2022-07-08 15:29:25-ON UTILITY PLAN UT1: SHOW AND LABEL WASTEWATER PUMP
 STATION NO. 29
 -ON UTILITY PLANS: SHOW AND LABEL ALL EXISTING WATER
 SERVICES LINES, WATER METERS, WATER METER BOXES, SEWER
 LATERAL CLEANOUTS, MANHOLES, AND BACKFLOW ASSEMBLIES AS
 SOME ARE MISSING.
 -ON SHEET UT1 NEAR NE AREA OF BUILDING THERE IS A DDCV
 LABELED. THE 3 INCH BACKFLOW ASSEMBLY IS NOT A DDCV
 TYPE AND APPEARS TO BE A DOMESTIC WATER RP CONNECTED TO
 2 INCH METER ADJACENT. NOTES IN SYSTEM SAY THE BACKFLOW
 VALVE IS TURNED OFF AND IN DISREPAIR. PLAN DESIGNER
 NEEDS TO INVESTIGATE FURTHER WHAT IT CURRENTLY SERVES
 AND IF IT IS NEEDED.
 -CONSIDER REPLACING ANY NON LEAD-FREE BACKFLOW
 ASSEMBLIES FOR WATER SERVICES THAT WILL BE USED FOR
 FOOD SERVICE OR DRINKING FOUNTAINS.
 -THERE IS FIRELINE DDCV NOT LABELED ON UT1 NEAR
 SOUTHWEST AREA OF SHEET UT1. IT ALSO HAS A LEAKING OSY
 VALVE THAT NEEDS REPAIR.
 -LABEL FIRE HYDRANTS AND ADD THE SYMBOL TO LEGEND.
 THERE IS A FIRE HYDRANT THAT IS NOT SHOWN ON UT1 NEAR
 THE SOUTHWEST DDCV. PLEASE SHOW AND LABEL ON UT1. CAN
 EXPAND AREA OR ADD MATCHLINE AND SEPARATE SHEET IF
 NEEDED.
 -VERIFY EXISTING PUMPING STATION AND FORCE MAIN ARE
 SUFFICIENT FOR ANY INCREASED SEWER DEMAND.
 -SHEET UT1: FOR THE SEWER LATERALS THAT ARE BEING
 REMOVED, IS THE SEWER PLUMBING BEING REROUTED INSIDE
 THE BUILDING TO THE NORTHEAST END OF THE BUILDING?
 -REVIEW THE CALLOUTS, LABELS, AND LEADER LINES FOR THE
 SANITARY SEWER WORK NEAR NORTHEAST AREA OF UT1. THEY
 MAY BE POINTED OR LABELED INCORRECTLY.
 -VERIFY EXISTING METERED WATER SERVICES WILL BE
 SUFFICIENT FOR ANY INCREASED WATER DEMAND.
 -IF THERE ARE ANY HOSE BIBS FOR PUMP STATION
 MAINTENANCE, RECOMMEND VERIFYING THEY HAVE ADEQUATE
 BACKFLOW PROTECTION.
 -SHEET UT2: ADD SIZING OF PROPOSED METER; ADD SIZING OF
 PROPOSED BACKFLOW ASSEMBLY; ADD RP TO LABEL OF PROPOSED
 BACKFLOW ASSEMBLY. SHOW HARDSCAPE NEAR PROPOSED METER
 AND BACKFLOW ASSEMBLY AND ENSURE LOCATION OF METER AND
 BACKFLOW WILL BE IN LANDSCAPING; SHOW EXISTING LARGE
 UTILITY BOX BETWEEN WATER FOUNTAIN AND EXISTING
 BACKFLOW ASSEMBLY FOR COURTS; SHOW EXISTING WATER LINES
 FOR WATER FOUNTAIN AND TENNIS COURT BACKFLOW ASSEMBLY
 AND WHAT IS HAPPENING TO THEM. ALSO ENSURE THOSE WATER
 LINES ARE DOWNSTREAM OF A WATER METER.
 -SHEET UT3: ENSURE ALL SYMBOLS AND ABBREVIATIONS ARE ON
 SHEET LEGEND.
 -CANNOT FIND DEMO PLAN SHEET. PLEASE ADD TO PLAN SET.
 -UT1 DOES NOT SHOW SIZE OF EXISTING GAS SERVICE NEAR
 SOUTH SIDE. IS IT SUFFICIENT?
 -SHEET UT2: SHOW AND LABEL 42 INCH FORCE MAIN.
 -SHOW RAISED ELEVATION AREA NEAR POOL ON PGD1.
 -ADD WPB STANDARD DETAILS TO CIVIL DETAILS SHEETS FOR:
 FIRE HYDRANT, SMALL METERED WATER SERVICE, FIRELINE
 DETECTOR BACKFLOW, SMALL BACKFLOW ASSEMBLY, LARGE
 BACKFLOW ASSEMBLY.