Plan Review Notes
Plan Review Notes For Project Z22050022
Project Number Z22050022
Review Stop PU-CS
Sequence Number 1
Notes
Date Text
2022-07-13 09:25:26PLEASE PROVIDE WRITTEN RESPONSES TO THE FOLLOWING:
  
 -VERIFY SEMI TRUCKS CAN ENTER GARDENIA FROM QUADRILLE
 AND EXIT GARDENIA ONTO DIXIE SAFELY.
  
 -THERE ARE SOME EXISTING UTILITY EASEMENTS NEAR THE
 WEST SIDE OF THE PROPERTY. WHAT IS HAPPENING TO THEM?
  
 -ON UTILITY PLAN, SHOW ALL EXISTING WATER AND SEWER
 SERVICES AND LABEL WHAT IS HAPPENING TO THEM.
  
 -BACKFLOW ASSEMBLIES SHOULD ON PRIVATE PROPERTY AND NOT
 IN RIGHT OF WAY.
  
 -PAVEMENT RESTORATION MAY BE NEEDED ON GARDENIA, FERN,
 AND DIXIE DUE TO PROPOSED UTILITY WORK IN ROAD. THERE
 MAY ALSO BE WATER SERVICES NEEDING REMOVAL IN THOSE
 AREAS.
  
 -THERE SEEMS TO BE AN EXISTING FIRELINE BACKFLOW
 ASSEMBLY NEAR THE NORTHWEST AREA OF PROPERTY. PLEASE
 ACCOUNT FOR IT IN PLANS.
  
 -METERS OVER 2 INCH SIZE NEED BE ABOVE GROUND. ADD
 ABOVE GROUND WORDING ON LABELS OF UTILITY PLAN.
  
 -DEMO PLAN SHOWS LARGE EXISTING VAULT IN FRONT OF 415
 S. DIXIE. WHAT TYPE OF UTILITY IS IT AND WHAT WILL
 HAPPEN TO IT?
  
 -ON C102 TRUCK TURN PLAN, PLEASE SHOW CURBING AND
 PARKING SPACES ON SOUTH SIDE OF GARDENIA FROM QUADRILLE
 TO DIXIE.
  
 -THERE ARE MANY EXISTING CITY PARKING SPOTS AND A BIKE
 PATH ON SOUTH SIDE OF FERN ST. WILL ANY OF THOSE BE
 AFFECTED BY THE PROJECT?
  
 -3 INCH METER REQUIRES 4 INCH TAP AND SERVICE LINE PER
 WPB STANDARD DETAILS.
  
 -SHOW UTILITY EASEMENT AROUND METERED WATER SERVICE ON
 PRIVATE PROPERTY. BACKFLOW ASSEMBLY SHOULD NOT BE IN
 UTILITY EASEMENT.
  
 -ON UTILITY PLAN, LEADER LINE FOR FPL DUCT BANK DOES
 NOT APPEAR POINTED CORRECTLY.
  
 -SEVERAL POSSIBLE CONFLICTS BETWEEN DUCT BANK IN ROW
 AND OTHER UTILITIES.
  
 -CONSIDER PARALLEL/DUAL BACKFLOW ASSEMBLIES ON DOMESTIC
 WATER SERVICES TO MINIMIZE WATER OUTAGES DURING
 BACKFLOW MAINTENANCE.
  
 -FOOTPRINT OF METERS AND BACKFLOWS MAY BE LARGER THAN
 SHOWN ON UTILITY PLAN.
  
 -SHOW EXISTING UTILITIES FOR NORTHEAST 3 STORY BUILDING
 ON CIVIL PLANS.
  
 -C300 UTILITY NOTE 4, WATER SERVICE LINES OVER 2 INCH
 SIZE NEED BE DIP.
  
 -IS SEPARATE METERED IRRIGATION WATER SERVICE NEEDED?
  
 -ON CIVIL PLANS 401 S. DIXIE IS NOT SEPARATED FROM REST
 OF BLOCK WITH PROPERTY LINES. WILL ENTIRE BLOCK BE ONE
 PROPERTY?
  
 --FIRELINE BACKFLOW NEED BE ON PRIVATE PROPERTY, OUT OF
 RIGHT OF WAY, AND MUST COMPLY WITH ALL NFPA RULES
 REGARDING LOCATION.
  
 -ADD NOTE TO UTILITY PLAN: LINESTOPS OR INSERTION
 VALVES MAY BE REQUIRED AS DIRECTED BY CITY WPB OR EOR
 TO MINIMIZE WATER OUTAGES TO CUSTOMERS.
  
 -ADD WATER SERVICE STANDARD DETAILS 4 AND 4.1 TO CIVIL
 PLAN SET
  
 -ADD STANDARD DETAIL GS-5 TO CIVIL PLAN SET
  
 -ADD WATER AND SEWER DEMAND CALCULATIONS TO UTILITY
 PLAN.
  
 -LABEL S. QUADRILLE BLVD ON CIVIL PLANS.
  
  
  