| Plan Review Notes For Project Z22050025 |
| Project Number |
Z22050025 |
|
| Review Stop |
L |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2022-10-28 15:13:46 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: FLAGLER TOWER Z22050025 | | | OCTOBER 28, 2022 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. SATISFIED. THE SIDEWALK ELEVATION IS PROPOSED TO BE | | | RAISED ALONG THE SOUTH SIDE OF THE PROJECT, RESULTING | | | IN A STEEPER SLOPE BETWEEN THE SIDEWALK AND THE STREET | | | CURB ADJACENT TO THE PARKING SPACES ALONG DIANA PLACE. | | | THE 3:1 SLOPE MAY CAUSE STABILIZATION AND MAINTENANCE | | | ISSUES WITH THE SOIL, MULCH AND GRASS AROUND THE TREES. | | | THERE WILL BE ACCESS DIFFICULTY FOR PEOPLE TRYING TO GO | | | FROM THE PARKING TO THE SIDEWALK. | | | | | | 2. SATISFIED. SHOW LOCATIONS OF ALL UTILITIES ON THE | | | LANDSCAPE PLAN INCLUDING DRAINAGE TO DEMONSTRATE THERE | | | ARE NO CONFLICTS WITH THE APPROVED TREE LOCATIONS. | | | | | | ADDITIONAL COMMENTS 10/28/22: | | | 3. SPACING OF THE LIVE OAK TREES ALONG SOUTH FLAGLER | | | HAS BEEN CHANGED. THIS WAS NOT CLOUDED ON THE PREVIOUS | | | SUBMITTAL. MAXIMUM SPACING IS 30 FEET ON CENTER FOR THE | | | STREET TREES. THE PLAN APPROVED WITH THE PD REZONING | | | SHOWS THE CORRECT SPACING, A WAIVER WAS NOT APPROVED TO | | | VARY FROM THE REQUIREMENT. REFERENCE SHEET LG 3.1 | | | REVISED 10/29/2021. | | | | | | |
| |
Print |
|