| Date |
Text |
| 2022-12-22 11:05:03 | APPROVED WITH THE FOLLOWING CONDITIONS: |
| | 1) PROVIDE A COMPLETE PAVEMENT MARKING AND SIGNAGE PLAN |
| | FOR EACH OF THE GARAGE FLOORS |
| | 2) PROVIDE A CROSSWALK ACROSS FLAGLER NORTH OF DIANA PL |
| | |
| | PREVIOUS COMMENTS |
| | 1) SATISFIED. PROVIDE TURNAROUND SPACE ON THE NORTHEAST |
| | DEAD-END |
| | 2) SATISFIED. PLEASE PROVIDE A TRANSPORTATION SITE |
| | PLAN, SHOWCASING ALL RELATED TRANSPORTATION FEATURES |
| | (E.G. ROADWAY, TRAVEL LANE, SIDEWALK, VISIBILITY |
| | TRIANGLE, CORNER CLEARANCE, ETC) PROPERLY DIMENSIONED. |
| | PLEASE INCLUDE BASIC CURB DETAILS (E.G. DRIVEWAY, CURB |
| | CUTS, PAVEMENT MARKINGS, PARKING STALLS, ETC.) ON THE |
| | OPPOSITE SIDE OF THE ROADS SURROUNDING THE PROPOSED |
| | DEVELOPMENT. IF ALREADY CREATED OR PREVIOUSLY |
| | SUBMITTED, PLEASE PROVIDE IT AT NEXT RESUBMISSION. SOME |
| | DIMENSIONS MISSING (E.G. TRAVEL LANE, ROAD WIDTH) |
| | 3) SATISFIED. PROVIDE A SIGNAGE AND PAVEMENT MARKING |
| | PLAN. INCLUSIVE OF ALL FEATURES WITHIN THE PROPOSED |
| | DEVELOPMENT AND ALONG ALL ROADS FRONTING THE SITE. IF |
| | ALREADY CREATED OR PREVIOUSLY SUBMITTED, PLEASE PROVIDE |
| | IT AT NEXT RESUBMISSION |
| | 4) SATISFIED. SHEET A-102 PROVIDE TURNAROUND SPACE FOR |
| | THE SOUTH-EAST PARKING AREA AT THE DEAD-END ON THE EAST |
| | SIDE |
| | 5) SATISFIED. INSTALL AND SHOW IN THE GARAGE DRAWINGS |
| | THE LOCATION OF DO-NOT-ENTER SIGNS ACCORDING TO THE |
| | DEPICTED TRAFFIC CIRCULATION MARKINGS AT EACH INTERNAL |
| | INTERSECTION OR AT POTENTIAL CONFLICT LOCATION(S) (I.E. |
| | BY THE UP-RAMP IN SHEET A-103). TO BE CONVERTED AS A |
| | CONDITIONAL APPROVAL TO BE FULFILLED BY ENGINEERING |
| | PERMITTING |
| | 6) SATISFIED. PLEASE PROVIDE A REVISED AUTOTURN |
| | ANALYSIS, SHOWCASING BOTH WHEEL PATHS AND VEHICLE |
| | DYNAMIC ENVELOPE IN DIFFERENT COLORS. ENGINEERING |
| | SERVICES CAN PROVIDE A SAMPLE AUTOTURN ANALYSIS THAT |
| | MEETS THE REQUIREMENT |
| | 7) SATISFIED. LATEST AUTOTURN ANALYSIS SHOWS SEVERAL |
| | INSTANCES OF TRUCK WHEEL-PATHS RUNNING OVER THE CURB. |
| | PROVIDE DETAILS OF MITIGATION MEASURES (E.G. MOUNTABLE |
| | CURBS, REINFORCED CONCRETE, CORNER RE-DESIGN) AT EACH |
| | AFFECTED LOCATION |
| | 8) SATISFIED. PER PREVIOUS DISCUSSIONS, IMPLEMENT A |
| | 4-FEET WIDE BIKE LANE, PLUS 1-FOOT BUFFER ON BOTH |
| | SIDES, ALONG DIANA PL AND CORRESPONDING SIGNAGE AND |
| | PAVEMENT MARKINGS |
| | |
| | VALERIO ORICCHIO |
| | CITY TRANSPORTATION ENGINEER |
| | 561-494-1092 |
| | [email protected] |
| | |
| | |
| |