| Plan Review Notes For Project Z22050024 |
| Project Number |
Z22050024 |
|
| Review Stop |
PU |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2022-06-08 15:43:44 | -ADD NOTE THAT THIS IS WITHIN LS 70 BOUNDARY. | | | -WHERE IS THE POINT OF SERVICE? CALL OUT THE TRANSITION | | | FROM PUBLIC ROW TO PRIVATE AND LABEL THE MAINS | | | ACCORDINGLY. | | | - SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE DIRECTLY | | | TO ENGINEERING (SHEET 33 OF CITY OF WPB DEVELOPMENT | | | APPLICATION). PROVIDE CALCULATIONS ON PLANS OF EXISTING | | | AND PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, | | | MAXIMUM AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS | | | SHALL BE PER FAC 64E-6 FOR SEWER AND PER FAC 64-E.008 | | | FOR WATER. | | | -WHY IS THE CONNECTION OFF THE 8" STUB AND NOT THE 4"? | | | THE 8" IS A DEDICATED FIRE LINE AND CANNOT SERVE THE | | | PROPOSED PROPERTY. | | | -THE 8" FIRE LINE IS NOT THE CITY?S RESPONSIBILITY, BUT | | | YOU SHOULD VERIFY WITH THE FIRE DEPT. THAT RUNNING | | | UNDER THE BUILDING IS ACCEPTABLE. | | | | | | MIKE TECHNOW - [email protected] | | | |
| |
Print |
|