AND ON-STREET PARKING SPACES |
| | OUTSIDE THE RIGHT OF WAY. |
| | |
| | 8. [SATISFIED ??? NOTE PIPE INVERTS DO NOT MATCH PLAN |
| | VIEW] PROVIDE DETAIL OF CONTROL STRUCTURE AND SHOW THE |
| | WEIR ELEVATION ON THE PGD PLANS. |
| | |
| | 9. [SATISFIED] BLEEDERS ARE NOT PERMITTED WITH |
| | EXFILTRATION TRENCH SYSTEMS. |
| | |
| | 10. [SATISFIED ??? SHOW AND LABEL PROPOSED PROPERTY |
| | LINES AT EACH END OF THE ALLEY ABANDONMENT] SHOW THE |
| | LIMITS OF THE PROPOSED ALLEY ABANDONMENT. |
| | |
| | 11. SHOW HOW ALLEY GRADING WILL TRANSITION TO EXISTING |
| | GRADE. |
| | |
| | 12. [SATISFIED] PROVIDE CROSS SECTIONS FROM CENTERLINE |
| | OF ROADWAY TO FACE OF BUILDING(S). LABEL STREET NAME |
| | AND SHOW RIGHT OF WAY LINE, SURFACE FEATURES AND |
| | SLOPES, BREAK POINTS, AND HORIZONTAL DISTANCES FROM |
| | RIGHT OF WAY LINE TO SURFACE FEATURES. |
| | |
| | 13.[SATISFIED] PROVIDE SECTIONS AT ALL DRIVEWAYS FROM 5 |
| | FEET FROM EDGE OF PAVEMENT TO 5 FEET PAST HIGH POINT OF |
| | DRIVEWAY (OR TRENCH DRAIN). SHOW RIGHT OF WAY LINE AND |
| | DISTANCE FROM R/W TO EP, BACK OF SIDEWALK, HIGH |
| | POINT/TRENCH DRAIN. |
| | |
| | 14. [SATISFIED] SHOW EXISTING STORM PIPE ON PINE STREET |
| | WEST OF AND CONNECTING TO THE EXISTING STORM MANHOLE |
| | SOUTHEAST OF STRUCTURE ST-31. |
| | |
| | 15. [PARTIALLY SATISFIED] LABEL EXISTING UTILITIES IN |
| | THE RIGHT OF WAY (PIPE SIZE, MATERIAL, ETC.) |
| | |
| | 16. [SATISFIED] LABEL PROPOSED CURBS AND GUTTERS. |
| | |
| | 17. [SATISFIED] PROVIDE PROPOSED FINISHED FLOOR |
| | ELEVATIONS ON THE PGD PLANS. |
| | |
| | 18. [PARTIALLY SATISFIED ??? INCLUDE MILL AND RESURFACE |
| | HATCHING IN THE SHEET LEGENDS.] SHOW MILL AND |
| | RESURFACING LIMITS AND PAVEMENT MARKINGS WITHIN THESE |
| | LIMITS. |
| | |
| | 19. [SATISFIED] WATER MAIN MAY BE IN CONFLICT WITH |
| | PROPOSED STRUCTURE ST-31. |
| | |
| | 20. [SATISFIED] THERE APPEARS TO BE A LOW POINT IN THE |
| | EP IN FRONT OF THE DRIVEWAY TO BUTLER STREET OPPOSITE |
| | BROWARD AVE. HOW WILL THIS AREA IN FRONT OF THE |
| | DRIVEWAY DRAIN? |
| | |
| | 21. [NOT SATISFIED] PROVIDE ADDITIONAL EXISTING GRADES |
| | ALONG THE EP OF N. FLAGLER DRIVE, NORTH OF THE PROPOSED |
| | DRIVEWAY. |
| | |
| | NEW COMMENTS (8/26/2022 SUBMITTAL) |
| | |
| | 22. SECTION A-A |
| | A. BEGINNING OF DRIVEWAY SHOULD MEET EXISTING GRADE. |
| | B. VALLEY GUTTER MAY NOT BE NEEDED. |
| | C. CREATE A HIGH POINT IN THE DRIVEWAY AT THE BACK OF |
| | SIDEWALK AND ELIMINATE THE TRENCH DRAIN. ADD A CATCH |
| | BASIN ONTO THE 18 INCH STORM PIPE TO COLLECT RUNOFF |
| | WITHIN THE BUILDING. |
| | |
| | 23. SECTION C-C |
| | A. MOVE SECTION ABOUT 20 FEET TO THE WEST TO FALL |
| | WITHIN THE LANDSCAPE AREA BETWEEN THE SIDEWALKS AND |
| | THROUGH THE SEATWALLS. |
| | B. FG LINE APPEARS TO BE SHIFTED TO THE RIGHT. IF NOT |
