2022-09-29 16:00:36CONDITIONS FOR SITE PLAN APPROVAL ARE LISTED AT THE
 END.
  
 THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 9/23/2022 SUBMITTAL:
  
 3. [PARTIALLY SATISFIED] PROVIDE A TRENCH DRAIN ALONG
 THE WEST PROPERTY LINE TO INTERCEPT RUNOFF. ADDITIONAL
 COMMENTS: LANDSCAPE AREA SHOULD BE GRADED TO STORE
 RUNOFF (SWALE SECTION). PUBLIC OPEN SPACE AND SIDEWALK
 SHOULD BE GRADED TO DRAIN TO DS-04 AND DS-05. DS-04
 SHOULD BE IN A DEPRESSION TO COLLECT THE RUNOFF FROM
 THE OPEN SPACE AREA.
  
 5. [SATISFIED] PROVIDE CROSS SECTIONS FROM CENTERLINE
 OF RIGHTS OF WAY TO FACE OF BUILDING. SHOW BREAK
 POINTS, DISTANCES FROM BACK OF CURB TO PROPERTY LINE,
 FROM PROPERTY LINE TO FACE OF BUILDING, WIDTH OF
 SIDEWALK, CURB, ETC. LABEL THE RIGHT OF WAY (OKEECHOBEE
 BLVD, LAKEVIEW AVE, S. DIXIE HWY). ADDITIONAL COMMENTS:
 THE CROSS SECTIONS WILL SHOW HOW THE SIDEWALK AREAS AND
 DRIVEWAY APRONS WILL BE GRADED TO MEET A.D.A. CRITERIA.
 THE CONTOURING ON THE PAVING AND GRADING PLAN APPEAR TO
 RESULT IN SIDEWALK CROSS SLOPES STEEPER THAN 2%.
  
 6. [SATISFIED] PROVIDE EXISTING SPOT GRADES ALONG EDGES
 OF PAVEMENT. ADDITIONAL COMMENT: WHERE DID THE EXISTING
 SPOT GRADES COME FROM? THEY DO NOT APPEAR ON THE
 SURVEY.
  
 7. [PARTIALLY SATISFIED] PROVIDE PROPOSED FINISHED
 FLOOR ELEVATION. ADDITIONAL COMMENT: PROVIDE THE FFE'S
 ON THE CIVIL PLANS.
  
 8. [PARTIALLY SATISFIED] PROVIDE A DETAIL FOR THE
 EXFILTRATION TRENCH. LABEL THE WIDTH AND ELEVATIONS OF
 THE TOP AND BOTTOM OF THE TRENCH. ADDITIONAL COMMENT:
 REQUESTED INFORMATION CAN BE PROVIDED WITH THE
 ENGINEERING PERMIT SUBMITTAL.
  
 9. [NOT SATISFIED] PROVIDE A DETAIL FOR THE CONTROL
 STRUCTURE. THE CITY DOES NOT ALLOW THE USE OF BLEEDERS
 WITH EXFILTRATION TRENCH SYSTEMS. ADDITIONAL COMMENT:
 CONTROL STRUCTURE DETAIL CAN BE PROVIDED WITH THE
 ENGINEERING PERMIT SUBMITTAL.
  
 10. [SATISFIED] MINIMUM DIAMETER OF STORM PIPE TO BE
 INSTALLED IN THE RIGHT OF WAY IS 15 INCH RCP.
 ADDITIONAL COMMENT: PVC PIPE FROM DS-04 SHOULD BE RCP.
  
 NEW COMMENTS (7-5-2022 SUBMTITAL):
  
 11. [SATISFIED] CONTOURING OF SIDEWALK APPEARS TO
 RESULT IN CROSS SLOPES STEEPER THAN 2%.
  
 12. [PARTIALLY SATISFIED] REPLACE ALL DROP CURB OF
 EXISTING DRIVEWAYS WITH TYPE F CURB AND GUTTER.
 ADDITIONAL COMMENT: REPLACE THREE SECTIONS OF DROP CURB
 ON S. DIXIE HWY AND ONE SECTION OF DROP CURB ON
 OKEECHOBEE BLVD WITH TYPE F C&G. LABEL ALL NEW C & G ON
 THE PAVING AND GRADING PLAN.
  
 13. [PARTIALLY SATISFIED] INCLUDE IN THE LEGEND OF THE
 PAVING AND GRADING PLAN THE SPOT GRADE SYMBOLS AND
 CONTOUR LINE SYMBOL. USE A DIFFERENT SYMBOL FOR
 EXISTING SPOT GRADES. ADDITIONAL COMMENT: SAME SYMBOLS
 WERE USED FOR PROPOSED AND EXISTING SPOT GRADES.
  
 14. [SATISFIED] SHOW AND LABEL THE DRAINAGE CONTROL
 STRUCTURE.
  
 15. [PARTIALLY SATISFIED] INDICATE HOW WATER QUALITY
 TREATMENT WILL BE PROVIDED FOR THE RUNOFF FROM THE
 NORTHWEST CORNER OF THE SITE (DRAINING TO DS-04 AND
 DS-05). ADDITIONAL COMMENT ??? SEE NEW COMMENT #22
 BELOW.
  
