Plan Review Notes
Plan Review Notes For Project Z22050021
Project Number Z22050021
Review Stop STORM
Sequence Number 1
Notes
Date Text
2022-06-06 13:11:32THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. THE CITY?S OFFICIAL VERTICAL DATUM IS NGVD1929. THE
 CITY HAS ALLOWED THE USE OF NAVD1988 AS LONG AS THE
 CONVERSION EQUATION TO NGVD1929 AT THE PROJECT LOCATION
 IS PROVIDED. PROVIDE VERTICAL DATUM REFERENCE AND
 CONVERSION TO NGVD1929 ON EVERY SHEET WITH ELEVATION
 INFORMATION.
  
 2. PROVIDE TRENCH DRAIN ACROSS SOUTH DRIVEWAY TO
 INTERCEPT RUNOFF BEFORE CROSSING THE SIDEWALK.
  
 3. PROVIDE A TRENCH DRAIN ALONG THE WEST PROPERTY LINE
 TO INTERCEPT RUNOFF.
  
 4. FDOT MAINTAINS THE RIGHT OF WAY FOR OKEECHOBEE
 BLVD., LAKEVIEW AVE. AND S. DIXIE HWY.
  
 5. PROVIDE CROSS SECTIONS FROM CENTERLINE OF RIGHTS OF
 WAY TO FACE OF BUILDING. SHOW BREAK POINTS, DISTANCES
 FROM BACK OF CURB TO PROPERTY LINE, FROM PROPERTY LINE
 TO FACE OF BUILDING, WIDTH OF SIDEWALK, CURB, ETC.
 LABEL THE RIGHT OF WAY (OKEECHOBEE BLVD, LAKEVIEW AVE,
 S. DIXIE HWY).
  
 6. PROVIDE EXISTING SPOT GRADES ALONG EDGES OF
 PAVEMENT.
  
 7. PROVIDE PROPOSED FINISHED FLOOR ELEVATION.
  
 8. PROVIDE A DETAIL FOR THE EXFILTRATION TRENCH. LABEL
 THE WIDTH AND ELEVATIONS OF THE TOP AND BOTTOM OF THE
 TRENCH.
  
 9. PROVIDE A DETAIL FOR THE CONTROL STRUCTURE. THE CITY
 DOES NOT ALLOW THE USE OF BLEEDERS WITH EXFILTRATION
 TRENCH SYSTEMS.
  
 10. MINIMUM DIAMETER OF STORM PIPE TO BE INSTALLED IN
 THE RIGHT OF WAY IS 15? RCP.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP
 CRITERIA. STORMWATER CALCULATIONS WILL BE REVIEWED WITH
 THE ENGINEERING PERMIT SUBMITTAL.
  
 2. PROVIDE COPY OF SFWMD ERP PERMIT MODIFICATION BEFORE
 START OF CONSTRUCTION.
  
 3. PROVIDE EROSION AND SEDIMENT CONTROL PLAN WITH THE
 ENGINEERING PERMIT SUBMITTAL.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved