2022-08-23 08:45:41GENERAL COMMENTS:
  
 1.) IT IS RECOMMENDED THAT THE APPLICANT HOLD OUTREACH
 MEETINGS WITH THE RESIDENTS OF ONE CITY PLAZA
 CONDOMINIUM, AS THE PROPOSED PROJECT WILL HAVE A DIRECT
 IMPACT ON THE ADJACENT RESIDENTIAL CONDO BUILDING.
  
 [STAFF RESPONSE: REPEAT COMMENT - IN PROGRESS.
 ACCORDING TO THE APPLICANT?S PPRC RESPONSE LETTER
 (8/12/22), THE APPLICANT IS AWARE THAT IT IS NECESSARY
 TO ENGAGE WITH THE NEIGHBOR PRIOR TO THE PROJECT
 PROCEEDING TO A DAC MEETING. THIS IS STILL IN PROGRESS.
 ONCE THE MEETING(S) HAVE BEEN HELD, THE APPLICANT WILL
 BE REQUIRED TO PROVIDE DOCUMENTATION/NECESSARY
 CORRESPONDENCE REGARDING THE MEETING(S).]
  
  
 2.) ALTHOUGH THE PROJECT IS WITHIN THE TRAFFIC
 CONCURRENCY EXCEPTION AREA (TCEA), A LETTER FROM THE
 PALM BEACH COUNTY TRAFFIC DIVISION IS STILL REQUIRED.
 PLEASE CONTACT THE PALM BEACH COUNTY TRAFFIC DIVISION
 AT (561) 684-4030 FOR INFORMATION ON HOW TO OBTAIN THE
 REQUIRED TRAFFIC LETTER.
  
 [STAFF RESPONSE: REPEAT COMMENT - IN PROGRESS.
 ACCORDING TO THE APPLICANT?S PPRC RESPONSE LETTER
 (8/12/22), THE APPLICANT ACKNOWLEDGES THE COMMENT AND
 HAS NOTED THAT THE TPS ANALYSIS IS CURRENTLY UNDER
 REVIEW AT PALM BEACH COUNTY. THIS LETTER IS REQUIRED
 PRIOR TO THE PROJECT PROCEEDING TO A DAC MEETING.]
  
  
 3.) A PREDETERMINATION LETTER FROM THE FLORIDA
 DEPARTMENT OF TRANSPORTATION (FDOT) SHALL BE REQUIRED
 FOR THE PROPOSED ACCESS POINTS AND/OR STREETSCAPE
 IMPROVEMENTS ALONG SOUTH DIXIE HWY, LAKEVIEW AVENUE AND
 OKEECHOBEE BOULEVARD (FDOT CONTROLLED ROWS). THIS
 PREDETERMINATION LETTER IS REQUIRED PRIOR TO THE
 SCHEDULING OF THIS APPLICATION FOR THE DOWNTOWN ACTION
 COMMITTEE (DAC) TO ENSURE THE ACCESS POINTS AND
 STREETSCAPE REQUIREMENTS ARE FEASIBLE.
  
 [STAFF RESPONSE: THANK YOU FOR PROVIDING THE FDOT
 PREDETERMINATION LETTER; HOWEVER, THE LETTER FROM FDOT,
 DATED 8/4/2022, HAS INCORRECT INFORMATION ON THE UNIT
 COUNT AND COMMERCIAL BUILDING SQUARE FOOTAGES FOR THE
 PROJECT. THIS MUST BE CORRECTED FOR CONSISTENCY. PLEASE
 CONTACT FDOT TO REVISE LETTER WITH THE CORRECT
 BUILDING/UNIT CALCULATIONS. THE LETTER FROM FDOT IS
 REQUIRED PRIOR TO THE PROJECT PROCEEDING TO A DAC
 MEETING.]
  
  
 4.) PROVIDE A LETTER ENSURING FAA COMPLIANCE (A
 DETERMINATION OF NO HAZARD) IN REGARD TO THE HEIGHT OF
 ANY TOWERS OR STRUCTURES WITHIN THE DESIGNATED FLIGHT
 PATHS.
  
 [STAFF RESPONSE: IT WAS BROUGHT TO STAFF'S ATTENTION
 THAT THE APPLICANT SHOULD OBTAIN THE FAA COMPLIANCE
 LETTER. AN EMAIL TO THE APPLICANT WENT OUT ON 8/11/2022
 TO INFORM THE APPLICANT OF THE LETTER REQUIREMENT.
 APPLICANT IS AWARE THE PROCESS TO OBTAIN THE COMPLIANCE
 LETTER IS REQUIRED. PLEASE START PROCESS AND/OR
 FOLLOW-UP WITH FAA ASAP.]
  
  
 5.) PLEASE ENSURE ALL PLAN SHEETS MATCH FOR CONSISTENCY
 (I.E. SITE PLAN, LANDSCAPE PLAN, CIVIL PLANS, ETC.)
  
 [STAFF RESPONSE: NOT FULLY ADDRESSED. THERE ARE STILL
 INCONSISTENCIES IN THE PLAN SET. ANY CHANGES MADE TO
 THE PLANS REQUIRES ALL PLAN SHEETS TO BE UPDATED FOR
 CONSISTENCY. PLANNING STAFF WILL WORK WITH THE
 ARCHITECT AND LANDSCAPE ARCHITECT TO IDENTIFY/ADDRESS
 THESE INCONSISTENCIES.]
  
  
 6.) AS DISCUSSED WITH THE ARCHITECT ON 7/19/2022, THE
 PROJECT CALCULATIONS WILL NEED TO BE REVISED/CORRECTED
 THROUGHOUT THE PLAN SHEETS FOR ACCURACY. THE ARCHITECT
 ACKNOWLEDGES THESE INCONSISTENCIES WITH THE PROJECT
 NUMBERS AND WILL ADDRESS (THE ARCHITECT SHOULD ALSO
 SCHEDULE A TIME TO DISCUSS THE SPECIFIC INCONSISTENCIES
 WITH STAFF): A) BUILDING AREA CALCULATIONS. B) FAR
 CALCULATIONS AND DIAGRAMS.
  
 [STAFF RESPONSE: PLEASE HAVE THE ARCHITECT CONTACT
 STAFF DIRECTLY TO CLARIFY THE CALCULATIONS.]
  
  
 7.) PLEASE PROVIDE MORE INFORMATION ON WHICH OPTION THE
 PROJECT WILL SATISFY PER S.94-111(T)(5) OF THE ZLDRS,
 SINCE THE PROJECT WILL EXCEED THE SOFT MAXIMUM (BUT AT
 UNDER 50%). IT IS ASSUMED THAT THE APPLICANT WILL
 COMPLY WITH THE TRANSPORTATION DEMAND MANAGEMENT (TDM)
 REQUIREMENTS, BUT STAFF WILL NEED THE INFORMATION ON
 HOW THE PROJECT WILL ?EARN? THE ADDITIONAL PARKING
 SPACES (ABOVE THE SOFT MAX). IT APPEARS THAT THE
 PROJECT EXCEEDS THE SOFT MAXIMUM BY 60 PARKING SPACES
 (PLEASE CHECK CALCULATIONS). THERE MUST BE A CLEAR
 UNDERSTANDING OF HOW THIS WILL BE ACHIEVED BY DAC.
  
  
  
 STREETSCAPE REQUIREMENTS:
  
 1.) A SIDEWALK WITH A MINIMUM OF 8 FT. CLEAR WIDTH
 SHALL BE PROVIDED ALONG THE BUILDING FRONTAGE. PRIVATE
 SIDEWALK WHICH SERVE AS AN EXTENSION OF THE PUBLIC
 SIDEWALK SHALL COMPLY WITH THE STREETSCAPE
 REQUIREMENTS, SHALL MATCH THE PUBLIC SIDEWALK IN DESIGN
 AND MATERIAL, AND SHALL PROVIDE A SEAMLESS TRANSITION
 BETWEEN THE TWO. PLEASE DEMONSTRATE IN THE PLANS AND
 PROVIDE DIMENSIONS TO ILLUSTRATE COMPLIANCE WITH THE
 ZLDRS.
  
 [STAFF RESPONSE: DIMENSIONS ARE NOW PROVIDED IN THE
 SITE PLAN (SHEET C-103); HOWEVER, THE 8 FT. CLEAR
 SIDEWALK REQUIREMENT DOES NOT APPEAR TO HAVE BEEN MET
 ALONG SOUTH DIXIE HIGHWAY. A LANDSCAPE PLANTER SEEMS TO
 INTERRUPT THE 8 FT. CLEARANCE. WHAT IS THE PURPOSE OF
 THE PLANTER ALONG SOUTH DIXIE HIGHWAY? CAN THIS BE
 SHIFTED OR ELIMINATED TO RESOLVE THE ISSUE?
 ADDITIONALLY, PLEASE CHECK DIMENSIONS, THE SIDEWALK
 DIMENSIONS ALSO CONFLICT WITH THE DIMENSIONS PROVIDED
 IN THE LANDSCAPE PLAN (WHICH SHOWS THE 8 FT. CLEARANCE
 HAS BEEN MET).).
  
  
 2.) REQUIRED BICYCLE PARKING IS NOW PROVIDED ALONG THE
 STREET FRONTAGE; HOWEVER, THE CALCULATIONS, THE
 DEPICTION IN THE PLANS AND THE DETAIL ARE ALL
 INCONSISTENT. PLEASE ADDRESS.
  
 [STAFF RESPONSE: THERE ARE STILL ISSUES WITH THE
 BICYCLE PARKING CALCULATIONS. STAFF WOULD NEED TO SEE A
 BREAKDOWN OF PARKING PROVIDED FOR COMMERCIAL (INCLUDING
 HOTEL) AND RESIDENTIAL USES SEPARATELY TO DETERMINE IF
 THE CALCULATIONS AND REQUIREMENT CORRECTLY AND
 INCOMPLIANCE WITH THE STANDARDS FOR BICYCLE PARKING IN
 S.94-111 OF THE ZLDRS. ADDITIONALLY, WHERE IS THE
 BICYCLE RACK DETAIL(S) FOR THE PROJECT? THE DETAIL MUST
 BE INCLUDED IN THE PLAN SET, AS THE CITY HAS DESIGN
 STANDARDS FOR BICYCLE PARKING. PLEASE PROVIDE TO
 DEMONSTRATE COMPLIANCE WITH THE ZLDRS.]
  
  
 3.) DRIVEWAYS AND CURB CUTS SHALL BE DESIGNED TO
 MINIMIZE THE NEGATIVE IMPACT IN THE PEDESTRIAN PATH OF
 TRAVEL. DRIVEWAYS SHALL MAINTAIN THE SIDEWALK
 ELEVATION. PLEASE PROVIDE A SECTION PARALLEL TO THE
 STREET TO DEMONSTRATE COMPLIANCE. [ZLDR
 S.94-113(D)(10)]
  
 [STAFF RESPONSE: PARTIALLY ADDRESSED. ALL PLANS SHALL
 MATCH FOR CONSISTENCY. CURBS ARE STILL SHOWN ALONG
 LAKEVIEW AVENUE WHERE THE DRIVEWAY MEETS THE SIDEWALK
 ELEVATION.]
  
  
 4.) CURB CUTS, PARKING ENTRANCES, EXITS AND DRIVEWAYS
 SHALL BE SEPARATED AT LEAST 10 FT. TO MINIMIZE THE
 IMPACT OF A CONTIGUOUS CURB CUTS ON THE PEDESTRIAN
 ENVIRONMENT. THE DIMENSION FOR THE CURB CUT SEPARATION
 AT THE SOUTH INGRESS/EGRESS POINT HAS NOT BEEN PROVIDED
 TO DEMONSTRATE COMPLIANCE. [ZLDR S.94-111(O)]
  
 [STAFF RESPONSE: PARTIALLY ADDRESSED. CURB CUT
 SEPARATION MUST EXTEND INTO THE DRIVEWAY APRON TO
 PROVIDE ADEQUATE SAFETY FOR PEDESTRIANS (PURPOSE OF THE
 SEPARATION)].
  
  
 ARCHITECTURAL COMMENTS:
  
 1.) THE MATERIAL USED ON THE BUILDING IS NOW NOTED IN
 THE ARCHITECTURAL ELEVATIONS. PLEASE NOTE THAT PER
 TABLE IV-4, TINTED OR REFLECTIVE GLASS IS NOT
 PERMITTED. THE ELEVATIONS INDICATE THAT REFLECTIVE
 GLASS WILL BE USED. PLEASE ADDRESS.
  
 2.) STAFF IS REQUESTING A PHONE CONVERSATION TO DISCUSS
 THE PROPOSED WALL TREATMENT ON THE BLANK FA?ADE ALONG
 THE INTERIOR SIDE SETBACK. THE PROPOSED TREATMENT DOES
 NOT APPEAR TO BE CONSISTENT WITH THE DMP CODE FOR BLANK
 WALL FA?ADE TREATMENT. PLEASE WORK WITH STAFF TO
 ADDRESS THIS CONCERN.
  
 3.) PER HISTORIC'S EMAIL DATED 8/9/22, PLEASE SHOW
 DETAIL AND/OR LOCATION OF THE PILASTERS AND WOOD BEANS
 IN THE PROJECT.
  
  
 INSTRUCTIONS FOR RESUBMITTAL:
  
 * PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN
 WRITTEN FORMAT.
  
 * WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF FOUR
 (4) PAPER COPIES - 2 SETS IN FULL COLOR, ONE REDUCED
 COPY IN 11 INCHES X 17 INCHES, AND AN ELECTRONIC COPY
 OF ALL PLANS AND DOCUMENTS.
  
 * ANY CHANGES ON THE RESUBMITTED PLANS MAY RESULT IN
 ADDITIONAL COMMENTS.
  
 * PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1)
 RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED
 COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE
 APPLICANT WILL BE ASSESSED A RESUBMITTAL FEE. SUCH FEE
 WILL BE 20% OF THE ORIGINAL APPLICATION FEE. [STAFF
 NOTE: NO FEE IS REQUIRED FOR THE NEXT RESUBMITTAL ? THE
 7/5/22 PLANS SHOW THE APPLICANT IS WORKING WITH STAFF
 TO ADDRESS OUTSTANDING COMMENTS.]
  
 * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE
 QUESTIONS.
  
  
 CONDITIONS:
  
 * THE PROJECT SHALL OBTAIN LEED CERTIFICATION FROM THE
 LEADERSHIP ON ENVIRONMENTAL DESIGN (LEED) OR A SIMILAR
 NATIONALLY ACCREDITED ORGANIZATION. ALL REQUIREMENTS
 AND TIMEFRAMES SHALL BE MET PURSUANT TO SEC.
 94135(E.)(2.)(5) OF THE ZONING AND LAND DEVELOPMENT
 REGULATIONS (ZLDRS).
  
 * THE PROJECT EXCEEDS THE SOFT MAXIMUM REQUIREMENT FOR
 PARKING (BUT NOT OVER 50%). A CONTRIBUTION TO THE
 TRANSIT OPERATION FUND WILL BE REQUIRED. [ZLDR
 S.94-111]
  
 * A RESTRICTIVE COVENANT, OUTLINING THE OPERATION OF
 THE PROPOSED MECHANICAL PARKING SHALL BE EXECUTED ON
 CITY APPROVED FORMS AND RECORDED IN THE PUBLIC RECORDS.
  
 * THE PROJECT SHALL COMPLY WITH THE DELIVERY/SERVICE
 VEHICLES OPERATION, OVERALL CURBSIDE MANAGEMENT AND
 VALET OPERATIONS ONSITE PER THE ?320 LAKEVIEW -
 DELIVERY MANAGEMENT AND VALET OPERATIONS SUMMARY, WEST
 PALM BEACH, FLORIDA, KIMLEY-HORN #140998000,? PREPARED
 ON AUGUST 12, 2022, BY CHRISTOPHER W. HEGGEN, P.E., OF
 KIMLEY-HORN AND ASSOCIATES.
  