| Plan Review Notes For Project Z22050021 |
| Project Number |
Z22050021 |
|
| Review Stop |
AIPP |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2022-07-08 10:48:27 | 1. THE ART PROVIDED WITHIN THE FOOTPRINT OF THE | | | BUILDING DOES NOT MEET THE LOCATION REQUIREMENT OF THE | | | PUBLIC ART ORDINANCE. | | | 2. RENDERINGS SHOW AN ART FEATURE ON THE CORNER OF | | | DIXIE AND LAKEVIEW; HOWEVER, THIS IS NOT CONSISTENT | | | WITH THE SITE PLAN THAT DEMONSTRATES A PLANTER. | | | 3. IF OPTION 1 ART ON SITE IS BEING CONSIDERED, THEN | | | THE PLACEMENT OF THE ART MUST MEET THE LOCATION | | | REQUIREMENT FURTHER, RENDERING AND SITE PLAN MUST BE | | | CONSISTENT. | | | 4. THE DECORATIVE GOLD LEAF ON THE WALL AT THE CORNER | | | OF LAKEVIEW AND DIXIE NEEDS TO BE IDENTIFIED AS IT | | | APPEARS TO BE A DECORATIVE PIECE AND IN ITS CURRENT | | | ITERATION NOT MEET THE PUBLIC ART REQUIREMENT. | | | 5. IF THE ART CANNOT BE ACCOMMODATED TO MEET THE PUBLIC | | | ART CRITERIA AND REQUIREMENTS SET FORTH IN THE | | | ORDINANCE THE DEVELOPER HAS THE OPTION TO CONTRIBUTE TO | | | THE PUBLIC ART ACCOUNT AT .75% (-25%) OF THE 1% TOTAL | | | CONSTRUCTION COSTS. | | | 6. CONTACT SYBILLE WELTER [email protected] FOR AN ART | | | ASSESSMENT APPLICATION, WHICH NEEDS TO BE PROVIDED TO | | | COMPLETE SITE APPROVAL PROCESS. | | | 7. AT THE TIME OF BUILDING PERMIT FEES, THE EVIDENCE OF | | | ESCROW IF CHOOSEN OPTION 1 OR THE CONTRIBUTION INTO THE | | | PUBLIC ART FUND MUST BE COMPLETED. | | | | | | |
| |
Print |
|