| 2022-09-01 15:35:08 | PLEASE PROVIDE WRITTEN RESPONSES TO THE FOLLOWING: |
| | -RESPONSE LETTER SAID FDC LOCATIONS HAVE NOT BEEN |
| | FINALIZED. REMINDER TO FINALIZE FDC LOCATIONS. |
| | -RESPONSE LETTER SAID ORDERING ADDITIONAL SURVEY. |
| | REMINDER TO SUBMIT ADDITIONAL SURVEY. |
| | -SOME PAVEMENT RESTORATION AREAS ON SHEET C600 AND C500 |
| | STILL APPEAR TO BE MISSING FOR PROPOSED SEWER MAINS ON |
| | FLAGER DR. AND PINE ST. DIXIE MAY BE NEEDED ALSO. |
| | -EAST SIDE OF FLAGLER SHOWS BIG CONCRETE SLAB PROPOSED |
| | ON SHEET C500. PLEASE DESCRIBE THE PURPOSE OF THE |
| | CONCRETE SLAB AND IF ANYTHING IS GOING ON TOP OF IT. IF |
| | THERE IS A PLAN SHEET SHOWING PROPOSED USE, PLEASE |
| | PROVIDE THE REFERENCE NUMBER. |
| | -ON SHEET C611 PLEASE REMOVE WS10 AND REPLACE WITH WS5 |
| | REV SEP2019. |
| | -THERE IS A WATER MAIN PROJECT AT INTERSECTION OF |
| | BUTLER AND BROWARD THAT MAY HAVE STARTED ALREADY AND |
| | CIVIL ENGINEER SHOULD BE AWARE OF. |
| | -SHEET C500 DOES NOT MATCH HARDSCAPE PLAN L3-1-01 WITH |
| | RESPECT TO THE SIDEWALK DESIGN AT WEST SIDE OF FLAGLER |
| | ADJACENT TO SOUTHEAST CORNER OF 1923 N FLAGLER DR. |
| | -SHEET C602 AND C600: LABEL SANITARY SEWER MAIN RUNNING |
| | NORTH AT BUTLER AND BROWARD INTERSECTION WITH PIPE SIZE |
| | AND MATERIAL TYPE. IF IT IS 10 INCH VCP, WILL |
| | WASTEWATER DESIGN WORK ALRIGHT? |
| | -SHEET C600: AT WESTERN SIDE OF PINE ST THERE IS |
| | CALLOUT FOR EXISTING FIRE HYDRANT. VERIFY IF IT IS |
| | THERE AS DO NOT SEE ON HISTORIC PICTURES OF AREA. IF |
| | THERE, ADD SYMBOL. IF NOT, REMOVE CALLOUT. |
| | -SHEETS C600 AND C602: FOR THE PROPOSED 3 INCH AND 4 |
| | INCH METERS, THE FOOTPRINT WOULD BE MUCH LARGER THAN |
| | SHOWN. ALSO THE WATER SERVICE LINES AND CURBSTOPS COULD |
| | NOT BE 2 INCH SIZE OR PE, AND MAY NEED SPACING FURTHER |
| | APART. |
| | -LANDSCAPING PLAN L0.1.01 SHOWS LARGE UTILITY POLE AND |
| | TREE CONFLICTS WITH PROPOSED WATER SERVICES AND METER |
| | BOXES. NEED APPROPRIATE HORIZONTAL CLEARANCE DISTANCE. |
| | -SOME PLANS SHOW LARGE UTILITY POLE NEAR NORTHEAST |
| | CORNER OF NORTHWEST DRIVEWAY. PLEASE MAKE SURE IT IS |
| | ACCOUNTED FOR IN CIVIL PLANS. |
| | -UTILITIES DESIGN ON LANDSCAPING PLANS DOES NOT MATCH |
| | CIVIL ENGINEERING PLANS. PLEASE MAKE SURE BOTH SETS OF |
| | PLANS MATCH BASIC UTILITIES DESIGN AND THERE ARE NO |
| | CONFLICTS BETWEEN LANDSCAPING AND UTILITIES. |
| | -L0.1.01 AREA 3 SAYS GARDEN CAF? SEATING. PLEASE |
| | PROVIDE MORE INFORMATION ON THAT AREA. IS IT JUST GRASS |
| | AREA THAT PEOPLE CAN SIT ON, OR WILL THERE BE TABLES |
| | AND CHAIRS THERE? IF A PLAN SHEET SHOWS MORE INFO ON |
| | IT, PLEASE ALSO PROVIDE THAT REFERENCE NUMBER. |
| | -UTILITY WOULD PREFER THE PROPOSED 3 INCH AND 4 INCH |
| | METERS (NOT BACKFLOWS) CLOSER TO CURB IN THE |
| | LANDSCAPING AREA IF PROPER SPACING AND CLEARANCE |
| | DISTANCE COULD BE ACHIEVED WITH THE TREES. |
| | -FOR THE PROPOSED 3 INCH AND 4 INCH METERS TO THE |
| | NORTHEAST, ADD WORDING ABOVE-GROUND TO LABELS. |
| | RESPECTFULLY, |