 16. [SATISFIED] ENSURE THERE IS ADEQUATE VERTICAL
 CLEARANCE WITHIN THE BUILDING TO BE ABLE TO SERVICE THE
 EXFILTRATION TRENCHES AND DRAINAGE STRUCTURES AND TO BE
 ABLE TO REPLACE THE EXFILTRATION TRENCHES WHEN THEY ARE
 NO LONGER FUNCTIONING AS INTENDED.
  
 17. [SATISFIED] CONSIDER INCORPORATING LOW IMPACT
 DEVELOPMENT DRAINAGE SYSTEMS IN LIEU OR IN ADDITION TO
 THE EXFILTRATION TRENCHES.
  
 18. [SATISFIED] REFERENCE FDOT STANDARD PLAN NUMBERS
 INSTEAD OF FDOT STANDARD INDEX NUMBERS.
  
 NEW COMMENTS (SINCE 7-5-22 SUBMITTAL)
 19. SECTION A-A
 A. SHOW SWALE SECTION IN THE LANDSCAPE BED.
  
 20. SECTION B-B
 A. SHOW SWALE SECTIONS IN THE LANDSCAPE BEDS.
  
 21. SECTION C-C
 A. LABEL R/W AS S. DIXIE HWY.
 B. SHOW SHALLOW SWALE BETWEEN PROPERTY LINE AND
 BUILDING THAT WILL DIRECT SURFACE RUNOFF TO STRUCTURES
 DS-5 AND DS-6.
 C. SHOW SWALE SECTION IN THE LANDSCAPE BED TO COLLECT
 AND STORE STORMWATER RUNOFF.
  
 22. EXFILTRATION TRENCH IS NOT LABELED BETWEEN
 STRUCTURES DS-5 AND DS-6. EXPLAIN HOW THIS TRENCH WILL
 BE SURCHARGED.
  
 23. CONFIRM PIPE AND EXFILTRATION TRENCH LENGTHS
 BETWEEN STRUCTURES DS-01 AND DS-02 AND BETWEEN DS-02
 AND DS-03.
  
 24. SHOW WHERE ROOF DRAINS WILL CONNECT TO THE DRAINAGE
 SYSTEM.
  
 25. THE TWO PAVER AREAS ALONG THE EAST PROPERTY LINE -
 WHERE/HOW DO THEY DRAIN? THEY CANNOT FLOW TO THE EAST
 PROPERTY LINE TOWARD THE ADJACENT PROPERTY.
  
 THESE CONDITIONS FOR SITE PLAN APPROVAL WERE ADDED
 10/4/22 WHEN THE PASSED STATUS WAS MADE:
  
 - SHOW THE LANDSCAPE AREA ALONG THE WEST PROPERTY AS
 HAVING A DEPRESSED AREA FOR STORING STORMWATER RUNOFF
 TO REDUCE THE AMOUNT OF RUNOFF FLOWING TO THE STREET.
 [COMMENT #3]
  
 - FINISHED FLOOR ELEVATIONS SHALL BE LISTED ON THE
 CIVIL DRAWINGS. [COMMENT #7]
  
 - INCLUDE A DETAIL OF THE EXFILTRATION TRENCH. LABEL
 THE WIDTH, AND ELEVATIONS OF THE TOP AND BOTTOM OF THE
 TRENCH. [COMMENT #8]
  
 - PROVIDE A DETAIL OF THE CONTROL STRUCTURE. [COMMENT
 #9]
  
 - ADDITIONAL EXISTING DROP CURBS AND TRANSITIONS SHALL
 BE REPLACED WITH FDOT TYPE F CURB AND GUTTER FOR 3
 SECTIONS ON S. DIXIE HIGHWAY AND ONE SECTION ON
 OKEECHOBEE BLVD. LABEL ALL NEW CURBING ON THE PAVING,
 GRADING AND DRAINAGE PLANS.[COMMENT #12]
  
 - USE DIFFERENT SYMBOLS FOR EXISTING AND PROPOSED SPOT
 ELEVATIONS AND INCLUDE THE SYMBOLS IN THE SHEET LEGEND.
 [COMMENT #13]
  
 - ON THE TYPICAL CROSS SECTIONS, SHOW SWALE SECTIONS
 FOR STORING STORMWATER RUNOFF IN THE LANDSCAPE BED
 AREAS. [COMMENTS #19 AND #20]
  
 - LABEL S. DIXIE R/W ON SECTION C-C. SHOW SHALLOW SWALE
 BETWEEN THE PROPERTY LINE AND BUILDING THAT WILL DIRECT
 FLOW TO STRUCTURES DS-5 AND DS-6. [COMMENT #21]
  
 - LABEL ALL OF THE EXFILTRATION TRENCHES AND THEIR
 LENGTHS AND ENSURE THE DESIGN INDICATES HOW THE
 TRENCHES WILL BE SURCHARGED TO FUNCTION. [COMMENTS #22
 AND #23]
  
 - SHOW WHERE THE ROOF DRAINS WILL BE CONNECTED TO THE
 ONSITE DRAINAGE SYSTEM. [COMMENT #24]
  
 - THE TWO PAVER AREAS ALONG THE EAST PROPERTY LINE
 CANNOT DRAIN ONTO THE ADJACENT PROPERTY. [COMMENT #25]
  
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved