2022-08-19 16:37:28TRAFFIC STUDY COMMENTS
 1) SATISFIED. PROVIDE ORIGINAL TRAFFIC STUDY INCLUSIVE
 OF THE REFERENCED EXHIBIT D. PLEASE PROVIDE FILE NAME,
 AS IT WAS NOT FOUND IN THE LATEST SUBMISSION. NOTE: THE
 REVISION TO THE SUPPLEMENTAL MEMO DATED MAY 19, 2015 IS
 NOT VALID, AS IT PROVIDES A MERE RE-ALLOCATION OF
 TURNING VOLUMES FROM THE ORIGINAL ANALYSIS WITHOUT
 UPDATING THE ACTUAL NUMBER OF TRIPS GENERATED BY THE
 PROPOSED AND NEARBY EXISTING/FUTURE DEVELOPMENTS
 2) NOT SATISFIED. PROVIDE A REVISED TRAFFIC STUDY.
 ROADWAYS GEOMETRY AND NEARBY TRAFFIC CONDITIONS HAVE
 CHANGED SIGNIFICANTLY SINCE THE INITIAL SITE PLANS
 APPROVAL. REASONING PROVIDED FOR NOT CONDUCTING A NEW
 STUDY DO NOT SUBSIST; AS THERE IS NO FAILURE FROM THE
 CITY, NOR THE DEVELOPER. MOREOVER, VESTED TRIPS DO NOT
 HAVE ANY MEANING ON THIS REQUEST. THE SITE BEING WITHIN
 A TCEA DOES NOT PRECLUDE THE CITY TO REQUEST A REVISED
 STUDY OR FURTHER ANALYSIS IN THE CASE OF POTENTIAL
 SIGNIFICANT NEGATIVE IMPACTS TO THE EXISTING AND FUTURE
 TRANSPORTATION NETWORK. A METHODOLOGY MEETING WITH THE
 CITY IS STRONGLY RECOMMENDED
 3) NOT SATISFIED. DEPENDING ON THE OUTCOME OF THE
 TRAFFIC ANALYSIS, TDM MEASURES MAY NEED TO BE
 NEGOTIATED AND ESTABLISHED. THE FACT THAT THE PROJECT
 IS TRANSIT ORIENTED DOES NOT MEAN THAT IT IS PRECLUDED
 FROM IMPLEMENTING MITIGATION MEASUREMENTS. NEGATIVE
 IMPACTS FROM THE RESIDENTIAL AND/OR COMMERCIAL
 COMPONENTS OF THE PROPOSED DEVELOPMENT DO NOT GET A
 FREE PASS BY BEING PART OF A TRANSIT PROJECT. EVEN IF
 THE OVERALL NUMBER OF TRIPS GENERATED BY THE PROPOSED
 DEVELOPMENT ARE FEWER THAN THE ORIGINAL APPLICATION,
 THE ORIGINAL TRAFFIC COUNTS ARE SIGNIFICANTLY OUTDATED,
 AS THEY WERE PERFORMED MORE THAN 10 YEARS AGO.
 MOREOVER, THE SHIFT IN LAND USE BETWEEN COMMERCIAL AND
 RESIDENTIAL, THE CHANGE OF BOTH INTERNAL AND EXTERNAL
 ROAD GEOMETRIES, AND THE CHANGE OF EXISTING AND ASSUMED
 BACKGROUND VOLUMES COULD BRING A NEW SET OF SIGNIFICANT
 NEGATIVE IMPACTS, WHICH CANNOT BE IDENTIFIED NOR
 ADDRESSED TILL A REVISED TRAFFIC STUDY IS PROVIDED
 4) SATISFIED. PROVIDE COUNTY TPS LETTER
 5) SATISFIED. PROVIDE DETAILS PERTAINING THE TRANSITION
 FROM EXISTING TO FUTURE TRANSIT SERVICES, IN TERMS OF
 LOGISTICS AND OPERATIONS. COMMENT WILL BE SATISFIED
 ONCE DETAILS FROM PBC ARE PROVIDED.
  
 SITE PLAN COMMENTS
 6) NOT SATISFIED. PROVIDE A SEPARATE SITE PLAN
 SHOWCASING ONLY BASIC TRANSPORTATION FEATURES AND THEIR
 DIMENSIONS. SPECIFICALLY: SIDEWALK, CURB, PARKING
 STALLS, CROSSINGS, WALKWAY, ROADWAY, DRIVE ISLES,
 DRIVEWAYS, PAVEMENT MARKINGS, SIGNAGE. C-10 AND C-11
 ARE NOT PROPER, AS THEY ARE MISSING MOST OF THE
 DIMENSIONS AND MEASUREMENTS. PLEASE NAME THE
 TRANSPORTATION SITE PLANS T-01, T-02 AND HAVE THEM
 SEPARATE FROM ANY OTHER SET OF SITE PLANS (I.E. CIVIL,
 ARCHITECTURE, LANDSCAPE)
 7) PARTIALLY SATISFIED. ON THE SITE PLAN, PLEASE
 SHOWCASE BASIC CURB DETAILS (I.E. DRIVEWAY AND PARKING
 STALLS) ON THE OPPOSITE SIDE OF THE ROADS SURROUNDING
 THE PROPOSED DEVELOPMENT. PLEASE PROVIDE DOCUMENT NAME
 AND SHEET NUMBER SHOWCASING SUCH FEATURES. THE
 APPLICANT MUST PROVIDE THE REQUESTED
 TRANSPORTATION-SPECIFIC-PLANS SO THAT THE REVIEWER CAN
 PROPERLY ANALYZE THE TRAFFIC AND TRANSPORTATION
 COMPONENT OF THE PROPOSED DEVELOPMENT. THANK YOU.
