| Plan Review Notes For Project Z22050024 |
| Project Number |
Z22050024 |
|
| Review Stop |
TRAFFIC |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2022-07-26 12:29:08 | TRAFFIC COMMENTS | | | 1) SATISFIED. PROVIDE A TRAFFIC STUDY INCLUSIVE OF A | | | DETAILED QUEUE ANALYSIS | | | 2) SATISFIED. PROVIDE COUNTY TPS LETTER | | | 3) PROVIDE FDOT DRIVEWAY PRE-APPROVAL LETTER | | | | | | SITE COMMENTS | | | 4) SATISFIED. PROVIDE PARKING TABLE SHOWCASING THE | | | NUMBER OF REQUIRED AND PROVIDED PARKING SPACES, | | | INCLUSIVE OF ADA AND BICYCLE ONES | | | 5) SATISFIED. HOW ARE DELIVERIES HANDLED? IS THERE A | | | DESIGNATED LOADING ZONE? | | | 6) SATISFIED. ARE WALK-IN PICK-UPS ALLOWED? | | | 7) SATISFIED. EXPLAIN DRIVE-THRU OPERATIONS FROM | | | ORDERING TO PICK-UP | | | 8) SATISFIED. MAKE THE NORTH-EASTERN DRIVE AISLE BY THE | | | DUMPSTER ONE-WAY SOUTHBOUND. INSTALL SIGNAGE AND | | | PAVEMENT MARKINGS ACCORDINGLY | | | 9) SATISFIED. INSTALL A BUFFER ALONG THE NORTHERN | | | CIRCULAR PORTION OF THE EXTERNAL QUEUE LANE | | | 10) PROVIDE AUTOTURN ANALYSIS SHOWCASING AN SUV SIZED | | | VEHICLE FOR EACH OF THE DRIVE-THROUGH LANES | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | | | | |
| |
Print |
|