| | THEN ABOUT 5 FEET OF SIDEWALK CROSS SLOPE IS TOO STEEP. |
| | C. CONFIRM PROPOSED GRADE OF 6.01 (VS. 6.10 ON PGD |
| | PLAN). |
| | D. R/W DIMENSIONS ADD UP TO LESS THAN 37.5 FEET. |
| | E. THE FLOOR OF THE BUILDING INTERIOR APPEARS TO HAVE |
| | 10% SLOPE. |
| | F. SHEET A0.08 SHOWS A DOOR OPENING TO THE CAF?? SPACE |
| | WHERE THE PGD PLAN SHOWS SPOT GRADES BETWEEN 8.03 FEET |
| | AND 6.34 FEET NAVD ADJACENT TO THE BUILDING. CAF?? FFE |
| | IS 9.00 FEET NAVD. |
| | |
| | 24. SECTION D-D |
| | A. NOT SHOWN ON KEY MAP. |
| | B. BEGINNING OF DRIVEWAY SHOULD MEET EXISTING GRADE. |
| | |
| | 25. SECTION F-F |
| | A. CREATE A HIGH POINT IN THE DRIVEWAY AT THE |
| | PROPERTY/RIGHT OF WAY LINE, CONVERT ST-29 TO A CATCH |
| | BASIN AND ELIMINATE THE TRENCH DRAIN. THIS WILL ALLOW |
| | ST-29 TO BE SMALLER THAN 7 FEET IN DIAMETER BY |
| | ELIMINATING THE SOUTH PIPE CONNECTION. |
| | B. R/W DIMENSIONS ADD UP TO LESS THAN 25 FEET. |
| | |
| | 26. SECTION G-G |
| | A. DIMENSIONS DO NOT MATCH WHAT IS SHOWN ON SHEET |
| | C-400. |
| | B. SECTION SYMBOL ON KEY MAP SHOULD POINT TO THE WEST. |
| | C. WILL SIDEWALK HAVE A THICKENED EDGE? PROVIDE A |
| | DETAIL OF THE SIDEWALK IF SO. |
| | D. SHOW HEIGHT OF SITE WALL. |
| | E. CREATE A SWALE OR BERM ALONG THE PROPERTY LINE TO |
| | PREVENT DIRECT RUNOFF ONTO THE ADJACENT PROPERTY. |
| | F. SHOW CURBING ADJACENT TO THE ISLAND AND IN-BOUND |
| | DRIVEWAY. |
| | |
| | 27. SECTION H-H |
| | A. SHOW HEIGHT OF SITE WALLS. |
| | B. WHY CAN???T THE FRONT OF SIDEWALK NEAREST THE R/W |
| | MATCH EXISTING GRADE? |
| | C. CREATE SWALE BEHIND EAST SITE WALL TO PREVENT |
| | RUNOFF FROM FLOWING ONTO SIDEWALK. |
| | |
| | 28. PROVIDE DETAIL SHOWING 18-INCH PIPE CONNECTION TO |
| | TRENCH DRAIN. |
| | |
| | 29. SECTION G-G SHOWS THE DRIVEWAY SLOPING TO THE |
| | NORTH. THE TRENCH DRAIN ACROSS N. FLAGLER DRIVEWAY |
| | NEEDS TO EXTEND TO NORTH CURB LINE. |
| | |
| | 30. CONSIDER ADDING TRENCH DRAIN ALONG NORTH CURB LINE |
| | WEST OF THE SIDEWALK CROSSING OF THE N. FLAGLER |
| | DRIVEWAY TO REDUCE THE AMOUNT OF RUNOFF FLOWING ACROSS |
| | THE SIDEWALK CROSSING. |
| | |
| | 31. DRIVEWAY APRONS WITHIN THE RIGHT OF WAY SHOULD BE |
| | CONCRETE. |
| | |
| | 32. CONSIDER MOVING SANITARY MANHOLE SS-05 OUT OF THE |
| | DRIVEWAY AND OUT OF THE SIDEWALK. COORDINATE WITH THE |
| | PUBLIC UTILITIES DEPARTMENT. |
| | |
| | 33. REMOVE STRUCTURES ST-28 AND ST-34 OUT OF THE ALLEY |
| | R/W. |
| | |
| | 34. SOUTH EDGE OF ALLEY NEEDS TO MEET EXISTING GRADE AT |
| | RIGHT OF WAY. |
| | |
| | 35. WILL SIDEWALK AT DROPOFF AREA BE FLUSH WITH |
| | PAVEMENT AND/OR HAVE THICKENED EDGE? |
| | |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | 561-494-1120 (O) |
| | 561-351-0510 (M) |
| | [email protected] |
| | |
| |