2023-06-27 13:29:16THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 5/9/2023 SUBMITTAL.
  
 1. [PARTIALLY SATISFIED - ADD THE CONVERSION EQUATION
 TO NGVD1929 TO THE ENGINEERING PLANS] THE CITY'S
 OFFICIAL VERTICAL DATUM IS NGVD1929. THE CITY HAS
 ALLOWED THE USE OF NAVD1988 AS LONG AS THE CONVERSION
 EQUATION TO NGVD1929 AT THE PROJECT LOCATION IS
 PROVIDED. PROVIDE VERTICAL DATUM REFERENCE AND
 CONVERSION TO NGVD1929 ON THE ENGINEERING PLANS.
  
 2. [SATISFIED - THE PARKING SPACES DO NOT APPEAR TO BE
 REDUCED IN LENGTH TO REDUCE THE AMOUNT OF IMPERVIOUS
 AREA] CONSIDER REDUCING THE PARKING SPACES AND PROVIDE
 TWO FEET OF LANDSCAPED OVERHANG.
  
 3. [NOT SATISFIED - PROVIDE A COPY OF THE DRAINAGE
 EASEMENT] PROVIDE DOCUMENTATION OF PERMISSIBLE
 CONNECTION OF THE DRAINAGE SYSTEM TO ADJACENT
 PROPERTY'S DRAINAGE SYSTEM.
  
 4. [SATISFIED] OKEECHOBEE BLVD IS MAINTAINED BY FDOT.
 ANY WORK WITHIN THE RIGHT OF WAY MAY REQUIRE A PERMIT
 FROM FDOT.
  
 5. [PARTIALLY SATISFIED - PROPOSED STORM ON THE WEST
 SIDE OF SITE IS NOT SHOWN.] SHOW EXISTING AND PROPOSED
 UTILITIES ON THE LANDSCAPE PLANS.
  
 6. [NOT SATISFIED] ON SECTION A-A, PROVIDE WIDTH OF
 PAVEMENT (OR RANGE OF WIDTH IF IT VARIES) FROM FACE OF
 CURB TO FACE OF CURB. PROVIDE SWALE ALONG WEST PROPERTY
 LINE TO PREVENT DIRECT RUNOFF ONTO THE ADJACENT
 PROPERTY.
  
 7. [PARTIALLY SATISFIED] SECTION B-B, PROVIDE SWALE TO
 PREVENT DIRECT RUNOFF ONTO THE ADJACENT SITE OR SHOW
 4:1 SLOPE FROM BACK OF CURB TO EXISTING GRADE TO ALLOW
 RUNOFF FROM THE ADJACENT SITE TO CONTINUE TO FLOW ONTO
 THE SITE. PROPOSED IMPROVEMENTS TO THE SITE SHALL NOT
 CAUSE NEW PONDING TO OCCUR ON ADJACENT SITES.
  
 8. [NOT SATISFIED] CONNECT ROOF DRAINS DIRECTLY TO
 DRAINAGE STRUCTURES INSTEAD OF DISCHARGING ONTO THE
 GROUND SURFACE.
  
 NEW COMMENTS (5/9/2023 SUBMITTAL):
  
 9. PROVIDE WRITTEN COMMENTS DESCRIBING HOW EACH OF
 THESE COMMENTS ARE ADDRESSED.
  
 10. CONFIRM INSTALLATION OF PROPOSED EXFILTRATION
 TRENCH SLONG THE WEST PROPERTLY LINE WILL DAMAGE THE
 ROOT SYSTEM OF THE EXISTING TREES.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved