Plan Review Notes
Plan Review Notes For Project Z22040056
Project Number Z22040056
Review Stop STORM
Sequence Number 1
Notes
Date Text
2022-05-12 13:12:32THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. BACKGROUND ON ENGINEERING PLANS DOES NOT ENTIRELY
 MATCH THE SITE PLAN.
  
 2. ON SECTION A-A, PROVIDE HORIZONTAL DIMENSION FOR THE
 PLANTER AREA.
  
 3. PROVIDE A TABLE SUMMARIZING THE CHANGE IN
 PERVIOUS/IMPERVIOUS AREA AND RUNOFF VOLUMES/PEAK
 STAGES.
  
 4. QUADRILLE BLVD IS MAINTAINED BY FDOT. ANY
 IMPROVEMENTS WITHIN THE RIGHT OF WAY ARE TO BE APPROVED
 BY FDOT.
  
 5. CLOUD THE PROPOSED CHANGES FROM THE APPROVED
 ENGINEERING PERMIT PLANS.
  
 6. INCLUDE RPMS ON THE SIGNING AND MARKING PLAN.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP
 CRITERIA. STORMWATER CALCULATIONS WILL BE REVIEWED WITH
 THE ENGINEERING PERMIT SUBMITTAL.
  
 2. PROVIDE COPY OF SFWMD ERP PERMIT MODIFICATION, IF
 APPLICABLE.
  
 3. PROVIDE EROSION CONTROL PLAN WITH THE ENGINEERING
 PERMIT SUBMITTAL.
  
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  