Plan Review Notes
Plan Review Notes For Project Z22040017
Project Number Z22040017
Review Stop STORM
Sequence Number 1
Notes
Date Text
2022-05-12 13:00:22THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. THE CITY?S OFFICIAL VERTICAL DATUM IS NGVD1929. THE
 CITY HAS ALLOWED THE USE OF NAVD1988 AS LONG AS THE
 CONVERSION EQUATION TO NGVD1929 AT THE PROJECT LOCATION
 IS PROVIDED. PROVIDE VERTICAL DATUM REFERENCE AND
 CONVERSION TO NGVD1929 ON THE ENGINEERING PLANS.
  
 2. CONSIDER REDUCING THE PARKING SPACES AND PROVIDE TWO
 FEET OF LANDSCAPED OVERHANG.
  
 3. PROVIDE DOCUMENTATION OF PERMISSIBLE CONNECTION OF
 THE DRAINAGE SYSTEM TO ADJACENT PROPERTY?S DRAINAGE
 SYSTEM.
  
 4. OKEECHOBEE BLVD IS MAINTAINED BY FDOT. ANY WORK
 WITHIN THE RIGHT OF WAY MAY REQUIRE A PERMIT FROM FDOT.
  
 5. SHOW EXISTING AND PROPOSED UTILITIES ON THE
 LANDSCAPE PLANS.
  
 6. ON SECTION A-A, PROVIDE WIDTH OF PAVEMENT (OR RANGE
 OF WIDTH IF IT VARIES) FROM FACE OF CURB TO FACE OF
 CURB. PROVIDE SWALE ALONG WEST PROPERTY LINE TO PREVENT
 DIRECT RUNOFF ONTO THE ADJACENT PROPERTY.
  
 7. SECTION B-B, PROVIDE SWALE TO PREVENT DIRECT RUNOFF
 ONTO THE ADJACENT SITE OR SHOW 4:1 SLOPE FROM BACK OF
 CURB TO EXISTING GRADE TO ALLOW RUNOFF FROM THE
 ADJACENT SITE TO CONTINUE TO FLOW ONTO THE SITE.
 PROPOSED IMPROVEMENTS TO THE SITE SHALL NOT CAUSE NEW
 PONDING TO OCCUR ON ADJACENT SITES.
  
 8. CONNECT ROOF DRAINS DIRECTLY TO DRAINAGE STRUCTURES
 INSTEAD OF DISCHARGING ONTO THE GROUND SURFACE.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP
 CRITERIA. STORMWATER CALCULATIONS WILL BE REVIEWED WITH
 THE ENGINEERING PERMIT SUBMITTAL.
  
 2. PROVIDE COPY OF SFWMD ERP PERMIT BEFORE START OF
 CONSTRUCTION.
  
 3. PROVIDE EROSION CONTROL PLAN WITH THE ENGINEERING
 PERMIT SUBMITTAL.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved