2022-12-08 12:52:02TRAFFIC COMMENTS
 1) PARTIALLY SATISFIED. PROVIDE COUNTY TPS LETTER ONCE
 RECEIVED
 2) PARTIALLY SATISFIED. ADDRESS THE FDOT
 REQUIREMENTS/CONDITIONS IN THE TRAFFIC STUDY. PROVIDE A
 SPECIFIC PARAGRAPH AND/OR FURTHER NARRATIVE ADDRESSING
 FDOT COMMENT PERTAINING THE EVALUATION OF A NORTHBOUND
 RIGHT TURN LANE AT THE QUADRILLE & FERN INTERSECTION.
 PLEASE INSERT A SPECIFIC PARAGRAPH IN THE TRAFFIC STUDY
 ADDRESSING THIS ITEM AND PROVIDE FDOT FINAL OPINION IN
 THE APPENDIX
 3) FERN/QUADRILLE, FERN/DIXIE, LAKEVIEW/QUADRILLE
 VOLUME DEVELOPMENT SHEETS IN THE APPENDIX. PLEASE
 EXPLAIN THE NEGATIVE NUMBERS FOR THE RT PROJECT TRAFFIC
 4) PLEASE PROVIDE REASONING PERTAINING THE RTOR
 REDUCTION PARAMETER AND ITS VALUE. PLEASE REMOVE IT
 WHEN IT DOES NOT APPLY (E.G. WESTBOUND RT AT FERN AND
 DIXIE)
 5) UNLESS THE SAME VOLUMES ARE PRODUCED, PLEASE USE THE
 LATEST COUNTY INTERNAL CAPTURE SPREADSHEET, AND PROVIDE
 THE ACTUAL SPREADSHEET (NOT A PDF PRINTOUT) AS PART OF
 THE TRAFFIC REVIEW SUBMISSION MATERIAL
 6) PLEASE EXPLAIN WHY RT VOLUMES ARE OMITTED IN SYNCHRO
 TIMINGS ANALYSIS OUTPUT
 7) FERN/QUADRILLE SYNCHRO TIMINGS AND HCM, PLEASE
 EXPLAIN HOW FOR CERTAIN MOVEMENTS THE DELAY DECREASES
 WHEN COMPARING EXISTING VS FUTURE SCENARIOS, GIVEN THE
 SAME SIGNAL TIMING PLAN, BUT HIGHER VOLUMES IN THE
 LATTER
 8) WAS SYNCHRO TRAFFIC SIGNAL OPTIMIZATION FEATURE
 UTILIZED IN THE ANALYSIS? IF YES, PLEASE SPECIFY AND
 ELABORATE IN THE TRAFFIC STUDY
 9) PLEASE PROVIDE SYNCHRO NETWORK FILES AS PART OF THE
 TRAFFIC REVIEW SUBMISSION MATERIAL
 10) PLEASE INSERT PAGE NUMBERS FOR EACH PAGE OF THE
 TRAFFIC STUDY, INCLUDING APPENDIX ONES FOR EASE OF
 REFERENCE
 11) PAGE 9. THE 45 AND 90 PEAK-HOUR VEHICLES ARE FOR
 THE EASTBOUND RIGHT-TURN MOVEMENT, NOT THE LEFT ONE. A
 DECELERATION/STORAGE LANE IS WARRANTED. PLEASE UPDATE
 THE SITE PLAN(S) TO ACCOMMODATE SUCH FEATURE
 SITE COMMENTS
 12) PARTIALLY SATISFIED. PROVIDE A SIGNAGE AND PAVEMENT
 MARKING PLAN. INCLUSIVE OF ALL FEATURES WITHIN THE
 PROPOSED DEVELOPMENT AND ALONG ALL ROADS FRONTING THE
 SITE. C-101 IS MISSING SEVERAL STOP BARS AND
 CORRESPONDING SIGNS, ON-STREET PARKING STALLS ARE NOT
 MARKED, LOT LINES AND DRAINAGE POINTS CAN BE OMITTED
 13) PARTIALLY SATISFIED. PLEASE PROVIDE AUTOTURN
 ANALYSIS IN A SEPARATE FILE THAN THE TRANSPORTATION
 SITE PLAN. PLEASE SHOWCASE BOTH DYNAMIC ENVELOPE AND
 WHEEL PATHS IN DIFFERENT COLORS. PLEASE PROVIDE A COLOR
 LEGEND IN SHEET C-102 THROUGH C-104
 14) PLEASE REMOVE THE WB-67 NORTH SERVICE BAY. BASED ON
 C-102, IT SEEMS THE WIDTH OF THE DRIVEWAY CAN BE
 REDUCED, IF ONLY THE WB-67 SOUTH BAY WERE TO BE USED
 15) PARTIALLY SATISFIED. IDENTIFY AND DESIGNATE AN
 EASILY ACCESSIBLE MICRO-MOBILITY STATION AREA (MINIMUM
 8 X 20 FEET) AND PROVIDE BASIC ELECTRIFICATION
 READINESS WITH THE FOLLOWING SPECS: A CONDUIT (2-INCH
 SCHEDULE 40 PVC) TO THE POWER SOURCE WITH AN ELECTRICAL
 PULL BOX (240V / 10,000W CIRCUIT). PLEASE SHOWCASE AND
 CLEARLY MARK THIS ITEM IN THE C-101 SITE PLAN
 16) SATISFIED. PROVIDE A PARKING TABLE SHOWCASING THE
 NUMBER OF REQUIRED AND PROVIDED PARKING SPACES,
 INCLUSIVE OF ADA AND BICYCLE ONES
 17) SATISFIED. IN THE PAVEMENT, MARKING & SIGN PLAN,
 PROVIDE A TABLE SHOWCASING THE NUMBER OF EXISTING AND
 PROPOSED ON-STREET PARKING STALLS. PROVIDE THE NUMBER
 OF METERED STALLS THAT ARE BEING REMOVED OR RELOCATED,
 IF ANY
 18) PARTIALLY SATISFIED. ARE THERE ANY GATES PROPOSED?
 IF SO, CLEARLY SHOWCASE THE REQUIRED 20 FEET SETBACK
 DISTANCE FROM THE BACK OF THE SIDEWALK. ACKNOWLEDGMENT
 IS NOT SUFFICIENT, PLEASE PROVIDE A COMPLETE RESPONSE
 19) SATISFIED. IS VALET SERVICE PROPOSED OR
 CONTEMPLATED IN THE FUTURE?
 20) PARTIALLY SATISFIED. PLEASE EXPLAIN THE REASONING
 OR NECESSITY OF TWO EXIT LANES AT THE FERN ST DRIVEWAY.
 A VARIANCE REQUEST MUST BE SUBMITTED FOR THE EXCESSIVE
 WIDTH. PLEASE INSERT DIRECTIONAL ARROW PAVEMENT
 MARKINGS ACCORDINGLY.
 21) PARTIALLY SATISFIED. PLEASE EXPLAIN THE USE OF THE
 PARKING AREA ON DIXIE. PLEASE DESIGNATE SUCH STALL AS
 TEMPORARY COMMERCIAL LOADING/UNLOADING, DELIVERY AND
 SHARE DRIVING ONLY.
 22) NOT SATISFIED. THE PROPOSED SERVICE DRIVEWAY
 SIGNIFICANTLY EXCEEDS THE MAXIMUM ALLOWED WIDTH OF
 24-FEET. A VARIANCE REQUEST MUST BE SUBMITTED
 23) NOT APPLICABLE/DISREGARD. PER CITY CODE
 94-312(2)(A): ???THE NUMBER OF ACCESS POINTS TO SERVE A
 SITE SHALL BE KEPT AT A MINIMUM AND SHALL BE EVALUATED
 ON A CASE BY CASE BASIS???. FOR SAFETY AND OPERATIONAL
 PURPOSES, ACCESS SHOULD BE ESTABLISHED FROM THE LOWEST
 FUNCTIONAL CLASS OF ROADWAY HAVING FRONTAGE ON THE
 PROPOSED DEVELOPMENT. THUS, THE DRIVEWAY UNTO S DIXIE
 HIGHWAY SHOULD NOT BE ALLOWED, AS BOTH FERN ST AND
 GARDENIA ST CAN ACCOMMODATE ANY ACCESS NEEDS, WHILE THE
 PROPOSED DRIVEWAYS WOULD BE TOO DISRUPTIVE TO VEHICULAR
 AND PEDESTRIAN MOVEMENTS ALONG DIXIE. FURTHER
 DISCUSSION WILL BE PERFORMED BASED ON THE UPDATED
 DRIVEWAY DESIGN.
 24) PARTIALLY SATISFIED. PROVIDE GARAGE RAMPS SLOPES.
 ARE THE SLOPES FOR THE ENTRY AND EXIT RAMPS DIFFERENT,
 AS SHOWN IN A1.03?
 25) PARTIALLY SATISFIED. CLEARLY MARK/CALLOUT THE
 TURNAROUND SPACES AT THE GARAGE DEAD-ENDS. UNLESS
 AUTOTURN ANALYSIS PROVING FEASIBILITY IS PROVIDED, THE
 TURNAROUND SPACES IN A.103 (BY THE WESTERN HANDICAP
 STALL) AND THE ONES IN A 1.04, A1.06, A1.07 ARE NOT
 PROPER. NOTE: A PARKING STALL SIZE & CONFIGURATION
 SPACE SHOULD BE DEDICATED AND MARKED FOR TURNAROUND
 PURPOSES
 26) BIKE LANES ALONG THE SOUTH SIDE OF FERN ST ARE
 ENCROACHING THE PROPOSED DRIVEWAY. PLEASE RE-DESIGN
 ACCORDINGLY AND CLEARLY DIMENSION THE SEPARATION
 BETWEEN BIKE LANES AND PARKING STALLS; AS THERE IS
 CURRENTLY A 2-FEET SEPARATION BUFFER
 27) NOT APPLICABLE/DISREGARD. CONSIDER SHIFTING THE
 BIKE LANES AND REMOVING THE ON-STREET PARKING ON THE
 EAST LEG OF THE FERN/QUADRILLE INTERSECTION ALONG THE
 SOUTHERN SIDE OF FERN ST, SO TO ALLOW INSTALLATION OF A
 WESTBOUND LEFT-TURN STORAGE LANE
 28) PLEASE PROVIDE A DEDICATED TRAFFIC FOLDER/DOCUMENT
 CONTAINING ALL RELATED ITEMS IN FUTURE RESUBMISSIONS,
 INCLUSIVE OF PREVIOUSLY SUBMITTED FILES (I.E. FDOT
 LETTER)
 29) PROVIDE A CONSTRUCTION MANAGEMENT PLAN. PLEASE
 REFER TO CITY CODE SEC 86-246 FOR DETAILS. THIS COMMENT
 COULD BE A CONDITION OF APPROVAL, AND MUST BE SATISFIED
 BEFORE ENGINEERING PERMITTING IS ISSUED
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved