| Plan Review Notes For Project Z22050023 |
| Project Number |
Z22050023 |
|
| Review Stop |
STORM |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2022-06-06 13:15:21 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL | | | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION | | | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE | | | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT | | | APPLICATION PROCESSES. | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE | | | PLAN APPROVAL: | | | | | | 1. ENLARGE/RESHAPE THE LANDSCAPE ISLAND ADJACENT TO THE | | | DUMPSTER TO PREVENT RIGHT TURNS TO THE NORTH. POST A NO | | | RIGHT TURN SIGN IN THE ISLAND. | | | | | | 2. SUGGEST SLOPING PIPE BETWEEN STRUCTURES STR. 2 AND | | | STR. 3. | | | | | | 3. OKEECHOBEE BLVD IS MAINTAINED BY FDOT. | | | | | | 4. WILL TRAFFIC ARROW LANE MARKINGS BE MULTIPLE CARETS | | | INSTEAD OF ARROWS? | | | | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO | | | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING | | | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. | | | | | | 1. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP | | | CRITERIA, INCLUDING THE BASIN C-51 RULE. STORMWATER | | | CALCULATIONS WILL BE REVIEWED WITH THE ENGINEERING | | | PERMIT SUBMITTAL. | | | | | | 2. PROVIDE COPY OF SFWMD ERP PERMIT MODIFICATION BEFORE | | | START OF CONSTRUCTION. | | | | | | 3. PROVIDE EROSION AND SEDIMENT CONTROL PLAN WITH THE | | | ENGINEERING PERMIT SUBMITTAL. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | [email protected] | | | |
| |
Print |
|