2022-08-11 12:36:429. FLAGLER ASSEMBLAGE (Z22070008)
 THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. THE CITY?S OFFICIAL VERTICAL DATUM IS NGVD1929. THE
 CITY HAS ALLOWED THE USE OF NAVD1988 AS LONG AS THE
 CONVERSION EQUATION TO NGVD1929 AT THE PROJECT LOCATION
 IS PROVIDED. PROVIDE THE VERTICAL DATUM CONVERSION TO
 NGVD1929 ON THE SURVEY.
  
 2. MOVE THE TRENCH DRAIN OUTSIDE THE RIGHT OF WAY OF
 PINE STREET.
  
 3. DRAINAGE CALCULATIONS TO CONSIDER SEA LEVEL RISE ON
 THE GROUNDWATER TABLE AND TAILWATER CONDITIONS.
  
 4. JUSTIFY THE DIAMETER OF THE OUTFALL PIPE.
  
 5. WHAT WILL BE THE CONTRIBUTING AREA TO THE
 EXFILTRATION TRENCH UNDER THE DRIVEWAY TO N. FLAGLER
 DRIVE. THE HEAD ON THE TRENCH WILL BE LIMITED TO THE
 TRENCH DRAIN RIM ELEVATION.
  
 6. DESIGN ACCESS (HEIGHT CLEARANCE) TO EXFILTRATION
 TRENCH SYSTEMS FOR MAINTENANCE AND FUTURE REPLACEMENT
 WHEN THE EXFILTRATION TRENCHES ARE NO LONGER
 FUNCTIONING AS DESIGNED.
  
 7. SIDEWALK AND PARKING EASEMENTS WILL BE NEEDED FOR
 SIDEWALKS AND ON-STREET PARKING SPACES OUTSIDE THE
 RIGHT OF WAY.
  
 8. PROVIDE DETAIL OF CONTROL STRUCTURE AND SHOW THE
 WEIR ELEVATION ON THE PGD PLANS.
  
 9. BLEEDERS ARE NOT PERMITTED WITH EXFILTRATION TRENCH
 SYSTEMS.
  
 10. SHOW THE LIMITS OF THE PROPOSED ALLEY ABANDONMENT.
  
 11. SHOW HOW ALLEY GRADING WILL TRANSITION TO EXISTING
 GRADE.
  
 12. PROVIDE CROSS SECTIONS FROM CENTERLINE OF ROADWAY
 TO FACE OF BUILDING(S). LABEL STREET NAME AND SHOW
 RIGHT OF WAY LINE, SURFACE FEATURES AND SLOPES, BREAK
 POINTS, AND HORIZONTAL DISTANCES FROM RIGHT OF WAY LINE
 TO SURFACE FEATURES.
  
 13. PROVIDE SECTIONS AT ALL DRIVEWAYS FROM 5 FEET FROM
 EDGE OF PAVEMENT TO 5 FEET PAST HIGH POINT OF DRIVEWAY
 (OR TRENCH DRAIN). SHOW RIGHT OF WAY LINE AND DISTANCE
 FROM R/W TO EP, BACK OF SIDEWALK, HIGH POINT/TRENCH
 DRAIN.
  
 14. SHOW EXISTING STORM PIPE ON PINE STREET WEST OF AND
 CONNECTING TO THE EXISTING STORM MANHOLE SOUTHEAST OF
 STRUCTURE ST-31.
  
 15. LABEL EXISTING UTILITIES IN THE RIGHT OF WAY (PIPE
 SIZE, MATERIAL, ETC.)
  
 16. LABEL PROPOSED CURBS AND GUTTERS.
  
 17. PROVIDE PROPOSED FINISHED FLOOR ELEVATIONS ON THE
 PGD PLANS.
  
 18. SHOW MILL AND RESURFACING LIMITS AND PAVEMENT
 MARKINGS WITHIN THESE LIMITS.
  
 19. WATER MAIN MAY BE IN CONFLICT WITH PROPOSED
 STRUCTURE ST-31.
  
 20. THERE APPEARS TO BE A LOW POINT IN THE EP IN FRONT
 OF THE DRIVEWAY TO BUTLER STREET OPPOSITE BROWARD AVE.
 HOW WILL THIS AREA IN FRONT OF THE DRIVEWAY DRAIN?
  
 21. PROVIDE ADDITIONAL EXISTING GRADES ALONG THE EP OF
 N. FLAGLER DRIVE, NORTH OF THE PROPOSED DRIVEWAY.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP
 CRITERIA. STORMWATER CALCULATIONS WILL BE REVIEWED WITH
 THE ENGINEERING PERMIT SUBMITTAL.
  
 2. PROVIDE COPY OF SFWMD ERP PERMIT MODIFICATION BEFORE
 START OF CONSTRUCTION.
  
 3. PROVIDE EROSION AND SEDIMENT CONTROL PLAN WITH THE
 ENGINEERING PERMIT SUBMITTAL.
  
  
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  