| Plan Review Notes For Project Z22040026 |
| Project Number |
Z22040026 |
|
| Review Stop |
PW |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2022-05-02 12:51:05 | | | | | | | PLEASE PROVIDE THE FOLLOWINGS: | | | 1- LOS (LEVEL OF SERVICE ANALYSIS) TO REFLECT THE SOLID | | | WASTE VOLUME PRODUCED ALONG WITH THE SIZE, TYPE AND | | | QUANTITY OF THE CONTAINER THAT WILL BE UTILIZED FOR THE | | | SANITATION SERVICE. | | | 2- DUMPSTER ENCLOSURE DETAIL. DETAILS FOR SANITATION | | | SERVICE (I.E. SOLID WASTE CONTAINER(S) TYPE, COLLECTION | | | LOCATION, ETC.). FOR A FREESTANDING SITE DUMPSTER | | | ENCLOSURE, THE ENCLOSURE SHALL COMPLY WITH THE LATEST | | | REVISION OF CITY OF WEST PALM BEACH GENERAL | | | CONSTRUCTION-GARBAGE ENCLOSURE STANDARD, GC-7. (LINK TO | | | THE LATEST REVISION OF THE GC-7 DOCUMENT: HTTPS://WWW.W | | | PB.ORG/HOME/SHOWPUBLISHEDDOCUMENT/3690/6376290604221000 | | | 00) | | | 3- AUTOTURN EXHIBIT (DYNAMIC ENVELOPE AND THE VEHICLE?S | | | WHEEL PATH) FOR THE SANITATION SERVICE, FRONT LOADER | | | TRUCK WITH THE FOLLOWING SPECS: | | | - DUAL AXLES | | | - TRUCK LENGTH: 35 FT | | | - TRUCK WIDTH: 11 FT | | | - TURNING RADIUS: | | | - SAE TURNING RADIUS: 32.5 FT | | | - CURB-TO-CURB DIAMETER: 74 FT | | | - WALL-TO-WALL DIAMETER: 86.3 FT | | | | | | 4- PLEASE ALSO MODIFY THE LOCATION/ORIENTATION OF THE | | | PROPOSED ENCLOSURE TO ALLOW OUR SANITATION FRONT LOAD | | | COLLECTION VEHICLE SAFELY ACCESS AND SERVICE THE | | | CONTAINER(S) WHILE MINIMIZING/AVOIDING ANY BACK UP | | | MOVEMENTS AND SHORT RADIUS TURNS. | | | | | | MATT HEJAZI | | | DEPT. OF PUBLIC WORKS | | | [email protected] | | | 561-822-2045 | | | |
| |
Print |
|