2022-07-21 16:52:42THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 7/5/2022 SUBMITTAL:
  
 1. [SATISFIED] THE CITY'S OFFICIAL VERTICAL DATUM IS
 NGVD1929. THE CITY HAS ALLOWED THE USE OF NAVD1988 AS
 LONG AS THE CONVERSION EQUATION TO NGVD1929 AT THE
 PROJECT LOCATION IS PROVIDED. PROVIDE VERTICAL DATUM
 REFERENCE AND CONVERSION TO NGVD1929 ON EVERY SHEET
 WITH ELEVATION INFORMATION.
  
 2. [SATISFIED] PROVIDE TRENCH DRAIN ACROSS SOUTH
 DRIVEWAY TO INTERCEPT RUNOFF BEFORE CROSSING THE
 SIDEWALK.
  
 3. [PARTIALLY SATISFIED] PROVIDE A TRENCH DRAIN ALONG
 THE WEST PROPERTY LINE TO INTERCEPT RUNOFF. ADDITIONAL
 COMMENTS: LANDSCAPE AREA SHOULD BE GRADED TO STORE
 RUNOFF (SWALE SECTION). PUBLIC OPEN SPACE AND SIDEWALK
 SHOULD BE GRADED TO DRAIN TO DS-04 AND DS-05. DS-04
 SHOULD BE IN A DEPRESSION TO COLLECT THE RUNOFF FROM
 THE OPEN SPACE AREA.
  
 4. [SATISFIED] FDOT MAINTAINS THE RIGHT OF WAY FOR
 OKEECHOBEE BLVD., LAKEVIEW AVE. AND S. DIXIE HWY.
  
 5. [NOT SATISFIED] PROVIDE CROSS SECTIONS FROM
 CENTERLINE OF RIGHTS OF WAY TO FACE OF BUILDING. SHOW
 BREAK POINTS, DISTANCES FROM BACK OF CURB TO PROPERTY
 LINE, FROM PROPERTY LINE TO FACE OF BUILDING, WIDTH OF
 SIDEWALK, CURB, ETC. LABEL THE RIGHT OF WAY (OKEECHOBEE
 BLVD, LAKEVIEW AVE, S. DIXIE HWY). ADDITIONAL COMMENTS:
 THE CROSS SECTIONS WILL SHOW HOW THE SIDEWALK AREAS AND
 DRIVEWAY APRONS WILL BE GRADED TO MEET A.D.A. CRITERIA.
 THE CONTOURING ON THE PAVING AND GRADING PLAN APPEAR TO
 RESULT IN SIDEWALK CROSS SLOPES STEEPER THAN 2%.
  
 6. [PARTIALLY SATISFIED] PROVIDE EXISTING SPOT GRADES
 ALONG EDGES OF PAVEMENT. ADDITIONAL COMMENT: WHERE DID
 THE EXISTING SPOT GRADES COME FROM? THEY DO NOT APPEAR
 ON THE SURVEY.
  
 7. [PARTIALLY SATISFIED] PROVIDE PROPOSED FINISHED
 FLOOR ELEVATION. ADDITIONAL COMMENT ? PROVIDE THE FFE'S
 ON THE CIVIL PLANS.
  
 8. [PARTIALLY SATISFIED] PROVIDE A DETAIL FOR THE
 EXFILTRATION TRENCH. LABEL THE WIDTH AND ELEVATIONS OF
 THE TOP AND BOTTOM OF THE TRENCH. ADDITIONAL COMMENT:
 REQUESTED INFORMATION CAN BE PROVIDED WITH THE
 ENGINEERING PERMIT SUBMITTAL.
  
 9. [NOT SATISFIED] PROVIDE A DETAIL FOR THE CONTROL
 STRUCTURE. THE CITY DOES NOT ALLOW THE USE OF BLEEDERS
 WITH EXFILTRATION TRENCH SYSTEMS. ADDITIONAL COMMENT:
 CONTROL STRUCTURE DETAIL CAN BE PROVIDED WITH THE
 ENGINEERING PERMIT SUBMITTAL.
  
 10. [PARTIALLY SATISFIED] MINIMUM DIAMETER OF STORM
 PIPE TO BE INSTALLED IN THE RIGHT OF WAY IS 15 INCH
 RCP. ADDITIONAL COMMENT: PVC PIPE FROM DS-04 SHOULD BE
 RCP.
  
 NEW COMMENTS:
  
 11. CONTOURING OF SIDEWALK APPEARS TO RESULT IN CROSS
 SLOPES STEEPER THAN 2%.
  
 12. REPLACE ALL DROP CURB OF EXISTING DRIVEWAYS WITH
 TYPE F CURB AND GUTTER.
  
 13. INCLUDE IN THE LEGEND OF THE PAVING AND GRADING
 PLAN THE SPOT GRADE SYMBOLS AND CONTOUR LINE SYMBOL.
 USE A DIFFERENT SYMBOL FOR EXISTING SPOT GRADES.
  
 14. SHOW AND LABEL THE DRAINAGE CONTROL STRUCTURE.
  
 15. INDICATE HOW WATER QUALITY TREATMENT WILL BE
 PROVIDED FOR THE RUNOFF FROM THE NORTHWEST CORNER OF
 THE SITE (DRAINING TO DS-04 AND DS-05.
  
 16. ENSURE THERE IS ADEQUATE VERTICAL CLEARANCE WITHIN
 THE BUILDING TO BE ABLE TO SERVICE THE EXFILTRATION
 TRENCHES AND DRAINAGE STRUCTURES AND TO BE ABLE TO
 REPLACE THE EXFILTRATION TRENCHES WHEN THEY ARE NO
 LONGER FUNCTIONING AS INTENDED.
  
 17. CONSIDER INCORPORATING LOW IMPACT DEVELOPMENT
 DRAINAGE SYSTEMS IN LIEU OR IN ADDITION TO THE
 EXFILTRATION TRENCHES.
  
 18. REFERENCE FDOT STANDARD PLAN NUMBERS INSTEAD OF
 FDOT STANDARD INDEX NUMBERS.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved