| 2022-08-02 10:31:06 | 1) SATISFIED. GIVEN THE CHANGE TO ROADWAY GEOMETRY, USE |
| | TYPE FOR SOME OF THE PROPOSED FACILITIES, AND |
| | CORRESPONDING TRIP GENERATION, PROVIDE A REVISED |
| | TRAFFIC STUDY |
| | 2) PARTIALLY SATISFIED. PROVIDE COUNTY TPS LETTER. PALM |
| | BEACH COUNTY NEEDS TO UPDATE THE GIS DATABASE PER THE |
| | CHANGE IN TRIP GENERATION, INDEPENDENTLY IF THERE IS AN |
| | INCREASE OR DECREASE. EITHER OBTAIN A NEW TPS LETTER OR |
| | PROVIDE PROOF OF COMMUNICATION AND ACKNOWLEDGEMENT FROM |
| | THE COUNTY. |
| | 3) SATISFIED. PROVIDE FDOT ACCESS LETTER |
| | 4) SATISFIED. PROVIDE WIDTH OF EACH DRIVEWAY AT THE |
| | SIDEWALK INTERFACE. |
| | 5) PARTIALLY SATISFIED. PROVIDE PAVEMENT MARKINGS |
| | AND/OR EXPLAIN OPERATIONS AT THE MODIFIED HOTEL |
| | DROP-OFF. INTEGRATE PAVEMENT MARKINGS INFORMATION IN |
| | THE TRANSPORTATION SPECIFIC SITE PLAN |
| | 6) SATISFIED. EXPLAIN THE USE FOR THE PROPOSED NEW |
| | DRIVING AREA BY THE QUADRILLE DRIVEWAY |
| | 7) NOT SATISFIED. PROVIDE A SEPARATE SITE PLAN |
| | SHOWCASING BASIC TRANSPORTATION FEATURES AND THEIR |
| | DIMENSIONS, SUCH AS: SIDEWALK, CURB, PARKING STALLS, |
| | CROSSINGS, WALKWAY, ROADWAY, DRIVE ISLES, DRIVEWAYS, |
| | PAVEMENT MARKINGS, SIGNAGE, ETC. PROVIDE A |
| | TRANSPORTATION SPECIFIC SITE PLAN FOR THE GROUND FLOOR, |
| | SHEET A1.01 IS A GREAT STARTING POINT. PLEASE NAME IT |
| | T1.01 |
| | 8) SATISFIED. PROVIDE A MID-BLOCK PEDESTRIAN CROSSING |
| | ON 5TH ST. SPECIFICALLY AT THE WEST END OF THE NORTHERN |
| | SIDEWALK |
| | 9) PARTIALLY SATISFIED. PROVIDE NARRATIVE PERTAINING |
| | THE MODIFICATIONS TO THE SOUTHERN PICK-UP/DROP-OFF |
| | AREA. AS THE PROPOSED DESIGN MAY HAVE SAFETY AND |
| | OPERATIONAL ISSUES. THE LATEST NARRATIVE IS NOT |
| | SUFFICIENT, PLEASE PROVIDE AN UPDATED PARKING |
| | MANAGEMENT PLAN PER COMMENT #14 |
| | 10) PER FDOT LETTER, THE QUADRILLE BLVD DRIVEWAY IS |
| | LEFT-IN, RIGHT-IN AND RIGHT-OUT ONLY. REVISE PAVEMENT |
| | MARKING(S) AND INSTALL CORRESPONDING SIGNAGE FOR THE |
| | EXIT MOVEMENT |
| | 11) PER FDOT LETTER, SHOW THE 50 FEET MINIMUM DISTANCE |
| | FROM THE ULTIMATE RIGHT-OF-WAY LINE TO THE FIRST |
| | CONFLICT POINT AT THE QUADRILLE DRIVEWAY |
| | 12) INSTALL RIGHT-TURN ONLY PAVEMENT MARKING(S) ALONG |
| | THE DECELERATION LANE TO THE QUADRILLE DRIVEWAY |
| | 13) PEDESTRIAN CROSSWALK MARKINGS ACROSS THE QUADRILLE |
| | DRIVEWAY NEED TO BE PROPERLY ALIGNED, PLEASE CORRECT |
| | 14) DUE TO THE SIGNIFICANT CHANGES IN USE TYPE, VALET |
| | PODIUM LOCATIONS, TRIP GENERATION AND CIRCULATION, |
| | PLEASE PROVIDE AN UPDATED PARKING MANAGEMENT PLAN |
| | 15) IN THE UPDATED PARKING MANAGEMENT PLAN, PLEASE |
| | PROVIDE A DETAILED BREAKDOWN OF THE ASSUMED PROCESSING |
| | TIME IN THE QUEUE ANALYSIS (I.E. TIMINGS FOR VALET |
| | CHECK-IN/CHECK-OUT, VALET DRIVE/WALK TO/FROM THE |
| | GARAGE) |
| | 16) SEVERAL DIMENSIONS OF THE VALET AREA ON 4TH ST ARE |
| | MISSING AS SHOWN IN A1.01. MOREOVER, THE FACILITY DOES |
| | NOT SEEM COMPLIANT WITH SEC 94-109 FIGURE IV-22. PLEASE |
| | PROVIDE DIMENSIONS AND REQUEST VARIANCE(S), IF ANY. |
| | 17) GENERAL COMMENT: FOR ANY FEATURE OR SITE PLAN |
| | REFERENCE(S) IN EACH OF THE RESPONSE(S), THE SPECIFIC |
| | SHEET NAME AND NUMBER MUST BE PROVIDED. "REFER TO CIVIL |
| | DRAWINGS" IS NOT AN ACCEPTABLE RESPONSE |
| | |
| | VALERIO ORICCHIO |
| | CITY TRANSPORTATION ENGINEER |
| | 561-494-1092 |