Plan Review Notes
Plan Review Notes For Project Z22060030
Project Number Z22060030
Review Stop STORM
Sequence Number 3
Notes
Date Text
2022-12-08 11:50:36THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 12/8/22 PPRC SUBMITTAL. PREVIOUSLY SATISFIED COMMENTS
 ARE NOT INCLUDED.
  
 1. [PARTIALLY SATISFIED - CONVERSION EQUATION TO
 NGVD1929 NOT LISTED.] 12/8/22 UPDATED COMMENT ??? THE
 SURVEY LISTS THE CONVERSION FACTOR AS 1.50 FT. THE
 CIVIL PLANS LIST THE CONVERSION FACTOR AS 1.522 FEET.
 THE CONVERSION EQUATION SHOULD MATCH ON THESE
 DOCUMENTS.
  
 6. [NOT SATISFIED] PROVIDE CROSS SECTIONS FROM FACE OF
 BUILDING TO CENTERLINE OF RIGHTS OF WAY FOR 24TH
 STREET, 25TH STREET AND SPRUCE AVE. SHOW RIGHT OF WAY,
 OFFSET DISTANCES, SURFACE FEATURES, GENERAL SURFACE
 SLOPES WITH MAX. ALLOWED PERCENTAGES, BREAK POINTS,
 ETC.
  
 10. [NOT SATISFIED ??? EOR TO RESOLVE PRIOR TO
 ENGINEERING PERMIT SUBMITTAL.] CHECK THE PROPOSED
 ELEVATIONS AT THE BASE OF THE STEPS FOR THE UNITS ALONG
 25TH STREET VS. THE EXISTING BACK OF SIDEWALK
 ELEVATION. SOME PROPOSED ELEVATIONS APPEAR TO BE BELOW
 THE BOW OR MORE THAN 1 INCH ABOVE THE BOW.
  
 NEW COMMENTS (8/4/2022 SUBMITTAL):
  
 13. [NOT SATISFIED] JUSTIFY ALL OUTFALL PIPE DIAMETERS
 LARGER THAN 15 INCH. THIS INFORMATION CAN BE PROVIDED
 WITH ENGINEERING PERMIT SUBMITTAL.
  
 14. [SATISFIED ??? SHOWN ON SECTION B-B BUT EASEMENT
 LINES WILL NEED TO BE ADDED ON THE PLAN VIEWS OF THE
 CIVIL DRAWINGS PRIOR TO ENGINEERING PERMIT SUBMITTAL]
 SHOW THE LIMITS OF THE ALLEY EASEMENT ON THE CIVIL
 PLANS.
  
 15. [SATISFIED ??? MAINTENANCE RESPONSIBILITY TO BE
 INCLUDED IN THE DEVELOPER???S AGREEMENT WITH THE CITY.]
 A ADVISE WHO WILL BE MAINTAINING THE DRAINAGE SYSTEM
 WITHIN THE ALLEY EASEMENT.
  
 16. [NOT SATISFIED] PROVIDE A CROSS SECTION FOR THE
 ALLEY ENTRANCE FROM THE CENTERLINE OF 24TH STREET TO 5
 FEET NORTH OF THE NORTH RIGHT OF WAY OF 24TH ST. SHOW
 GRADE BREAKS, SURFACE MATERIALS, RIGHT OF WAY LINE,
 RIGHT OF WAY NAME, DIMENSIONS FROM RIGHT OF WAY TO
 GRADE BREAKS.
  
 17. [NOT SATISFIED ??? TO BE ADDED PRIOR TO ENGINEERING
 PERMIT SUBMITTAL] SHOW AND CALLOUT NEW CURBING ON 24TH
 STREET AND THE REMOVAL OF THE EXISTING CURBING FOR THE
 PROPOSED ALLEY DRIVEWAY AND LANDSCAPE ISLANDS.
  
 18. [SATISFIED] CAN NEW LANDSCAPE ISLANDS ON EITHER
 SIDE OF ALLEY ENTRANCE BE WIDENED TOWARD THE PARKING
 SPACES?
  
 19. [NOT SATISFIED] PROVIDE GRADES AROUND THE NEW ALLEY
 ENTRANCE.
  
 20. [PARTIALLY SATISFIED ??? LABEL ALL EXISTING
 UTILITIES ON THE PAVING AND GRADING, THE DRAINAGE AND
 THE WATER AND WASTEWATER PLAN SHEETS.] LABEL (SIZE AND
 MATERIAL) EXISTING UTILITIES IN THE RIGHT OF WAY.
  
 21. [NOT SATISFIED ??? ONLY STRUCTURES ARE SHOWN, NO
 PIPING.] SHOW UTILITIES ON THE LANDSCAPE PLANS AND
 COORDINATE THE LANDSCAPING AND UTILITY PLANS.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  