Plan Review Notes
Plan Review Notes For Project Z22040014
Project Number Z22040014
Review Stop STORM
Sequence Number 4
Notes
Date Text
2022-09-02 18:18:34THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 8/30/2022 SUBMITTAL:
  
 1. [SATISFIED] DRAINAGE STRUCTURES, EXFILTRATION
 TRENCHES, ETC. ARE NOT TO CROSS THE PROPERTY LINE.
  
 2. [SATISFIED] THE CITY DOES NOT ALLOW THE USE OF
 BLEEDERS WITH EXFILTRATION TRENCH SYSTEMS.
  
 3. [PARTIALLY SATISFIED ? SEE COMMENT #15 BELOW]
 VERTICAL DATUM REFERENCE (NAVD OR NGVD) NOT CONSISTENT
 ON THE ENGINEERING PLANS. PLEASE PROVIDE CONVERSION
 EQUATION BETWEEN THE VERTICAL DATUM USED ON THE PLANS
 (NGVD1929) TO NAVD1988.
  
 4. [SATISFIED] REVIEW BANYAN BLVD AS-BUILT DRAWINGS (OR
 DESIGN DRAWINGS) FOR STORM PIPE CONNECTIVITY. SHOW
 CURRENT LAYOUT OF BANYAN BLVD.
  
 5. [SATISFIED] PROVIDE FLOW ARROWS SHOWING DIRECTION OF
 SURFACE RUNOFF.
  
 6. [PARTIALLY SATISFIED ? SEE ADDITIONAL COMMENTS
 BELOW] PROVIDE CROSS SECTIONS FOR THE DRIVEWAYS (EXTEND
 TO HIGH POINT) AND ON-STREET PARKING AREAS SHOWING HOW
 PAVEMENT WITH SLOPE. PROVIDE DIMENSIONS FROM EDGE OF
 TRAVEL LANE TO ALL CURBING, BREAK POINTS AND RIGHT OF
 WAY LINE.
  
 7. [SATISFIED] PROVIDE CROSS SECTIONS AT EACH PROPERTY
 LINE FROM CENTERLINE OF ROAD TO FACE OF BUILDING.
 PROVIDE DIMENSIONS TO SURFACE FEATURES AND BREAK POINTS
 IN SURFACE SLOPES. LABEL THE RIGHT OF WAY WITH THE
 STREET NAME.
  
 8. [PARTIALLY SATISFIED ? IT?S REVIEWER?S OPINION THERE
 IS NOT AN EXISTING PIPE BETWEEN THE EXISTING CATCH
 BASINS AT THE NORTH END OF CLEARWATER] DEMO. PLANS DO
 NOT INDICATE WHETHER DRAINAGE SYSTEM ON CLEARWATER
 DEMOLITION PLAN INDICATES THE CURB INLETS ON CLEARWATER
 DRIVE ARE TO REMAIN BUT THE PGD PLAN CALLS FOR THEM TO
 BE REMOVED. EXISTING STRUCTURES SHOULD NOT REMAIN IF
 THE EXISTING PIPE CAN BE EXTENDED TO THE NEW
 STRUCTURES.
  
 9. [SATISFIED] BUILDINGS OVER EXFILTRATION TRENCHES
 SHOULD HAVE SUFFICIENT VERTICAL CLEARANCE BELOW THE
 BUILDING FOR MAINTENANCE EQUIPMENT FOR THE EXFILTRATION
 TRENCH AND FOR REPLACING THE EXFILTRATION TRENCH IN THE
 FUTURE WHEN IT NO LONGER IS FUNCTIONING AS INTENDED.
  
 10. [SATISFIED] STREETS SHALL BE PROPERLY SHOWN ON THE
 PLAN VIEWS.
  
 11. [SATISFIED] PROVIDE WRITTEN RESPONSE TO THESE
 COMMENTS.
  
 12. [SATISFIED] PROVIDE EXFILTRATION TRENCH DETAIL.
  
 13. [SATISFIED] PROVIDE CONTROL STRUCTURE DETAIL.
  
 14. [SATISFIED] IT APPEARS A COLUMN IS PROPOSED OVER
 EXISTING STORM PIPE APPROXIMATELY 33 FEET NORTH OF
 MATCHLINE C-07 AND 16 FEET WEST OF THE EAST PROPERTY
 LINE ON SHEET C-06.
  
 15. [PARTIALLY SATISFIED ? SEE COMMENTS FOR COVER, C-01
 AND C-02] SHEETS COVER, C-12 AND C-13 INDICATE THE
 VERTICAL DATUM REFERENCE IS NAVD1988. SHEETS C-06
 THROUGH C-09 INDICATE THE VERTICAL DATUM REFERENCE IS
 NGVD1929. SHEETS C-01 AND C-02 NEED TO LIST THE
 VERTTICAL DATUM REFERENCE AND CONVERSION EQUATION. THE
 COVER NEEDS THE CONVERSION EQUATION.
  
 16. [SATISFIED] WATER QUALITY TREATMENT AND PEAK FLOW
 ATTENUATION WILL BE NEEDED FOR THE ADDITIONAL
 IMPERVIOUS AREA IN THE RIGHT OF WAY.
  
 17. [SATISFIED] SEPARATE PLAN AND PROFILE SHEETS FOR
 CLEARWATER DRIVE WILL BE NEEDED FOR THE ENGINEERING
 PERMIT SUBMITTAL. A BASELINE ON CLEARWATER DRIVE WILL
 NEED TO BE ESTABLISHED FOR THE ENGINEERING PERMIT
 SUBMITTAL.
  
 NEW COMMENTS (8/30/22 CIVIL SUBMITTAL)
  
 18. NUMBER THE EXISTING AND PROPOSED STRUCTURES FOR
 EASE OF REFERENCE.
  
 19. AVOID LOCATING MANHOLE COVERS WITHIN SIDEWALKS.
  
 20. LEADER ARROW FOR LABEL PROPOSED STORM MH (TYP)
 (SHEET C-07 NORTH OF THE MIDDLE DRIVEWAY) NEEDS
 ADJUSTING.
  
 21. PROVIDE FLOW ARROW FOR ON-STREET KISS AND RIDE AREA
 ON SHEET C-07. ADJUST DIMENSION OF THE AREA ON SHEET
 C-04.
  
 22. CONCRETE APRONS WITHIN THE RIGHT OF WAY.
  
 23. WHY IS SIDEWALK WIDER THAN THE CROSS WALKS ACROSS
 THE TWO SOUTHERN DRIVEWAYS?
  
 24. PROVIDE VALLEY GUTTER/DROP CURB ACROSS DRIVEWAYS.
  
 25. SECTION A-A ? PROVIDE DIMENSION FROM R/W TO THE
 VALLEY GUTTER OR PAVEMENT FLOW LINE.
  
 26. SECTION B-B ? PROVIDE DIMENSION FROM R/W TO HIGH
 POINT OF DRIVEWAY.
  
 27. SECTION D-D ? INCREASE THE 5% SLOPE TO REDUCE, TO
 THE MAXIMUM EXTENT POSSIBLE, THE AMOUNT OF DRIVEWAY
 AREA FLOWING TO THE RIGHT OF WAY.
  
 28. SECTION E-E ? FLIP SYMBOLS ON SHEET C-06 TO POINT
 TO THE EAST. CONFIRM MULTI-USE PATH EXTENDS OUTSIDE THE
 RIGHT OF WAY.
  
 29. SECTION F-F ? WHAT DOES THE 11.6 FT DIMENSION REFER
 TO? PROVIDE SOUTHBOUND PAVEMENT WIDTH.
  
 30. JUSTIFY THE SIZE OF THE OUTFALL PIPE DIAMETER
 BETWEEN THE CONTROL STRUCTURE AND THE DRAINAGE SYSTEM
 WITHIN THE RIGHT OF WAY. FLOW IS LIMITED TO THE 8? X 8?
 ORIFICE.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  