| Plan Review Notes For Project Z22050025 |
| Project Number |
Z22050025 |
|
| Review Stop |
L |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2022-09-06 17:04:19 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER | | | 561-822-1462 | | | PROJECT: FLAGLER TOWER Z22050025 | | | SEPTEMBER 6, 2022 | | | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND | | | PROVIDE THE FOLLOWING COMMENTS: | | | | | | 1. SATISFIED. THE SIDEWALK ELEVATION IS PROPOSED TO BE | | | RAISED ALONG THE SOUTH SIDE OF THE PROJECT, RESULTING | | | IN A STEEPER SLOPE BETWEEN THE SIDEWALK AND THE STREET | | | CURB ADJACENT TO THE PARKING SPACES ALONG DIANA PLACE. | | | THE 3:1 SLOPE MAY CAUSE STABILIZATION AND MAINTENANCE | | | ISSUES WITH THE SOIL, MULCH AND GRASS AROUND THE TREES. | | | THERE WILL BE ACCESS DIFFICULTY FOR PEOPLE TRYING TO GO | | | FROM THE PARKING TO THE SIDEWALK. | | | | | | 2. SATISFIED. SHOW LOCATIONS OF ALL UTILITIES ON THE | | | LANDSCAPE PLAN INCLUDING DRAINAGE TO DEMONSTRATE THERE | | | ARE NO CONFLICTS WITH THE APPROVED TREE LOCATIONS. | | | | | | |
| |
Print |
|