 PLEASE APPLY SUCH CRITERIA TO THE T-SERIES
 TRANSPORTATION PLANS
 8) PARTIALLY SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR
 GARBAGE TRUCK AND/OR SERVICE VEHICLES DRIVING IN AND
 OUT OF THE PROPOSED DEVELOPMENT WITH VEHICLE DYNAMIC
 ENVELOPES CLEARLY DEFINED. ANALYSIS SHOULD BE PROVIDED
 IN A SEPARATE FILE/DRAWING. PLEASE PROVIDE DOCUMENT
 NAME AND SHEET NUMBER SHOWCASING THE ANALYSIS. LATEST
 RESPONSE DID NOT PROVIDE FILE NAME AND SHEET NUMBER,
 PLEASE BE SPECIFIC. LATEST ANALYSIS DOES NOT SHOW THE
 WHEEL PATHS AND THERE ARE INSTANCES OF PARTIAL
 ENCROACHMENTS. USE DIFFERENT COLORS FOR VEHICLE DYNAMIC
 ENVELOPE AND WHEEL PATHS. CITY CAN PROVIDE SAMPLES OF
 PROPER ANALYSIS IF NEEDED/REQUESTED
 9) SATISFIED. SEVERAL ADA PARKING STALLS IN THE GARAGE
 MUST BE RELOCATED TO THE NEAREST ACCESS TO RESIDENTIAL
 UNIT AND ELEVATORS, SPECIFICALLY: 10, 11, 33, 34, 63,
 64
 10) PARTIALLY SATISFIED. REDUCE GARAGE RAMPS TO ONE
 SINGLE LANE, INSTALL CHEVRON MARKINGS ON THE SIDE OF
 THE RAMP FOR SUCH REDUCTION. IF TWO LANES ARE KEPT, A
 CONTINUOUS DIVIDING ELEMENT MUST BE INSTALLED (I.E.
 RAISED CURB WITH FLEXIBLE POLES). PROVIDE A TRAFFIC OR
 QUEUING ANALYSIS TO PROVE THAT DOUBLE ENTRY LANES ARE
 NECESSARY TO AVOID VEHICULAR SPILLBACK INTO CLEARWATER.
 PROVIDE THE CODE REFERENCE REQUIRING ?AMPLE? STACKING
 OF EXISTING VEHICLES WITHIN THE SITE.
 11) SATISFIED. PLEASE PROVIDE A CONTACT PERSON THAT
 WOULD RECEIVE MARKED UP SITE PLANS. THERE ARE SEVERAL
 COMMENTS FOR THE PROPOSED DROP-OFF DESIGN THAT WOULD BE
 BETTER CONVENED WITH SITE PLAN MARK-UPS THAN COMMENTS
 HERE
 12) NOT SATISFIED. THE BANYAN STREETSCAPE IMPROVEMENTS
 PROJECT DOES NOT ALLOW LEFT TURNS FROM CLEARWATER TO
 BANYAN. PLEASE UPDATE THE SITE PLANS ACCORDINGLY. A
 LEFT-TURN APPROVAL DOES NOT MEAN THAT IT MUST BE
 IMPLEMENTED. THUS, IT IS RECOMMENDED TO REDUCE THE
 NORTHBOUND LANES TO A SINGLE ONE AT THE INTERSECTION OF
 CLEARWATER AND BANYAN. MOREOVER, IT IS SUGGESTED TO
 CONVERT THE CURRENT PROPOSED NORTHBOUND RIGHT-MOST LANE
 ON CLEARWATER DR TO A MERGE/ACCELERATION ONE.
 13) NOT SATISFIED. PEDESTRIAN CROSSINGS ON CLEARWATER
 MUST BE HIGH EMPHASIS ONES WITH INSTALLATION OF
 RECTANGULAR RAPID FLASHING BEACONS. STOP BARS AND
 SIGNAGE MUST BE REPLACED/REALLOCATED ACCORDINGLY. THE
 OPERATION WITHIN THE ITC ARE WITHIN COUNTY?S CONTROL.
 HOWEVER, CLEARWATER DR IS OUTSIDE OF THE ITC AND A CITY
 ROAD; THUS, COUNTY HAS NO CONTROL. MOREOVER, STOP BARS
 IN THE VICINITY OF THE PEDESTRIAN CROSSINGS WERE
 ALREADY PROPOSED BY THE DEVELOPER AND DEPICTED IN PRIOR
 SITE PLAN SUBMITTALS
 14) PROVIDE A SUMMARY TABLE CAPTURING THE NUMBER OF
 METERED PARKING REMOVED OR RELOCATED. COORDINATE WITH
 PARKING DEPARTMENT PERTAINING SUCH REMOVAL AND
 RELOCATION
 15) REMOVE THE STOP BARS ALONG CLEARWATER DR BY THE
 GARAGE ENTRANCE OR PROVIDE A TRAFFIC ANALYSIS
 WARRANTING THEIR IMPLEMENTATION
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved