| Plan Review Notes For Project Z22060027 |
| Project Number |
Z22060027 |
|
| Review Stop |
STORM |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2022-09-29 16:16:29 | THE FOLLOWING COMMENT IS FROM THE REVIEW OF THE | | | 9/14/2022 RRESUBMITTAL: | | | | | | 1. THE PARK DRAINAGE SYSTEM DISCAHRGES INTO THE GAINES | | | PARK CANAL WHICH FLOWS INTO THE CARVER CANAL. BOTH THE | | | CARVER CANAL AND GAINES PARK CANAL ARE AT THEIR MAXIMUM | | | CAPACITY FOR THE 25-YEAR 1-DAY DESIGN STORM. ANY | | | ADDITIONAL RUNOFF VOLUME FOR THIS DESIGN STORM, | | | GENERATED BY THIS PROJECT, WILL NEED TO BE STORED | | | ONSITE. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | [email protected] | | | |
| |