| Date |
Text |
| 2022-07-08 13:29:52 | TRAFFIC STUDY COMMENTS |
| | 1) PROVIDE UPDATED COUNTY TPS LETTER |
| | 2) FIGURE 1-3 DEPICTING THE I-95 FUTURE DIAMOND |
| | INTERCHANGE IS OUTDATED. PLEASE PROVIDE A MORE RECENT |
| | AND UPDATED ONE |
| | 3) THE PRIOR SITE WAS APPROVED UNDER THE CONDITIONS |
| | THAT DEVELOPMENT(S) ON THESE PARCELS TOTALING 11.61 |
| | ACRES SHALL BE RESTRICTED TO GENERATE NO MORE THAN |
| | 10,677 WEEKDAY DAILY EXTERNAL TRIPS OR 331 WEEKDAY AM |
| | PEAK HOUR EXTERNAL TRIPS OR 1,003 WEEKDAY PM PEAK HOUR |
| | EXTERNAL TRIPS, OR AS REVISED, WHEN EVALUATED USING THE |
| | LATEST PALM BEACH COUNTY TRIP GENERATION RATES PER THE |
| | FLU AMENDMENT TRAFFIC ANALYSIS. THE PROPOSED |
| | DEVELOPMENT IS NOT IN COMPLIANCE OF THE AM PEAK |
| | CONDITION. THUS, A REDUCTION IN DEVELOPMENT INTENSITIES |
| | AND/OR SIGNIFICANT MITIGATION MEASUREMENTS MUST BE |
| | DISCUSSED AND IMPLEMENTED. |
| | |
| | SITE PLAN COMMENTS |
| | 1) COORDINATE WITH FDOT WITH RESPECT TO THE I-95/45TH |
| | ST INTERCHANGE RECONSTRUCTION. PROPOSED DEVELOPMENT'S |
| | DRIVEWAY AND INTERSECTION CONFIGURATION AT 45TH ST MUST |
| | MATCH OR ALIGN WITH THE FUTURE INTERCHANGE DESIGN |
| | 2) DEPENDING ON FDOT INTERCHANGE DESIGN, THE EXISTING |
| | BICYCLE LANE MUST BE MAINTAINED AND IMPROVED OR |
| | POSSIBLY SUBSTITUTED WITH A MULTI-USE PATH ALONG SITE |
| | FRONTAGE |
| | 3) PROVIDE AUTOTURN ANALYSIS FOR GARBAGE TRUCK AND/OR |
| | SERVICE VEHICLES DRIVING IN AND OUT OF THE PROPOSED |
| | DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES CLEARLY |
| | DEFINED. PROVIDE AN ANALYSIS FOR THE LOADING ZONE |
| | NEARBY THE GARAGE ENTRANCE AS WELL. ANALYSIS SHOULD BE |
| | PROVIDED IN A SEPARATE FILE/DRAWING. PLEASE PROVIDE |
| | DOCUMENT NAME AND SHEET NUMBER SHOWCASING THE ANALYSIS. |
| | 4) PROVIDE TRANSPORTATION DEMAND MANAGEMENT (TDM) |
| | MEASURES |
| | |
| | VALERIO ORICCHIO |
| | CITY TRANSPORTATION ENGINEER |
| | 561-494-1092 |
| | [email protected] |
| | |
| |
Print |