| 2022-07-06 13:36:51 | CASE NO. FSPR 22-05 |
| | TRANSIT VILLAGE 2022 |
| | 150 CLEARWATER DRIVE |
| | |
| | - CONTACT CHRIS KIMMERLY @ (561) 822-1426, |
| | [email protected] |
| | - OR ERIC SCHNEIDER @ (561) 822-1446, |
| | [email protected] |
| | |
| | - PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN |
| | WRITTEN FORMAT. [ACKNOWLEDGED] |
| | THANK YOU FOR THE EXCEL DOCUMENT FOR THE RESPONSES, |
| | PLEASE PROVIDE DIRECT RESPONSES ON RESUBMITTALS WITHIN |
| | A WORD OR SIMILAR FORMAT. (DISPLAY THE QUESTION ASKED |
| | BY REVIEWERS AND THE ANSWER/RESPONSE FROM APPLICANTS) |
| | |
| | - WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF THREE |
| | (3) PAPER COPIES AND AN ELECTRONIC COPY IN .PNG AND |
| | .PDF FORMAT OF ALL PLANS. PLEASE NOTE THAT CHANGES ON |
| | THE RESUBMITTED PLANS OR THE SUBMITTAL OF |
| | INFORMATION/PLANS TO ADDRESS THE COMMENTS MAY RESULT IN |
| | ADDITIONAL COMMENTS. [ACKNOWLEDGED] |
| | |
| | - THE PPRC COMMENTS SHALL BE SUFFICIENTLY ADDRESSED AND |
| | SUBMITTED TO THE PLANNING DIVISION BY 5 PM ON FRIDAY, |
| | 05/27/22, TO BE ELIGIBLE TO BE SCHEDULED FOR THE |
| | 7/13/22 DOWNTOWN ACTION COMMITTEE MEETING. [COVID |
| | DELAYS NOT CAUSED BY APPLICANT] |
| | |
| | - PLEASE NOTE THAT IF THE PLANNING DIVISION HAS NOT |
| | RECEIVED A RESPONSE TO THE PPRC COMMENTS WITHIN 60 DAYS |
| | FROM THE DATE OF THE PPRC MEETING (BY AUGUST 12, 2022), |
| | THE PLANNING DIVISION MAY NOTIFY THE APPLICANT THAT THE |
| | CASE IS CONSIDERED WITHDRAWN. ANY FURTHER ACTION SHALL |
| | REQUIRE A NEW DEVELOPMENT APPLICATION. [ACKNOWLEDGED] |
| | |
| | - PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1) |
| | RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY ISSUED |
| | COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE |
| | APPLICANT WILL BE ASSESSED A RESUBMITTAL FEE. SUCH FEE |
| | WILL BE 20% OF THE ORIGINAL APPLICATION FEE ($500). |
| | [ACKNOWLEDGED] |
| | |
| | 1. THIS PROPOSED PROJECT IS SIGNIFICANTLY DIFFERENT |
| | THAN THE CURRENTLY APPROVED SITE PLAN; THEREFORE, IT IS |
| | NOT A ?MODIFICATION TO THE EXISTING APPROVED SITE PLAN? |
| | AS STATED IN THE JUSTIFICATION STATEMENT, BUT RATHER A |
| | NEW SITE PLAN APPROVAL. THE PREVIOUSLY APPROVED SITE |
| | PLAN AND THE VARIANCES THAT WERE GRANTED DO NOT |
| | AUTOMATICALLY APPLY TO THE NEW SITE PLAN. ANY VARIANCES |
| | THAT ARE REQUIRED BASED ON THE NEW BUILDING DESIGN AND |
| | SITE LAYOUT REQUIRE APPROVAL BY THE DOWNTOWN ACTION |
| | COMMITTEE THROUGH THE VARIANCE PROCESS. [THE CURRENT |
| | SITE PLAN IS APPROVED AND VESTED BY MULTIPLE APPROVALS |
| | PROVIDED BY WPB AND PBC PURSUANT TO THE PSA. THESE |
| | VESTED ITC AND GROUND LEVEL FEATURES THAT CAN BE |
| | LEGALLY BUILT TODAY ARE INTENDED TO BE CARRIED FORWARD |
| | IN THE NEW APPROVAL AND WE HAVE BEEN ASSURED BY |
| | ADMINISTRATION THAT THE CITY WILL RECOGNIZE THESE |
| | VESTED FEATURE AND WILL BE WORKING WITH THE APPLICANT |
| | TO CARRY THEM FORWARD IN THE NEW SITE PLAN APPROVAL |
| | BEING SOUGHT THAT WILL EVENTUALLY REPLACE AND SUPERSEDE |
| | THE EXISTING VESTED APPROVAL WITH A NEW APPROVAL THAT |
| | REAFFIRMS THESE PREVIOUSLY APPROVED SITE CONDITIONS.] |
| | PLEASE NOTE, THERE ARE NO ?VESTED? OR CARRIED OVER |
| | APPROVALS FOR THIS PROJECT, BEYOND THE ORIENTATION OF |
| | THE ITC/SFRTA FACILITIES, THE BUS/TRAIN OPERATIONS, AND |
| | THE REQUIREMENTS WITHIN THE COUNTY PSA FOR RESERVED ITC |
| | AND SFRTA PARKING SPACES. THE REST OF SITE, PROPOSED |
| | STRUCTURES, CIRCULATION, ETC. WILL BE REVIEWED AND |
| | TREATED AS A NEW SITE PLAN SUBMITTAL. ANY PREVIOUSLY |
| | OBTAINED VARIANCES, WAIVERS, AND APPROVALS FROM |
| | DAC/STAFF MUST BE REACQUIRED/APPLIED FOR, AS THE |
| | OVERALL SITE CONDITIONS AND PLANS HAVE CHANGED |
| | SIGNIFICANTLY FROM THE PREVIOUSLY APPROVED PLANS FOR |
| | THIS PROPERTY. |
| | |
| | 2. STAFF HAS NOTED THAT THE PROPOSED SITE PLAN, |
| | INCLUDING THE USE MIX, DIFFERS FROM THE AGREEMENT FOR |
| | PURCHASE AND SALE DATED AUGUST 12, 2012. SINCE THE |
| | AGREEMENT FOR PURCHASE AND SALE ESTABLISHES THAT |
| | MODIFICATIONS ARE PERMITTED, SUBJECT TO PALM BEACH |
| | COUNTY APPROVAL, PLEASE PROVIDE THE LATEST AMENDMENT OR |
| | VERSION OF THE AGREEMENT FOR PURCHASE AND SALE THAT |
| | AUTHORIZES THE CHANGES PRESENTED IN THE CURRENT |
| | SUBMITTAL, INCLUDING, BUT NOT LIMITED TO: |
| | [COPIES OF THE PSA AND ALL AMENDMENT PROVIDED. A COPY |
| | OF PBC WRITTEN CONSENT TO THE SUBMITTED PLAN PACKAGE |
| | WAS PROVIDED PURSUANT TO THE PSA AND COPIES OF ALL |
| | AGREEMENTS HAVE ALSO BEEN PROVIDED] [SATISFIED] THANK |
| | YOU FOR PROVIDING PSA DOCUMENTATION AND ADDITIONAL |
| | AMENDMENTS/AGREEMENTS. |
| | |
| | A. THE REDUCTION IN THE REQUIRED 40 PARKING SPACES FOR |
| | SFTRA/COUNTY STAFF AND 250 SFRTA PATRON PARKING SPACES |
| | (TOTAL 290 PARKING SPACES) TO 275 PARKING SPACES FOR |
| | THESE USERS. |
| | [THIS STATEMENT IS INCORRECT. THE MODIFIED PSA REQUIRES |
| | 25 SPACES TO THE COUNTY WHICH IS WHAT IS PROVIDED] |
| | [SATISFIED] THANK YOU FOR PROVIDING THE NECESSARY PSA |
| | DOCUMENTATION WITH AMENDMENTS. THE LATEST AMENDMENT TO |
| | PSA (EXHIBIT 2) THAT WAS PROVIDED WITH RESUBMITTAL |
| | STATES: 250 PARKING SPACES FOR TRI-RAIL, AND 25 SPACES |
| | FOR COUNTY. |
| | |
| | B. THE REMOVAL OF LEARNING CENTER/CULTURAL/EDUCATION |
| | USES FROM THE PROJECT. |
| | [THIS USE WAS VOLUNTARY AND IS NOT A REQUIREMENT OF ANY |
| | APPROVAL] |
| | [NOT SATISFIED] SECTION 2.3.2 OF PSA (PG.14) STATES: |
| | ?THE SITE PLAN WILL INCLUDE, BUT NOT BE LIMITED TO, |
| | CIVIC USE (LEARNING CENTER/CULTURAL CENTER/EDUCATION), |
| | COMMERCIAL/OFFICE, HOTEL ROOMS, RESIDENTIAL UNITS |
| | (STUDENT/WORKFORCE/MARKET) INCLUDING WORKFORCE AND/OR |
| | AFFORDABLE UNITS? LUXURY RENTAL UNITS AND AMENITY |
| | RETAIL.? |
| | - APPEARS TO BE A REQUIREMENT OF THE PSA, HAS THIS BEEN |
| | AMENDED? IF SO PLEASE PROVIDE SPECIFIC DOCUMENT OR |
| | OUTLINE LOCATION, SO STAFF CAN VERIFY. |
| | |
| | C. THE JUSTIFICATION STATEMENT SITE DATA TABLE LISTS 42 |
| | WORKFORCE HOUSING UNITS AS BEING REQUIRED, WHILE THE |
| | AGREEMENT FOR PURCHASE AND SALE ONLY REQUIRES 38. THE |
| | PLANS DO NOT PROVIDE A BREAKDOWN TO VERIFY COMPLIANCE |
| | WITH EITHER NUMBER. |
| | [THE 42 WORKFORCE HOUSING UNITS REQUIRED BY THE PSA ARE |
| | SHOWN IN THE SITE PLAN TABULAR. THEIR FINAL LOCATION |
| | HAS NOT YET BEEN DETERMINED, HOWEVER THE APPLICANT |
| | INTENDS TO PROVIDE THEM IN A MANNER SO AS TO NOT |
| | CLUSTER OR CONCENTRATE THEM IN ANY ONE LOCATION. THE |
| | PSA REQUIRES THEM TO BE ON SITE AND COMPLY WITH THE |
| | COUNTY HOUSING PROGRAM. THE APPLICANT WILL CONTINUE TO |
| | WORK WITH WPB AND PBC ON THE TERMS OF THE WFH UNITS.] |
| | [PARTIALLY SATISFIED] THANK YOU FOR PROVIDING THE |
| | NECESSARY DOCUMENTATION FOR THE LATEST AMENDMENT TO PSA |
| | (5C-5). THIS SHEET (5C-5) INCLUDES ADDITIONAL (4) |
| | WORKFORCE UNITS. DO NOT SEE THESE WFH UNITS CALLED OUT |
| | OR MENTIONED IN DATA TABLES OR SITE PLAN. |
| | |
| | D. SECTION 3E OF EXHIBIT D TRAFFIC CIRCULATION PLAN OF |
| | THE AGREEMENT FOR PURCHASE AND SALE LIMITS THE NUMBER |
| | OF PARKING SPACES WITHIN THE PARKING GARAGE TO THE 290 |
| | PUBLIC USE PARKING SPACES AND, ??PROVIDE NOT MORE THAN |
| | THE NUMBER OF PARKING SPACES REQUIRED BY THE CITY OF |
| | WEST PALM BEACH FOR THE MIX OF USES AND |
| | INTENSITIES/DENSITIES?AS ACTUALLY CONSTRUCTED??. AS |
| | WILL BE SHOWN LATER IN THESE COMMENTS, THE PROJECT |
| | EXCEEDS THIS STANDARD. |
| | [THESE SPACES ARE INTENDED TO SERVE THE TRANSIT USES |
| | REQUIRED TO BE PROVIDED TO THESE GOVERNMENTAL |
| | PROVIDERS. THESE PARKING SPACES ARE INCLUSIVE THE |
| | MINIMUM PARKING REQUIRED FOR THE PROJECT AND ARE NOT IN |
| | EXCESS OF THE MAXIMUM PARKING PERMITTED ON SITE. THE |
| | GARAGE COMPONENT IS BEING BUILT TO SERVE THE ENTIRE |
| | PROJECT AND THE PSA REQUIRES CONTINUOUS CONSTRUCTION OF |
| | THE PROJECT UNTIL THE PROJECT IS COMPLETED.] |
| | [PARTIALLY SATISFIED] |
| | |
| | THANK YOU FOR PROVIDING THE NECESSARY DOCUMENTATION ON |
| | THE PSA AND ITS AMENDMENTS, IN ADDITION TO THE PARKING |
| | BREAKDOWN; BASED UPON THIS: |
| | |
| | THE HOTEL ROOM/AMENITY, RESIDENTIAL, RETAIL, OFFICE, |
| | GUEST AND SFRTA/COUNTY PARKING SPACES CHECK OUT WITH |
| | REQUIRED MINIMUMS AND 25% TOD REDUCTION. |
| | |
| | - CLARIFICATION, TABLE IV-9: MICRO-UNITS MINIMUM |
| | PARKING REQUIREMENT IS ZERO, NOT 1/13 UNITS. ONLY |
| | CAR-SHARE HAS 1/13 REQUIREMENT. |
| | |
| | - PLEASE MAKE CLEAR FROM THE TABLE PROVIDED, ARE YOU |
| | PROVIDING ONLY 13 CAR-SHARE SPACES FOR MICRO-UNITS? OR |
| | ARE YOU ARE PROVIDING 13 SPACES FOR MICRO-UNITS AND |
| | THEN ADDITIONAL 13 CAR-SHARE SPACES (26 TOTAL)? THE |
| | CAR-SHARE SPACES WOULD BE INDEPENDENT FROM OTHER |
| | PARKING AND DESIGNATED/RESERVED AS SUCH. |
| | PER SECTION 94-106 (8.A) A PROJECT WITH RESIDENTIAL |
| | MICRO-UNITS SHALL PROVIDE ON-SITE CAR-SHARE STATIONS ON |
| | A RATIO OF ONE PER EVERY 13 UNITS. THE TOTAL AMOUNT OF |
| | CAR-SHARE STATIONS MAY BE REDUCED BY ONE CAR-SHARE |
| | STATION PER EVERY 13 ON-SITE PARKING SPACES PROVIDED. |
| | THE TOTAL NUMBER OF CAR-SHARE STATIONS MAY BE ADJUSTED |
| | BASED ON CURRENT SYSTEM DEMANDS, BUT A MINIMUM OF ONE |
| | CAR-SHARE STATION SHALL BE PROVIDED. THE REMAINDER OF |
| | THE SPACES SHALL BE RESERVED FOR FUTURE SERVICE |
| | EXPANSION. |
| | |
| | 3. THE SITE CURRENTLY CONSISTS OF A PBC PARCEL AND AN |
| | SFTRA PARCEL. |
| | THANK YOU FOR PROVIDING AMENDMENT 3 ? 2021 ? EXTENSTION |
| | TO AUG 2024, WHICH MENTIONED THAT THE SFRTA SPACES TO |
| | BE A CONDOMINUM. THIS INDICATES THAT THE PROJECT WILL |
| | BE UNDER CONDOMINIUM OWNERSHIP RATHER THAN SEPARATE |
| | PARCELS. IF THE AGREEMENT IS AMENDED AND THERE WILL BE |
| | FEE SIMPLE PARCELS, THOSE PARCEL LINES NEED TO BE |
| | SHOWN/INDICATED NOW, SO THAT STAFF CAN VERIFY THAT |
| | THERE ARE NO BUILDING SEPARATATION OR SETBACK ISSUES |
| | THAT DO NOT COMPLY WITH BUILDING, ZONING, OR FIRE CODE, |
| | AND IF ANY VARIANCES ARE NEEDED AS PART OF THE |
| | APPROVAL. |
| | |
| | E. THE DECKS, COLUMNS AND A PORTION OF THE RETAIL |
| | BUILDING ON THE SOUTH END OF THE SECOND FLOOR CROSS |
| | THIS PARCEL LINE, WHICH CREATE SETBACK AND BUILDING |
| | SEPARATION ISSUES THAT NEED TO BE ADDRESSED. |
| | [CONFIRMED] |
| | [NOT SATISFIED] SEE COMMENT ABOVE |
| | |
| | F. THE AGREEMENT FOR PURCHASE AND SALE INDICATES THAT |
| | PALM BEACH COUNTY WILL RETAIN OWNERSHIP OF THE |
| | INTERMODAL TRANSIT CENTER TO A POINT 21 FEET IN THE |
| | AIR. THE APPLICATION DOES NOT MENTION HOW THIS PROPOSED |
| | SUBDIVISION WILL OCCUR. [THESE PROPERTY LINES WILL BE |
| | ADDRESSED AS PART OF THE SUBDIVISION PROCESS OR BY |
| | AGREEMENT] |
| | [NOT SATISFIED] SEE COMMENTS ABOVE |
| | |
| | G. THE JUSTIFICATION STATEMENT INDICATES THAT THE |
| | AGREEMENT FOR PURCHASE AND SALE INCLUDES THE SFRTA, YET |
| | THEY ARE NOT SHOWN AS A PARTY TO STAFF?S COPY OF THE |
| | AGREEMENT. WILL THE SFRTA RETAIN ANY OWNERSHIP AND IF |
| | SO, HOW WILL THE PARCEL BE SUBDIVIDED? [LEGAL |
| | SUBDIVISION PROCESS I.E. VERTICAL SUB DIVISION, WILL BE |
| | PURSUED] [SFRTA USES THE PARKING LOT PURSUANT TO AN |
| | EASMENT FROM THE COUNTY. THE APPLICANT HAS AN AGREEMENT |
| | WITH SFRTA TO PROVIDE EITHER FEE SIMPLE OR AN EASEMENT |
| | FOR ANY USE OF THE SFRTA PROPERTY BORDERING THE |
| | TRACKS.] |
| | [NOT SATISFIED] PLEASE PROVIDE COPY OF AGREEMENT. |
| | |
| | 4. TRANSIT VILLAGE BOUNDARY DIAGRAM SHEET A0-03 |
| | DIFFERENT FROM THE ?ITC PROPERTY MAP? AND ?REQUIRED |
| | MODIFICATIONS FROM ORIGINAL APPROVAL IN OCT. 2011. |
| | CLEARLY SHOW THE ITC BOUNDARY ON THE GROUND LEVEL AND |
| | SECOND LEVEL OF THE VARIOUS PLANS. [THIS PLAN IS PART |
| | OF THE PSA AND THE BOUNDARIES HAVE BEEN ADJUSTED BY |
| | AMENDMENTS. THE CURRENT PLAN IS ACCURATE] |
| | [PARTIALLY SATISFIED] THANK YOU FOR PROVIDING AN |
| | ADJUSTED BOUNDARY MAP FOR THE PROJECT. |
| | |
| | BASED ON THIS NEW MAP, PLEASE CLARIFY, DOES THE ITC OWN |
| | THE GROUND-LEVEL PORTION OF THE HOTEL/OFFICE? THE |
| | BOUNDARY SHEET A0-03 SHOWS RETAIL, FCC, |
| | ELEVATORS/STAIRS AND MOTOR LOBBY WITHIN THE ITC |
| | PROPERTY BOUNDARY. |
| | |
| | 5. THERE ARE NUMEROUS UTILITY AND OTHER EASEMENTS SHOWN |
| | ON THE SURVEY. ALL OF THESE EASEMENTS MUST BE SHOWN ON |
| | THE SITE AND LANDSCAPE PLANS (GROUND LEVEL AND SECOND |
| | LEVEL) TO SHOW THAT THERE IS NO CONFLICT WITH THE |
| | PROPOSED DEVELOPMENT. [PLANS REVISED TO REFLECT ALL |
| | EASEMENTS ON GROUND AND SECOND LEVELS.] |
| | [NOT SATISFIED] |
| | |
| | THANK YOU FOR PROVIDING REVISED SURVEY AND PLANS WITH |
| | EASEMENTS ILLUSTRATED. BASED UPON THESE SHEETS AND |
| | ITEMS: |
| | - RESUBMITTED SURVEY DOES NOT APPEAR TO BE ACCURATE, |
| | DOES NOT FULLY REFLECT NEW BANYAN STREETSCAPE |
| | CONDITIONS AND UPDATES. MISSING THE HARDENING DONE BY |
| | FPL TO THEIR TRANSMISSION LINES, THERE IS A NEW/LARGER |
| | POLE ON BANYAN. THE LINES FROM THIS POLE RUN THROUGH |
| | THE FUTURE BUILDING. TREE GRATES ON BANYAN SIDE NO |
| | LONGER EXIST. ROW INCLUDES BIKE PATH AND PEDESTRIAN |
| | SIDEWALK. |
| | - PROVIDED SURVEY SHOWS 20? OVERHEAD UTILITY LINE |
| | EASEMENT ALONG RAILROAD/EASTERN PORTION OF PROPERTY, |
| | NOT REFLECTED IN SITE PLANS. PLEASE PROVIDE FPL |
| | APPROVALS TO VACATE OR MODIFY THIS EASEMENT. |
| | - ARE THE FIBER OPTIC EASEMENT AND FPL EASEMENT, ON THE |
| | SOUTHERN END OF PROPERTY TO REMAIN OR ARE THEY TO BE |
| | MODIFIED/VACATED? PLEASE PROVIDE NECESSARY APPROVALS IF |
| | VACATING OR MODIFYING. THESE PORTIONS OF THE EASEMENTS |
| | LIKELY WON?T BE IMPACTED BY ANY DEVELOPMENT, BUT NOTE |
| | TREES/LANDSCAPING MAY CONFLICT. |
| | - PROVIDED SURVEY SHOWS 20? FIRE EMERGENCY ACCESS |
| | EASEMENT, THIS WILL HAVE TO BE MODIFIED TO ALIGN WITH |
| | THE PROPOSED EGRESS. PLEASE PROVIDE APPROVALS FROM FIRE |
| | DEPT. TO ALTER THIS. |
| | - PROVIDED SURVEY SHOWS A CROSS ACCESS EASEMENT ON THE |
| | EASTERN BOUNDARY AS PART OF THE ITC, IS THIS TO REMAIN? |
| | |
| | 6. PLEASE DOCUMENT AND IDENTIFY ALL REQUESTED VARIANCES |
| | AND WAIVERS FOR THE PROPOSED SITE PLANS. [1) EXISTING |
| | ENTRANCE WIDTH VARIANCE EXISTING APPROVED CONDITION TO |
| | BE CARRIED FORWARD 2) SAME VARIANCE TO ALLOW THE PUBLIC |
| | OPEN SPACE TO BE PROVIDED AS A PUBLIC PLAZA ON LEVEL 2] |
| | [NOT SATISFIED] |
| | |
| | BASED UPON THE DOCUMENTATION PROVIDED WITHIN THIS |
| | RESUBMITTAL, THE PROJECT WILL REQUIRE/SEEK MORE THAN |
| | THE TWO PROPOSED VARIANCES. PLEASE ADDRESS ALL COMMENTS |
| | AND NOTE ANY DEVIATION FROM THE MINIMUM/MAXIMUM |
| | REQUIREMENTS AS THESE WILL CONSTITUTE ADDITIONAL |
| | REQUESTS FOR VARIANCES/WAIVERS. |
| | |
| | - POTENTIALLY (4) VARIANCES ALONE FOR THE CURB-CUTS |
| | PRESENTED ALONG CLEARWATER DR. EACH INGRESS/EGRESS |
| | APPEARS TO EXCEED THE 25? WIDTH MAXIMUM. |
| | - OPEN SPACES NEED ADJUSTMENT AND CLARIFICATION IN |
| | TYPOLOGY AND HOW REQUIREMENTS ARE MET, MAY CONSTITUTE |
| | ADDITIONAL VARIANCES |
| | - PROPOSED PUBLIC OPEN SPACE ON 2ND FLOOR, REQUIRES |
| | APPROVAL FROM BOARD, WILL SEEK IN THE FORM OF A |
| | VARIANCE. |
| | - MAXIMUM FOOTPRINT LENGTH EXCEEDS 350 FT. FOR TOD-25 |
| | WOULD REQUIRE VARIANCE. |
| | - THE NUMBER OF ACCESS POINTS ONTO EACH RIGHT OF WAY |
| | EXCEEDS THE 2 PERMITTED VIA SEC. 94-312 AND NO PROPERTY |
| | SHALL HAVE A TOTAL OF MORE THAN 4 ACCESS POINTS. WILL |
| | REQUIRE AN ADDITIONAL VARIANCE REQUEST. |
| | THESE ARE JUST SOME EXAMPLES OF PENDING VARIANCE |
| | REQUESTS, ADDITIONAL VARIANCES ARE DEPENDENT ON MEETING |
| | OTHER REQUIREMENTS OUTLINED IN THESE COMMENTS OR WITHIN |
| | THE CODE, UPON RESUBMITTAL. |
| | |
| | IT IS ON THE APPLICANT TO PROVIDE ALL REQUESTED |
| | VARIANCES TO PLANNING STAFF. |
| | |
| | PLEASE REMEMBER THAT YOU WILL BE CHARGED $300 PER |
| | ADDITIONAL VARIANCE OR WAIVER. |
| | |
| | 7. PLEASE PROVIDE AN UPDATED SURVEY CLEARLY DOCUMENTING |
| | THE CHANGES INCORPORATED AS PART OF THE RECENT BANYAN |
| | BOULEVARD STREETSCAPE PROJECT. ALL PLAN SHEETS MUST |
| | REFLECT THE ACCURATE BANYAN STREET CONFIGURATION. THIS |
| | IS CURRENTLY NOT REFLECTED ON ANY OF THE SUBMITTED PLAN |
| | SHEETS. [SURVEY UPDATED TO SHOW CHANGES TO BANYAN |
| | BOULEVARD GEOMETRY] |
| | [NOT SATISFIED] |
| | THANK YOU FOR PROVIDING REVISED SURVEY AND PLANS WITH |
| | EASEMENTS ILLUSTRATED. BASED UPON THESE SHEETS AND |
| | ITEMS: |
| | |
| | SEE COMMENT 5. |
| | |
| | RESUBMITTED SURVEY DOES NOT APPEAR TO BE ACCURATE, DOES |
| | NOT FULLY REFLECT NEW BANYAN STREETSCAPE CONDITIONS AND |
| | UPDATE. MISSING THE HARDENING DONE BY FPL TO THEIR |
| | TRANSMISSION LINES, THERE IS A NEW/LARGER POLE ON |
| | BANYAN. TREE GRATES ON BANYAN SIDE NO LONGER EXIST. ROW |
| | INCLUDES BIKE PATH AND PEDESTRIAN SIDEWALK. |
| | |
| | UPON REVIEW OF NEWLY SUBMITTED SURVEY, CURRENT |
| | CONDITIONS ARE NOT REFLECTED. FPL CURRENTLY HAS TWO |
| | DISTRIBUTION POLES ON THE BANYAN FRONTAGE, ONE OF WHICH |
| | IS A NEW POLE (ADDED WITH THE BANYAN STREETSCAPE |
| | IMPROVEMENTS); PLEASE PROVIDE A LETTER FROM FPL |
| | CONFIRMING/APPROVING OF THE RELOCATION OF THIS POLE AND |
| | THE VACATION/MODIFICATION OF THE EASEMENT. |
| | |
| | SITE PLANS AND CIVIL PLANS SHOW ON-STREET DROP-OFF, |
| | WHICH IS NOT PERMITTED WITHIN THE TOD DISTRICT ON |
| | BANYAN. |
| | |
| | A. PROPOSED RESIDENTIAL ON-STREET DROP OFF ON BANYAN |
| | FRONTAGE NOT PERMITTED WITHIN TOD-25 DISTRICT. [THIS IS |
| | AN EXISTING VESTED FEATURE WHICH THE APPLICANT BELIEVES |
| | OFFERS A SAFE PLACE OUTSIDE OF THE RIGHT OF AWAY FOR |
| | RESIDENTS TO BE PICKED UP BY RIDE SHARE PROVIDERS.] |
| | |
| | [NOT SATISFIED] REPEAT COMMENT. PROPOSED RESIDENTIAL |
| | ON-STREET DROP OFF ON BANYAN FRONTAGE NOT PERMITTED |
| | WITHIN TOD-25 DISTRICT. |
| | |
| | RESPECTFULLY NOTE, THERE ARE NO VESTED/CARRIED OVER |
| | APPROVALS, THIS IS A NEW SITE PLAN/PROJECT. PER SECTION |
| | 94-111 TABLE IV-11: ON-STREET PASSENGER LOADING AND |
| | DROP-OFF IS NOT PERMITTED WITHIN THE TOD DISTRICT ALONG |
| | AVENUE STREET CLASSIFICATIONS (BANYAN BOULEVARD). |
| | |
| | ADDITIONALLY, THE PROPOSED DROP-OFF DIRECTLY CONFLICTS |
| | WITH THE NEW BANYAN STREETSCAPE. CONFLICTING WITH THE |
| | IMPROVED PEDESTRIAN ENVIRONMENT WITH THE BIKE |
| | LANE/SIDEWALK. |
| | |
| | 8. SETBACKS ARE MEASURED FROM THE BACK OF CURB, NOT |
| | FROM THE PROPERTY LINE. [PLANS REVISED TO SHOW SETBACK |
| | FROM BACK OF CURB] |
| | A. SETBACK ON BANYAN (GROUND ? 5) IS 16? MIN. AND 50? |
| | MAX. (AVENUE-CLASSIFICATION) CONDITIONAL SETBACK FOR |
| | PARKING ABOVE 5TH STORY IS 31? MIN. [THE PLANS PROVIDED |
| | MEET THE REQUIRED SETBACK CRITERIA AND THE CONDITIONAL |
| | SETBACK FOR PARKING ABOVE 5TH STORY IS COMPLIANT] |
| | [PARTIALLY SATISFIED] THANK YOU FOR THE REVISIONS, |
| | BASED UPON THESE: PLEASE PROVIDE MAX SETBACK AND ANY |
| | APPLICABLE CONDITIONAL SETBACK LINES ON SITE PLANS, |
| | ELEVATIONS, AND RELEVANT FLOOR PLANS, UPDATE DATA TABLE |
| | ON SHEET A0-02 ACCORDINGLY TO REFLECT ALL PROVIDED |
| | SETBACKS PER FRONTAGE. |
| | |
| | B. SETBACK ON CLEARWATER (GROUND ? 5) IS 12? MIN. AND |
| | 60? MAX. (SECONDARY-CLASSIFICATION) CONDITIONAL SETBACK |
| | FOR PARKING ABOVE 5TH STORY IS 27? MIN. [THE PLANS |
| | PROVIDED MEET THE REQUIRED SETBACK CRITERIA AND THE |
| | CONDITIONAL SETBACK FOR PARKING ABOVE 5TH STORY IS |
| | COMPLIANT] |
| | [SEE ABOVE] |
| | |
| | C. ABUTTING CSX IS 15? MIN. [ACKNOWLEDGED] [SATISFIED] |
| | |
| | D. REAR 5? MIN. [ACKNOWLEDGED] [SATISFIED] |
| | |
| | E. SIDE INTERIOR 0? OR NFPA [ACKNOWLEDGED] [SATISFIED] |
| | |
| | F. SETBACKS INTERNAL TO THE PROPERTY BETWEEN COUNTY |
| | ITC, SFRTA, AND APPLICANT?S PROPERTIES WARRANT FURTHER |
| | DISCUSSION. AS PREVIOUSLY STATED, THE PROJECT SITE IS |
| | SPLIT BETWEEN 2 SEPARATE PARCELS, AND POTENTIAL |
| | VERTICAL SUBDIVISION. [SETBACK AND SEPARATION WILL BE |
| | HANDLED BY SEPARATE AGREEMENT BETWEEN THE AFFECTED |
| | PARTIES] |
| | [NOT SATISFIED] FURTHER CLARIFICATION/DISCUSSIONS |
| | NEEDED WITH VERTICAL SUBDIVISION |
| | |
| | 9. PARKING: THE PARKING TABLE NEEDS TO BE CORRECTED TO |
| | BETTER CONVEY THE PARKING COUNTS. PLEASE NOTE, WHILE |
| | NOT MANDATORY, STAFF HAS INCLUDED THE ADDITIONAL |
| | ALLOWED 25% TOD PARKING SPACE REDUCTION. |
| | ["SEE PARKING BREAKDOWN AND MIN MAX COMPARISON |
| | PROVIDED. THE TOTAL MINIMUM PARKING PERMITTED IS 1,684 |
| | OR (1,347 LESS 20% REDUCTION FOR TOD) |
| | |
| | TOTAL MAXIMUM PARKING PERMITTED IS 3,142 OR (2,514 LESS |
| | 20% REDUCTION FOR TOD) |
| | |
| | STRAIGHT CODE TEST: |
| | |
| | MINIMUM AND MAXIMUM RANGE WITHOUT TOD REDUCTION IS |
| | 1,684 TO 3,142 SPACES. THEREFORE THE 2,003 PROPOSED |
| | SPACES IS COMPLIANT TO LDRS |
| | |
| | MINIMUM AND MAXIMUM RANGE WITH TOD REDUCTION IS 1,347 |
| | TO 2,514 SPACES. THEREFORE THE 2,003 PROPOSED SPACES IS |
| | COMPLIANT TO LDRS EVEN WITH THE NON-MANDATORY 20% |
| | REDUCTION IMPOSED |
| | |
| | NON-CODE TEST EXCLUDING THE SFRTA AND COUNTY SPACES |
| | EVEN WITH THE SFRTA COUNTY SPACES COUNTED AS ALL BEING |
| | ABOVE MINIMUM THE PARKING PROVIDED WOULD STILL COMPLY |
| | WITH THE LDRS SEE BELOW: |
| | |
| | THE REQUIRED MINIMUM PARKING LESS THE SFRTA AND COUNTY |
| | 275 SPACES WOULD BE 1,409 SPACES OR (1,127 SPACES |
| | REQUIRED IF THE 20% REDUCTION WAS APPLIED.) |
| | |
| | THE REQUIRED MAXIMUM PARKING LESS THE SFRTA AND COUNTY |
| | 275 SPACES WOULD BE 2,867 SPACES OR (2,294 SPACES |
| | REQUIRED IF THE 20% REDUCTION WAS APPLIED.) |
| | |
| | MINIMUM AND MAXIMUM RANGE WITHOUT TOD REDUCTION IS |
| | 1,409 TO 2,867 SPACE. THEREFORE, THE PROPOSED 2,003 |
| | SPACES IS COMPLIANT TO LDRS EVEN IF THE 275 SPACES FOR |
| | THE SFRTA AND COUNTY WERE NOT RECOGNIZED AS A VALID |
| | PUBLIC USE. |
| | |
| | MINIMUM AND MAXIMUM RANGE WITH TOD REDUCTION IS 1,127 |
| | TO 2,294 SPACE. THEREFORE, THE PROPOSED 2,003 SPACES |
| | WOULD STILL BE COMPLIANT TO LDRS EVEN WITH THE |
| | NON-MANDATORY 20% REDUCTION IMPOSED WITHOUT THE 275 |
| | SPACES FOR THE SFRTA AND COUNTY BEING RECOGNIZED AS A |
| | VALID PUBLIC USE. |
| | |
| | THE 2003 SPACES PROVIDED IS WITHIN THE STATED MINIMUM |
| | AND MAXIMUMS PERMITTED BY CODE NO MATTER THE APPROACH |
| | USED.?] |
| | [PARTIALLY SATISFIED] REPEAT COMMENT FROM (2.D.) |
| | |
| | THANK YOU FOR PROVIDING THE NECESSARY DOCUMENTATION ON |
| | THE PSA AND ITS AMENDMENTS, IN ADDITION TO THE PARKING |
| | BREAKDOWN; BASED UPON THIS: |
| | |
| | THE HOTEL ROOM/AMENITY, RESIDENTIAL, RETAIL, OFFICE, |
| | GUEST AND SFRTA/COUNTY PARKING SPACES CHECK OUT WITH |
| | REQUIRED MINIMUMS AND 25% TOD REDUCTION. |
| | |
| | - CLARIFICATION, TABLE IV-9: MICRO-UNITS MINIMUM |
| | PARKING REQUIREMENT IS ZERO, NOT 1/13 UNITS. ONLY |
| | CAR-SHARE HAS 1/13 REQUIREMENT. |
| | |
| | - PLEASE MAKE CLEAR FROM THE TABLE PROVIDED, ARE YOU |
| | PROVIDING ONLY 13 SPACES FOR MICRO-UNITS? OR ARE YOU |
| | ARE PROVIDING 13 SPACES FOR MICRO-UNITS AND THEN |
| | ADDITIONAL 13 CAR-SHARE SPACES (26 TOTAL)? THE |
| | CAR-SHARE SPACES WOULD BE INDEPENDENT FROM OTHER |
| | PARKING AND DESIGNATED/RESERVED AS SUCH. |
| | PER SECTION 94-106 (8.A) A PROJECT WITH RESIDENTIAL |
| | MICRO-UNITS SHALL PROVIDE ON-SITE CAR-SHARE STATIONS ON |
| | A RATIO OF ONE PER EVERY 13 UNITS. THE TOTAL AMOUNT OF |
| | CAR-SHARE STATIONS MAY BE REDUCED BY ONE CAR-SHARE |
| | STATION PER EVERY 13 ON-SITE PARKING SPACES PROVIDED. |
| | THE TOTAL NUMBER OF CAR-SHARE STATIONS MAY BE ADJUSTED |
| | BASED ON CURRENT SYSTEM DEMANDS, BUT A MINIMUM OF ONE |
| | CAR-SHARE STATION SHALL BE PROVIDED. THE REMAINDER OF |
| | THE SPACES SHALL BE RESERVED FOR FUTURE SERVICE |
| | EXPANSION. |
| | |
| | A. OFFICE: MIN. 2.5/1000SF = 457 SPACES (MAX. 4/1000SF |
| | = 731 SPACES) AFTER 25% TOD REDUCTION, 343 REQUIRED; |
| | PROVIDING 365 SPACES [SEE ABOVE] [SATISFIED] OFFICE |
| | PARKING FALLS WITHIN MIN/MAX. CLARIFICATION, OFFICE |
| | MINIMUM IS 2.5/1000 SF NOT 2/1000 SF. |
| | |
| | B. HOTEL: MIN. 1/4ROOMS = 27 SPACES, 1/800 SF = 11 |
| | SPACES (MAX. 1/ROOM = 108 SPACES, 1/400 SF = 23 |
| | SPACES); AFTER 25% TOD REDUCTION, 29 REQUIRED; |
| | PROVIDING 38 SPACES [SEE ABOVE] [SATISFIED] |
| | |
| | C. COMMERCIAL: MIN. 2/1000 SF = 110 SPACES (MAX. 4/1000 |
| | SF = 219 SPACES) AFTER 25% TOD REDUCTION, 83 REQUIRED; |
| | PROVIDING 110 SPACES [SEE ABOVE] [SATISFIED] |
| | |
| | D. RESIDENTIAL: MIN. 1/UNIT = 821 SPACE, 1/20 GUEST = |
| | 41 GUEST (MAX. 2/UNIT = 1,642 SPACES, 41 GUEST) AFTER |
| | 25% TOD REDUCTION, 661 REQUIRED; PROVIDING 896 SPACES |
| | TOTAL, NEED A CLEARER BREAKDOWN. [SEE PARKING DATA |
| | PROVIDED] [SATISFIED] |
| | |
| | E. MICRO-UNITS: MIN. 0/UNIT (MAX. 0.5/UNIT = 83 SPACES, |
| | 1/20 GUEST = 8 SPACES); PROVIDING? NEED CLEARER |
| | BREAKDOWN. [SEE PARKING DATA PROVIDED] [PARTIALLY |
| | SATISFIED] PLEASE MAKE CLEAR FROM THE TABLE PROVIDED, |
| | ARE YOU PROVIDING ONLY 13 SPACES FOR MICRO-UNITS? OR |
| | ARE YOU ARE PROVIDING 13 SPACES FOR MICRO-UNITS AND |
| | THEN ADDITIONAL 13 CAR-SHARE SPACES (26 TOTAL)? THE |
| | CAR-SHARE SPACES WOULD BE INDEPENDENT FROM OTHER |
| | PARKING AND DESIGNATED/RESERVED AS SUCH. |
| | PER SECTION 94-106 (8.A) A PROJECT WITH RESIDENTIAL |
| | MICRO-UNITS SHALL PROVIDE ON-SITE CAR-SHARE STATIONS ON |
| | A RATIO OF ONE PER EVERY 13 UNITS. THE TOTAL AMOUNT OF |
| | CAR-SHARE STATIONS MAY BE REDUCED BY ONE CAR-SHARE |
| | STATION PER EVERY 13 ON-SITE PARKING SPACES PROVIDED. |
| | THE TOTAL NUMBER OF CAR-SHARE STATIONS MAY BE ADJUSTED |
| | BASED ON CURRENT SYSTEM DEMANDS, BUT A MINIMUM OF ONE |
| | CAR-SHARE STATION SHALL BE PROVIDED. THE REMAINDER OF |
| | THE SPACES SHALL BE RESERVED FOR FUTURE SERVICE |
| | EXPANSION. |
| | |
| | F. LIVE/WORK UNITS: MIN. 2/1000 SF = 534 SPACES (MAX. |
| | 4/1000SF = 1068 SPACES); AFTER 25% TOD REDUCTION, 400 |
| | REQUIRED; PROVIDING? NEED CLEARER BREAKDOWN. ALSO THERE |
| | ARE A TOTAL OF 12 LIVE/WORK UNITS FOR 267,000 SF, |
| | ASSUMING ~22,250 SF EACH? PLEASE EXPLAIN THESE UNITS. |
| | [THERE ARE NO LIVE WORK UNITS PROPOSED] [SATISFIED] |
| | JUSTIFICATION LETTER SPOKE TO PREVIOUS APPROVAL?S |
| | LIVE-WORK UNITS, THESE ARE NOT CARRIED OVER TO THE |
| | CURRENT PROJECT. |
| | |
| | G. SFRTA AND ITC PARKING: MIN. 290 SPACES (250 FOR |
| | SFRTA PATRONS AND 40 FOR SFRTA/COUNTY); PROVIDING 275? |
| | WHY THE SHORTAGE OF 15 SPACES PER THE PSA? [PSA (AS |
| | AMENDED) REQUIRES 275 SPACES 250 FOR SFRTA AND 25 FOR |
| | THE COUNTY] [SATISFIED] LATEST AMENDMENT TO PSA |
| | (EXHIBIT 2) THAT WAS PROVIDED WITH RESUBMITTAL STATES: |
| | 250 PARKING SPACES FOR TRI-RAIL, AND 25 SPACES FOR |
| | COUNTY. |
| | |
| | H. TOTAL MIN REQUIRED: 1,467 SPACES (WITHOUT ANY FOR |
| | MICRO-UNITS AND NOT INCLUDING 534 FOR LIVE/WORK) 2001 |
| | WITH LIVE/WORK INCLUDED; 2,291 WITH SFRTA/ITC PARKING. |
| | NOT COUNTING 25% REDUCTION. PROVIDING 2,003 SPACES WITH |
| | 319 UNALLOCATED. EXPLAIN THE UNALLOCATED. [EVERY USE IS |
| | PARKED AT THE MINIMUM, ALL EXCESS SPACES HAVE BEEN |
| | POOLED TOGETHER IN THE UNALLOCATED CATEGORY SO THEY CAN |
| | BE USED AS FLEXIBLE OVER FLOW TO SERVE ENTIRE PROJECT |
| | WHEN NEEDED] [SATISFIED] PARKING TABLE/DATA PROVIDED. |
| | |
| | I. BIKE PARKING: MIN. 1/15 COMMERCIAL/HOTEL/OFFICE = 40 |
| | SPACES REQUIRED, 1/15 RESIDENTIAL = 57 SPACES REQUIRED, |
| | ALSO NEED TO PROVIDE A SHOWER/CHANGING FACILITY WITHIN |
| | 200 FT. OF BUILDING ENTRANCE. PROVIDING 116 COMMERCIAL, |
| | 100 RESIDENTIAL. [COVERED BIKE PARKING IS PROVIDED AT |
| | THE GROUND FLOOR OF THE GARAGE. THE REQUIRED SHOWERING |
| | CHANGING FACILITY IS ALSO PROVIDED AND SHOWN ON THE |
| | LEVEL TWO PLAZA APPROXIMATELY 75 FEET NORTH OF OFFICE |
| | AND HOTEL LOBBY ENTRANCE. THESE FACILITIES ARE ALSO |
| | ACCESSIBLE FROM THE PARKING GARAGE SOUTHEAST ELEVATOR |
| | AND STAIR.] [NOT SATISFIED] UPON REVIEW OF RESUBMITTED |
| | PARKING DATA, REQUIRED SPACES ARE 1/15 SPACES |
| | (COMMERCIAL, OFFICE, HOTEL) AND 1/1 SPACES |
| | (RESIDENTIAL). TOTALING 35 AND 59 REQUIRED BIKE SPACES |
| | RESPECTIVELY. PLEASE PROVIDE TOTAL COUNT OF BIKE SPACES |
| | INTERNAL TO BUILDING ON SHEET A0-02, DIAGRAM ON A5-02 |
| | PROVIDES 72 SPACES (2 PER RACK), REQUIREMENT IS 94 FOR |
| | THESE PROJECT USES. |
| | |
| | MICRO-UNIT PROVISIONS (PER. SEC. 94-106 8.A.) REQUIRES |
| | 0.5 BICYCLE PARKING SPACES PER UNIT. REQUIRING ~ 83 |
| | SPACES. |
| | |
| | BIKE SPACES SHALL BE DISTRIBUTED AMONGST THE |
| | BUILDINGS/VARIED USERS NOT CONCENTRATED WITHIN A SINGLE |
| | ROOM OR LOCATION. OFFICE/HOTEL USERS HAVE TO TRAVEL |
| | OVER 600 FT. TO ACCESS ENCLOSED BIKE PARKING. |
| | RETAIL/COMMERCIAL USERS ON BANYAN/CLEARWATER SIDE HAVE |
| | TO TRAVEL THE SAME 600+ FT. DISTANCE TO ACCESS SHOWERS. |
| | RECOMMEND THAT THE DISTRIBUTION SHOULD ENTAIL A MORE |
| | APT RATIO OR DISTRIBUTION OF ONE ENCLOSED/SECURED BIKE |
| | ROOM AND SHOWER FACILITY PER TOWER. |
| | |
| | I. PROVIDE SECURE RESIDENT BICYCLE ROOMS. PROVIDE |
| | NON-RESIDENTIAL COVERED BICYCLE PARKING AREAS |
| | DISTRIBUTED THROUGHOUT THE SITE. PROVIDE THE DIMENSIONS |
| | FOR THE BICYCLE PARKING AREAS ON THE PLANS. [COVERED |
| | SECURE BIKE PARKING IS PROVIDED AT THE GROUND FLOOR |
| | LEVEL OF THE GARAGE] [DETAILS AND DIMENSIONS PROVIDED] |
| | [NOT SATISFIED] UPON REVIEW OF RESUBMITTED PARKING |
| | DATA; BIKE PARKING INTERNAL TO BUILDING NEEDS TO MEET |
| | MINIMUM REQUIREMENTS OF 94 SECURED SPACES, GROUND FLOOR |
| | ONLY SHOWS 72 SPACES. NOT INCLUDING ADDITIONAL 83 |
| | SPACES DEDICATED TO MICRO-UNIT USE. ON SHEETS A1-03, |
| | A1-04, AND A1-05 ROOM INTERNAL TO GARAGE LABELED |
| | ?SCOOTER/BIKE PARKING? HOW ARE THESE ROOMS/SPACES |
| | ACCESSED, ARE THERE ADDITIONAL RACKS LOCATED HERE, AND |
| | WHAT ARE THE DIMENSIONS? PLEASE PROVIDE MORE DETAILS OF |
| | THESE AREAS. |
| | |
| | REPEAT FROM (9.I.I.) BIKE SPACES SHALL BE DISTRIBUTED |
| | AMONGST THE BUILDINGS/VARIED USERS NOT CONCENTRATED |
| | WITHIN A SINGLE ROOM OR LOCATION. OFFICE/HOTEL USERS |
| | HAVE TO TRAVEL OVER 600 FT. TO ACCESS ENCLOSED BIKE |
| | PARKING. RETAIL/COMMERCIAL USERS ON BANYAN/CLEARWATER |
| | SIDE HAVE TO TRAVEL THE SAME 600+ FT. DISTANCE TO |
| | ACCESS SHOWERS. RECOMMEND THAT THE DISTRIBUTION SHOULD |
| | ENTAIL A MORE APT RATIO OR DISTRIBUTION, RECOMMEND ONE |
| | ENCLOSED/SECURED BIKE ROOM AND SHOWER FACILITY PER |
| | TOWER. |
| | |
| | ACCESS TO BIKE STORAGE LIMITED TO REAR ENTRANCE ON |
| | CSX/BANYAN CORNER OF THE SITE, NO INTERNAL ACCESS |
| | APPEARS TO BE AVAILABLE OUTSIDE OF CROSSING OVER THE |
| | ADA SPACES. PLEASE CONSIDER REVISIONS. |
| | |
| | II. WHERE ARE THE SHOWER/CHANGING FACILITIES LOCATED? |
| | [THE REQUIRED SHOWERING CHANGING FACILITY IS ALSO |
| | PROVIDED AND SHOWN ON THE LEVEL TWO PLAZA APPROXIMATELY |
| | 75 FEET NORTH OF OFFICE AND HOTEL LOBBY ENTRANCE. THESE |
| | FACILITIES ARE ALSO ACCESSIBLE FROM THE PARKING GARAGE |
| | SOUTHEAST ELEVATOR AND STAIR.] |
| | [NOT SATISFIED] THANK YOU FOR PROVIDING SHOWER |
| | FACILITIES WITHIN THE PLAN, PLEASE LABEL AND INDICATE |
| | THESE CLEARLY. BASED UPON THE RESPONSE AND RESUBMITTAL: |
| | |
| | CLARIFICATION, ARE THESE THE THREE ORANGE ROOMS BETWEEN |
| | THE RETAIL BAYS ON SHEET A1-02? CAN THE SHOWER |
| | FACILITIES BE LOCATED CLOSER TO THE PROPOSED BIKE |
| | STORAGE ROOM OR BETTER DISTRIBUTED AMONG THE BUILDINGS? |
| | |
| | REPEAT FROM (9.I.I.) BIKE SPACES SHALL BE DISTRIBUTED |
| | AMONGST THE BUILDINGS/VARIED USERS NOT CONCENTRATED |
| | WITHIN A SINGLE ROOM OR LOCATION. OFFICE/HOTEL USERS |
| | HAVE TO TRAVEL OVER 600 FT. TO ACCESS ENCLOSED BIKE |
| | PARKING. RETAIL/COMMERCIAL USERS ON BANYAN/CLEARWATER |
| | SIDE HAVE TO TRAVEL THE SAME 600+ FT. DISTANCE TO |
| | ACCESS SHOWERS. RECOMMEND THAT THE DISTRIBUTION SHOULD |
| | ENTAIL A MORE APT RATIO OR DISTRIBUTION OF ONE |
| | ENCLOSED/SECURED BIKE ROOM AND SHOWER FACILITY PER |
| | TOWER. |
| | |
| | J. IN THOSE CASES WHERE THE SIDE OF ANY PARKING STALL |
| | IS ADJACENT TO A WALL, FENCE, BUILDING, OR OTHER |
| | PHYSICAL OBSTRUCTION, THE STALL WIDTHS SHALL BE |
| | INCREASED BY A MINIMUM OF ONE FOOT. WHERE THERE IS AN |
| | OBSTRUCTION ON BOTH SIDES OF THE STALL, THE STALL |
| | WIDTHS SHALL BE INCREASED BY A MINIMUM OF TWO FEET. |
| | [ACKNOWLEDGED - WE WILL BE UTILIZING THE ALLOWABLE |
| | PARKING REDUCTIONS AND OR USING COMPACT SPACE |
| | PROVISIONS TO ENSURE PROPER SEPARATION IS MAINTAINED] |
| | [NOT SATISFIED] PLEASE PROVIDE DIMENSIONS OR DETAILS |
| | INDICATING SEPARATION IS MAINTAINED. PLEASE FOLLOW SEC. |
| | 94-485 (N.)(1.) FOR SMALL CAR SPACE REQUIREMENTS, AND |
| | OUTLINE PERCENTAGE/INDICATE ON DRAWINGS ACCORDINGLY. |
| | |
| | III. PARKING GARAGE HAS INSTANCES WHERE PARKING SPACES |
| | APPEAR TO BE NEXT TO WALLS OR STRUCTURE. [ADJUSTMENTS |
| | TO BE MADE AS INDICATED ABOVE ON FINAL PERMITS TO |
| | ENSURE COMPLIANCE] [NOT SATISFIED] SEE ABOVE |
| | |
| | IV. ADA PARKING SPACES ARE LOCATED IN INEFFICIENT AND |
| | NOT OPTIMAL AREAS. ALL SPACES SHALL HAVE ACCESS TO A |
| | CURB RAMP OR CURB CUT, WHEN NECESSARY, TO ALLOW |
| | ENTRANCE TO THE BUILDING SERVED. SPACES SHALL BE |
| | LOCATED SO THAT USERS ARE NOT COMPELLED TO WALK OR |
| | OTHERWISE MOVE BEHIND PARKED VEHICLES, EXCLUDING OTHER |
| | VEHICLES PARKED IN ADJACENT PARKING SPACES FOR THE |
| | DISABLED. [ADA SPACES HAVE BEEN ADJUSTED TO PROVIDE |
| | EFFICIENT ACCESS ROUTES TO AND FROM ENTRY POINTS OR |
| | ELEVATOR CORES] [NOT SATISFIED] THANK YOU FOR PROVIDING |
| | ADJUSTMENTS AND ALTERING PLANS, BASED UPON THESE |
| | CHANGES: |
| | |
| | ADA DISTRIBUTION AFTER RECONFIGURATION STILL POSES |
| | QUESTIONS FOR CLARIFICATION. |
| | |
| | A) PLEASE PROVIDE CLARIFICATION OF HOW ADA PATRONS OF |
| | OFFICE, HOTEL, RETAIL, AND TRI-RAIL USERS WILL SAFELY & |
| | EFFICIENTLY ACCESS THESE FACILITIES FROM THE GARAGE. |
| | |
| | B) CURRENT ADA SPACE DISTRIBUTION ON SHEET A1-02 (FOR |
| | SFRTA PATRONS AND COUNTY EMPLOYEES) FORCES ADA USERS TO |
| | TRAVEL THROUGH RESIDENTIAL LOBBY ELEVATORS TO ACCESS |
| | REST OF SITE. DISTRIBUTION OF ADA SPACES ON THIS LEVEL |
| | SHALL PROVIDE SHORTEST/MOST EFFICIENT PATH TO END USE, |
| | ADA SPACES SHOULD BE LOCATED AT THE ELEVATOR SHAFT |
| | CONNECTED TO UPPER PLAZA AND THE ELEVATOR SHAFT CLOSEST |
| | TO THE TRI-RAIL PEDESTRIAN BRIDGE. |
| | |
| | C) IS THE INTENTION FOR GENERAL PUBLIC WITH ADA NEEDS |
| | TO ACCESS REST OF SITE/RETAIL VIA ELEVATORS THROUGH THE |
| | RESIDENTIAL TOWERS? |
| | |
| | D) GROUND LEVEL, THE ADA VAN SPACE AT THE END OF THE |
| | ROW FORCES USERS TO WALK BEHIND OTHER PARKED CARS TO |
| | ACCESS DOORS TO BIKEROOM/OUTSIDE. ADA CODE LANGUAGE |
| | MORE RESTRICTIVE THAN ZONING PROVISION. THIS SPACE IS |
| | NOT COMPLIANT AND WILL NEED TO BE RELOCATED/REMOVED |
| | FROM HOW IT IS CURRENTLY SHOWN. |
| | |
| | E) GROUND ITC ADA PATH FOR VANS, NOT THE CLOSEST/MOST |
| | EFFICIENT OR DIRECT ACCESS TO REST OF SITE, ONLY |
| | BENEFITS RETAIL SPACES ALONG THE CSX FRONTAGE. BETTER |
| | DISTRIBUTION WOULD BE AROUND UPPER LEVEL ELEVATOR |
| | SHAFTS. |
| | |
| | V. PLEASE PROVIDE PARKING PAINTED STRIPING DETAILS THAT |
| | MEET THE CITY STANDARDS OF SEC. 94-485. [PLANS AMENDED |
| | TO INCLUDE DETAILS] [SATISFIED] |
| | VI. PLEASE PROVIDE ALL PARKING DIMENSIONS FOR DRIVE |
| | AISLE, PARKING RAMP SLOPE, PARKING STALLS, ETC. [PLANS |
| | AMENDED TO INCLUDE DETAIL AND DIMENSIONS] [SATISFIED] |
| | |
| | K. PARKING STRUCTURE RAMP SLOPES: INTERNAL RAMPS APPEAR |
| | 15.8% AND 12.4%. PER SEC. 94-111 (Q.)(2.) IF THE RAMP |
| | IS GREATER THAN 14 PERCENT, A BREAK-OVER TRANSITION |
| | SHALL BE REQUIRED. [TYPICAL CODE COMPLAINT DIMENSIONS |
| | PROVIDED. RAMP SLOPE AMENDED TO PROVIDE COMPLAINT SLOPE |
| | OR BREAK-OVER TRANSITION] [SATISFIED] |
| | |
| | L. INTERNAL PARKING STRUCTURE POSES CONCERNS WITH |
| | INGRESS/EGRESS OF RESIDENTS, EMPLOYEES, VISITORS, AND |
| | THE OPERATIONS OF LOADING AND BICYCLE USERS. LOADING |
| | SPACES AND BAYS ARE INEFFICIENT AND CAUSE CONFLICT |
| | ZONES/SAFETY CONCERNS. POTENTIAL SPILLBACK AND QUEUING |
| | ISSUES ONTO CLEARWATER. [WE DISAGREE. LOADING AND |
| | ACCESS IS EFFICIENT AND MEETS CODE THE CONCEPT TO |
| | CREATE A SINGULAR GARAGE TO SERVE THE ENTIRE |
| | DEVELOPMENT AS A TRANSIT FACILITY. THE IDEA IS TO NOT |
| | PARK THE SITE AS A TYPICAL DEVELOPMENT WITH GARAGES |
| | PROVIDED IN EACH BUILDING BUT RATHER A MORE URBAN |
| | CONCEPT THAT PARKS CARS CENTRALLY TO THE DEVELOPMENT |
| | WITH PATRONS AND RESIDENTS WALKING THE SHORT DISTANCE |
| | TO AND FROM THE INTENDED END USE WITHOUT HAVING TO |
| | REPARK.] |
| | |
| | [NOT SATISFIED] PLEASE PROVIDE JUSTIFICATION FOR DOUBLE |
| | INGRESS RAMP AND DOUBLE EGRESS RAMP. |
| | |
| | GROUND LEVEL LOADING BAYS AND OPERATION CREATES CLEAR |
| | CONFLICT POINTS AND IS A TRAFFIC/SAFETY HAZARD WITH |
| | INGRESS/EGRESS OF PATRONS TO THE UPPER LEVELS OF THE |
| | GARAGE AND GROUND LEVEL ADA ACCESS. QUEUING AND |
| | SPILLBACK IS AN INEVITABILITY DURING OPERATIONAL HOURS. |
| | |
| | AUTOTURN FOR DELIVERIES POSES CONFLICT POINTS WITH ADA |
| | AND OTHER OPERATIONS, INTERSECTS WITH DOWNWARD RAMP. |
| | |
| | INTERNAL GARAGE CIRCULATION ALTERNATING ACROSS LEVELS |
| | WITH ONE-WAY/TWO-WAY AISLES POSES CONCERNS. |
| | |
| | IS THE INTENTION FOR GENERAL PUBLIC TO ACCESS REST OF |
| | SITE/RETAIL VIA ELEVATORS THROUGH THE RESIDENTIAL |
| | TOWERS? |
| | |
| | REPEAT COMMENT PORTION OF (9.J.IV.A.) PLEASE PROVIDE |
| | CLARIFICATION OF HOW GENERAL PUBLIC/USERS OF OFFICE, |
| | HOTEL, RETAIL, AND TRI-RAIL USERS WILL EFFICIENTLY |
| | ACCESS THESE FACILITIES FROM THE CENTRALLY LOCATED |
| | GARAGE. |
| | |
| | M. THE PARKING GARAGE SHOULD BE PREWIRED FOR EV |
| | CHARGERS BOTH FOR RESIDENTS AND CUSTOMERS. THE |
| | ELECTRICAL ROOMS NEED TO BE PROVIDED WITH SUFFICIENT |
| | SPACE TO ACCOMMODATE THE REQUIRED ELECTRICAL PANELS AND |
| | AREAS NEED TO BE DESIGNATED FOR THE TRANSFORMERS. |
| | [ACKNOWLEDGED] [PARTIALLY SATISFIED] IF YOU PLAN TO |
| | PROVIDE EV SPACES AT THIS TIME, PLEASE SHOW WHERE THESE |
| | ARE LOCATED. |
| | |
| | 10. CURB-CUTS AND PASSENGER LOAD/DROP-OFF: PER SEC. |
| | 94-111 TABLE IV-11 ? TOD DOES NOT PERMIT ON-STREET |
| | AND/OR PASSENGER DROP-OFF OR LOADING ON AVENUE |
| | (BANYAN). [ONE CURB CUT HAS BEEN REMOVED FROM THE |
| | BANYAN. ALL OTHER CURB CUTS AND PASSENGER PICK UP |
| | LOCATIONS HAVE BEEN PREVIOUSLY APPROVED IN THEIR |
| | PRESENT LOCATIONS. ONE AND ONE PASSENGER DROP OFF CURB |
| | CUT WAS REMOVED ON BANYAN] [NOT SATISFIED] BASED UPON |
| | THE RESUBMITTED DOCUMENTS: |
| | [REPEAT COMMENT] PROPOSED RESIDENTIAL ON-STREET DROP |
| | OFF ON BANYAN FRONTAGE NOT PERMITTED WITHIN TOD-25 |
| | DISTRICT. |
| | |
| | THERE ARE NO VESTED/CARRIED OVER APPROVALS, THIS IS A |
| | NEW SITE PLAN/PROJECT. PER SECTION 94-111 TABLE IV-11: |
| | ON-STREET PASSENGER LOADING AND DROP-OFF IS NOT |
| | PERMITTED WITHIN THE TOD DISTRICT ALONG AVENUE STREET |
| | CLASSIFICATIONS (BANYAN BOULEVARD). |
| | |
| | ADDITIONALLY, THE PROPOSED DROP-OFF DIRECTLY CONFLICTS |
| | WITH THE NEW BANYAN STREETSCAPE. |
| | |
| | CURB-CUT ON BANYAN FOR NONCOMPLIANT PASSENGER DROP-OFF |
| | IS STILL SHOWN ON ALL RESUBMITTED SITE PLANS, LANDSCAPE |
| | PLANS, AND ENGINEERING PLANS. |
| | |
| | STAFF DOES NOT SUPPORT THE RESIDENTIAL DROP-OFF FOR THE |
| | MIDDLE RESIDENTIAL TOWER ALONG CLEARWATER. PROPOSED |
| | SEPARATE DROP-OFF ROADWAY DOES NOT MAKE SENSE |
| | OPERATIONALLY AND DOES NOT REFLECT A SAFE/PLEASANT |
| | PEDESTRIAN ENVIRONMENT OR BUILT UP URBAN CONTEXT. |
| | CREATES A VEHICULAR-FOCUSED SPACE WITH NARROW LANDSCAPE |
| | BUFFER, PEDESTRIANS ARE BOUNDED BY 2 TRAVEL LANES. |
| | BUILDING WOULD BE BETTER ORIENTED CLOSER TOWARD |
| | CLEARWATER DR. ACTIVATING THE FRONTAGE, WITH THE |
| | DROP-OFF LOCATED AT THE REAR OF THE BUILDING, IN PLACE |
| | OF OR ALONG THE PROPOSED LOADING AREA. PROVIDES THE |
| | MOST DIRECT ROUTE INTO THE GARAGE FOR VALET SERVICES |
| | AND AVOIDS ADDITIONAL CIRCULATION. |
| | A TYPE A PORTE-COCHERE OFF CLEARWATER IS MORE |
| | COMPATIBLE AND APPROPRIATE FOR THIS SPACE, IF A |
| | DROP-OFF IS NEEDED ALONG THE RESIDENTIAL FRONTAGE. |
| | SIMILAR TO EXISTING ITC DROP-OFF IN FRONT OF |
| | HOTEL/OFFICE. |
| | |
| | THE NUMBER OF ACCESS POINTS ONTO EACH RIGHT OF WAY |
| | EXCEEDS THE 2 PERMITTED VIA SEC. 94-312 AND NO PROPERTY |
| | SHALL HAVE A TOTAL OF MORE THAN 4 ACCESS POINTS. WILL |
| | REQUIRE AN ADDITIONAL VARIANCE REQUEST. |
| | |
| | WIDTH OF CURB-CUT BETWEEN RESIDENTIAL TOWERS EXCEEDS |
| | PERMITTED 25FT. APPEARS TO BE 30 FT. + PLEASE PROVIDE |
| | DIMENSIONS OF ALL CURB CUTS/DRIVE ACCESS. |
| | |
| | WIDTH OF CURB-CUT BETWEEN RESIDENTIAL TOWER AND |
| | HOTEL/OFFICE TOWER EXCEEDS PERMITTED 25FT. APPEARS TO |
| | BE 30 FT. + PLEASE PROVIDE DIMENSIONS OF ALL CURB |
| | CUTS/DRIVE ACCESS. |
| | |
| | WIDTH OF CURB-CUTS FOR THE ITC BUS LOOP EXCEEDS |
| | PERMITTED 25 FT. INGRESS WIDTH NEARLY 60 FT. EGRESS |
| | APPROXIMATELY 40-45FT. PLEASE PROVIDE DIMENSIONS OF ALL |
| | CURB CUTS/DRIVE ACCESS. |
| | |
| | WIDTH OF CURB-CUTS FOR THE GARAGE INGRESS/EGRESS |
| | EXCEEDS PERMITTED 25 FT. WIDTH NEARLY FT. PLEASE |
| | PROVIDE DIMENSIONS OF ALL CURB CUTS/DRIVE ACCESS. |
| | |
| | PLEASE PROVIDE AUTO-TURN ANALYSIS FOR THE ITC/BUS LOOP |
| | OPERATION. |
| | |
| | 11. PLEASE PROVIDE AN FAR AND GBA DIAGRAM SHOWING THE |
| | BREAKDOWN OF THE PROJECT?S COUNTED/UNCOUNTED ROOMS AND |
| | SPACES. [PLANS UPDATED TO PROVIDE FAR GBA DIAGRAMS] |
| | A. GROSS BUILDING AREA MEANS THE TOTAL FLOOR AREA OF A |
| | BUILDING, INCLUDING AIR-CONDITIONED OR FULLY ENCLOSED |
| | STORAGE SPACES, ENCLOSED AREAS ON THE ROOFTOP, SUCH AS |
| | BATHROOMS AND LOBBIES, STAIRS AND ELEVATOR AREAS, AND |
| | EXTERNAL UNENCLOSED CIRCULATION AREAS. THE GROSS |
| | BUILDING AREA DOES NOT INCLUDE PARKING AREAS; |
| | UNENCLOSED COLONNADES, PORCHES AND BALCONIES; |
| | MECHANICAL AND ELECTRICAL SPACES; AND TRASH ROOMS. |
| | STORAGE SPACES WITHOUT WINDOWS AND ENCLOSED BY SURFACES |
| | THAT ALLOW FOR NATURAL VENTILATION OR OUTSIDE AIR |
| | CIRCULATION SHALL NOT BE INCLUDED. [ACKNOWLEDGED] |
| | [NOT SATISFIED] GROUND LEVEL A6-01, ENCLOSED BIKE |
| | STORAGE ROOM COUNTS TOWARD GBA/FAR. |
| | |
| | VII. GROSS BUILDING AREA REQUIREMENTS: |
| | 1. ANY PORTION OF THE PARKING AREA WHICH EXCEEDS THE |
| | MAXIMUM PARKING RATIO SHALL BE INCLUDED IN THE |
| | CALCULATIONS OF GROSS BUILDING AREA. THIS SHALL INCLUDE |
| | STALLS AND ALL ASSOCIATED CIRCULATION AREAS. [PROJECT |
| | PARKING PROVIDED IS WITHIN THE MINIMUM AND MAXIMUM |
| | RANGE PERMITTED AND DOES NOT COUNT TOWARD GBA OR THE |
| | FAR CALCULATIONS] [SATISFIED] |
| | |
| | 2. PARKING LOCATED BELOW GRADE SHALL NOT BE COUNTED AS |
| | PART OF THE GROSS BUILDING AREA. [ACKNOWLEDGED] |
| | [SATISFIED] |
| | |
| | 3. THE GROSS BUILDING AREA SHALL BE MEASURED FROM THE |
| | OUTSIDE FACE OF EXTERIOR WALLS. [ACKNOWLEDGED] |
| | [SATISFIED] |
| | |
| | 12. PLEASE PROVIDE ACTIVE USE DIAGRAM AND CALCULATIONS |
| | FOR SITE FRONTAGES. [ACTIVE USE DIAGRAM PROVIDED ON |
| | REVISED PLANS] [SATISFIED] |
| | |
| | 13. IT APPEARS THAT THE ELEVATION DRAWINGS DO NOT MATCH |
| | THE GROUND LEVEL SITE PLAN. THE ELEVATION DRAWINGS MUST |
| | INCLUDE HORIZONTAL DIMENSIONS FOR THE VARIOUS FEATURES |
| | SO THAT STAFF CAN VERIFY THAT THE ELEVATIONS MATCH THE |
| | SITE PLAN BUT ALSO THAT THE SITE FRONTAGES COMPLY WITH |
| | THE VARIOUS ZONING REQUIREMENTS. [CHECKED FOR ACCURACY |
| | AND REVISE AS NEEDED] [NOT SATISFIED] AN EXAMPLE ON |
| | SHEET A2-01 DETAIL ON THE HOTEL/OFFICE TOWER SHOWS A |
| | SUPPORT COLUMN NOT ILLUSTRATED WITHIN THE SITE PLANS. |
| | ADDITIONAL COLUMN SHOWN IN ELEVATION ADJACENT TO THE |
| | SPIRAL STAIRCASE FEATURE, NOT SHOWN IN SITE PLAN. |
| | ADDITIONALLY, PLEASE PROVIDE ALL ENTRANCES, DOORS, ETC. |
| | ON GROUND-LEVEL SO STAFF CAN VERIFY ELEMENTS MATCH SITE |
| | PLAN. ALL PLANS NEED TO SHOW CONSISTENT AND ACCURATE |
| | INFORMATION. |
| | |
| | 14. PLEASE SPECIFY THE TYPE OF OPEN SPACES (PRIVATE & |
| | PUBLIC) PROVIDED ON THE DRAWINGS, REFERENCE SEC. 94-109 |
| | AND TABLE IV-7. CLARIFY HOW THE REQUIREMENTS OF EACH |
| | OPEN SPACE TYPE IS MET WITHIN THE LANDSCAPE DRAWINGS. |
| | [TYPE OF OPEN SPACES HAVE BEEN PROVIDED ON THE |
| | LANDSCAPE CALCULATIONS SHEET.] |
| | |
| | THANK YOU FOR PROVIDING OPEN SPACES AND CALCULATIONS |
| | SHEET, BASED ON WHAT WAS SUBMITTED: |
| | |
| | [NOT SATISFIED] PUBLIC OPEN SPACE ON CORNER OF |
| | CLEARWATER & BANYAN LABELED AS COURTYARD, THIS TYPE OF |
| | PUBLIC SPACE IS NOT PERMITTED IN TOD-25 DISTRICT. |
| | GARDEN COURTYARD CLASSIFICATION IS PERMITTED. (TABLE |
| | IV-6) |
| | |
| | SHEET L002 (LANDSCAPE CALCULATIONS) MISLABELED |
| | COURTYARD IS ON GROUND LEVEL, GARDEN PLAZA IS ON 2ND |
| | LEVEL, CHECK SF DIMENSIONS. |
| | GARDEN PLAZA HAS A MINIMUM 50% VEGETATED AREA, GARDEN |
| | COURTYARD HAS A MINIMUM 50% VEGETATED. |
| | |
| | GARDEN PLAZA HAS A MINIMUM 50% TREE CANOPY, GARDEN |
| | COURTYARD HAS A MINIMUM 50% TREE CANOPY. |
| | |
| | SPECIFY SEATING REQUIREMENTS AND HOW THEY ARE MET |
| | WITHIN THE PROPOSED PUBLIC OPEN SPACES. |
| | |
| | L005 (GROUND LEVEL OPEN SPACE PLAN) OPEN SPACE 1A, 1B, |
| | 1C LABELED AS COURTYARD, THIS TYPE OF PUBLIC SPACE IS |
| | NOT PERMITTED IN TOD-25 DISTRICT. GARDEN COURTYARD |
| | CLASSIFICATION IS PERMITTED (TABLE IV-6). |
| | |
| | ACTIVE USE ABUTMENT FOR GARDEN COURTYARD IS 2 SIDES OR |
| | 75%. ROW ABUTMENT FOR GARDEN COURTYARD IS 1 SIDE OR |
| | 20%. |
| | |
| | OPEN SPACE 2A ON SHEET L005 (GROUND LEVEL OPEN SPACE |
| | PLAN) IS INCORRECTLY LABELED AS INTERIOR COURTYARD, |
| | THIS IS A PRIVATE OPEN SPACE CLASSIFICATION AND IS NOT |
| | PERMITTED WITHIN TOD-25 SUBDISTRICT. PLEASE IDENTIFY |
| | THE CORRECT TYPE OF PUBLIC OPEN SPACE THIS IS. NOTE |
| | PUBLIC OPEN SPACES ARE TO BE ON THE GROUND LEVEL, WILL |
| | REQUIRE VARIANCE/WAIVER FROM THE DAC. |
| | |
| | OPEN SPACE 4A ON SHEET L005 (GROUND LEVEL OPEN SPACE |
| | PLAN) DOES NOT MEET THE ACTIVE USE ABUTMENT REQUIRED (1 |
| | SIDE OR 20%). |
| | |
| | OPEN SPACE 4A AND 4B ON SHEET L005 (GROUND LEVEL OPEN |
| | SPACE PLAN) TERRACE VEGETATED AREA REQUIREMENT IS 20% |
| | (OKAY TO EXCEED REQUIREMENT, PLEASE ADJUST TABLE TO |
| | CORRECTLY REFLECT REQUIREMENTS) |
| | |
| | OPEN SPACE 4A AND 4B ON SHEET L005 (GROUND LEVEL OPEN |
| | SPACE PLAN) SHOULD BE LABELED AS THE REQUIRED ROOFTOP |
| | GARDEN. MINIMUM REQUIREMENTS INCLUDE 50% VEGETATED AREA |
| | AND 50% TREE CANOPY. |
| | |
| | STAFF IS UNABLE TO VERIFY COMPLIANCE UNTIL THE OPEN |
| | SPACES HAVE BEEN CORRECTLY DESIGNATED/IDENTIFIED AND |
| | PROPER REQUIREMENTS LISTED. |
| | |
| | A. PROPOSED OPEN SPACE AT THE SOUTHERN TRIANGLE OF THE |
| | SITE DOES NOT MEET PUBLIC OR PRIVATE OPEN SPACE |
| | TYPOLOGY DUE TO LACK OF ABUTMENT TO AN ACTIVE USE. |
| | [THIS IS A BONUS OPEN SPACE DESIGNED TO SERVE THE SFRTA |
| | AND ITC CUSTOMERS DURING OPERATING HOURS. THIS AREA |
| | ABUTS THE ACTIVE MASS TRANSIT USE TRAIN PLATFORM AND |
| | ITC FACILITY AND PROVIDES A SPACE FOR CUSTOMERS TO |
| | RELAX IN THE SUNNY LANDSCAPE PARKLIKE AREA WHILE |
| | WAITING TO MAKE THEIR TRANSIT CONNECTIONS.] |
| | [NOT SATISFIED] |
| | PER SECTION 94-109 OPEN SPACE, PRIVATE - IF PRIVATE |
| | OPEN SPACE IS LOCATED ON THE GROUND FLOOR AND LOCATED |
| | ALONG THE LOT FRONTAGE, IT SHALL BE DESIGNED IN |
| | COMPLIANCE WITH THE PUBLIC OPEN SPACE REQUIREMENTS, AND |
| | IT SHALL BE ACCESSIBLE BY THE PUBLIC FOR PUBLIC USE. |
| | |
| | B. THE PUBLIC OPEN SPACE SHOWN ON THE SECOND LEVEL |
| | REQUIRES THE APPROVAL OF A VARIANCE, SIMILAR TO THE ONE |
| | APPROVED AS PART OF THE CURRENTLY APPROVED SITE PLAN. |
| | [SEE ABOVE] [ACKNOWLEDGED. THIS WOULD ALLOW THE SAME |
| | RAISED OPEN SPACE CONDITION TO OCCUR AS PREVIOUSLY |
| | APPROVED] |
| | [NOT SATISFIED] WILL REQUIRE VARIANCE/WAIVER FROM THE |
| | DAC. |
| | |
| | 15. STREET TREES: STREET TREES SHALL BE PLANTED AT 30 |
| | FT. INTERVALS ALONG EACH STREET FRONTAGE. CLEARWATER |
| | FRONTAGE SHOULD HAVE APPROX. 46 TREES AND BANYAN |
| | FRONTAGE APPROX. 13. [NOTED. STREET TREE CALCULATIONS |
| | HAVE BEEN UPDATED ACCORDINGLY.] |
| | [SATISFIED] |
| | |
| | 16. PROPOSED RESIDENTIAL DROP-OFF AND LOOP FOR |
| | RESIDENTIAL TOWER ON CLEARWATER IS OUTSIDE OF PROPERTY |
| | LINES AND ENCROACHES INTO CITY ROW. ADDITIONAL SMALLER |
| | DROP-OFF ADJACENT TO LOADING BAY/BACK-OF-HOUSE. WHY ARE |
| | THESE DROP-OFF SPACES NEEDED FOR THE RESIDENTIAL TOWER? |
| | ADJACENT HOTEL/OFFICE ALSO INCLUDES A SMALL DROP-OFF, |
| | PRESENTS STACKING/QUEUING ISSUES AND SPILL OVER INTO |
| | CLEARWATER. STAFF DOES NOT SUPPORT THE RESIDENTIAL |
| | DROP-OFF ROAD ADJACENT TO RESIDENTIAL TOWER/CLEARWATER |
| | PROPOSED RESIDENTIAL DROP-OFF NOT IN COMPLIANCE. |
| | ENCROACHES INTO THE PUBLIC RIGHT-OF-WAY AND PER SEC. |
| | 94-111 (N.)(3.) DESIGNATED PASSENGER LOADING AND |
| | DROP-OFF AREAS SHALL BE SET BACK A MINIMUM OF 16 FEET |
| | FROM THE BACK OF CURB, SHALL BE SEPARATED FROM THE |
| | SIDEWALK BY A 5-FOOT-WIDE LANDSCAPE BUFFER AND SHALL BE |
| | SUBJECT TO APPROVAL BY THE CITY TRAFFIC ENGINEER. PORTE |
| | COCHERES ARE SUBJECT TO MINIMUM STANDARDS DEPENDING ON |
| | SUBDISTRICT LOCATION AND ADJACENCY TO A STREET |
| | DESIGNATION AND ARE SEPARATED INTO TWO TYPES WHICH ARE |
| | ILLUSTRATED IN FIGURE IV-22. ONLY A TYPE A PORTE |
| | COCHERE IS ALLOWED IN THE TOD-25 SUBDISTRICT. [THIS |
| | DROP OFF LOOP FEATURE HAS BEEN REVISED AND APPROVED BY |
| | PBC SO THAT IT IS NO LONGER WITHIN THE RIGHT OF WAY AND |
| | ALSO TO ADD EXTRA SPACING FOR A VEGETATED BUFFER AND |
| | DROP OFF RELATED USES.] |
| | THANK YOU FOR CONSIDERATIONS AND REVISIONS FROM THE |
| | PREVIOUS SUBMITTAL, BASED UPON THE NEW PLANS PROVIDED: |
| | |
| | STAFF DOES NOT SUPPORT THE RESIDENTIAL DROP-OFF FOR THE |
| | MIDDLE RESIDENTIAL TOWER ALONG CLEARWATER. PROPOSED |
| | SEPARATE DROP-OFF ROADWAY DOES NOT MAKE SENSE |
| | OPERATIONALLY AND DOES NOT REFLECT A SAFE/PLEASANT |
| | PEDESTRIAN ENVIRONMENT OR BUILT UP URBAN CONTEXT. |
| | CREATES A VEHICULAR-FOCUSED SPACE WITH NARROW LANDSCAPE |
| | BUFFER, PEDESTRIANS ARE BOUNDED BY 2 TRAVEL LANES. |
| | BUILDING WOULD BE BETTER ORIENTED CLOSER TOWARD |
| | CLEARWATER DR. ACTIVATING THE FRONTAGE, WITH THE |
| | DROP-OFF LOCATED AT THE REAR OF THE BUILDING, IN PLACE |
| | OF OR ALONG THE PROPOSED LOADING AREA. PROVIDES THE |
| | MOST DIRECT ROUTE INTO THE GARAGE FOR VALET SERVICES |
| | AND AVOIDS ADDITIONAL CIRCULATION. NEW CONFIGURATION |
| | WITH REVERSAL IN DIRECTION NOT EFFICIENT OR OPTIMAL. |
| | A TYPE A PORTE-COCHERE OFF CLEARWATER IS MORE |
| | COMPATIBLE AND APPROPRIATE FOR THIS SPACE, IF A |
| | DROP-OFF IS NEEDED ALONG THE RESIDENTIAL FRONTAGE. |
| | SIMILAR TO EXISTING ITC DROP-OFF IN FRONT OF |
| | HOTEL/OFFICE. |
| | |
| | A. INSTEAD, THE BUILDING FRONT SHOULD BE MOVED CLOSER |
| | TO CLEARWATER, AND RECONFIGURE LOADING AND |
| | BACK-OF-HOUSE TO INCLUDE THE DRIVEWAY AND DROP OFF |
| | AREA. [SEE ABOVE COMMENT.] [REPEAT COMMENT] SEE ABOVE |
| | |
| | B. SEE ABOVE: PROPOSED LOADING SPACE ON RESIDENTIAL |
| | TOWER DOES NOT FUNCTION FOR VEHICULAR MOVEMENT. |
| | [LOADING AREA WAS REVISED TO PROVIDE IMPROVED LOADING |
| | VEHICLE ACCESSIBILITY. SEE SHEET C-03] [NOT SATISFIED] |
| | PLEASE PROVIDE DIMENSIONS OF THE REVISED LOADING |
| | SPACES, ADA SPACE PROPOSED INBETWEEN LOADING |
| | OPERATIONS? |
| | |
| | WHAT IS THE DISTANCE BETWEEN THE INTERSECTION OF |
| | CLEARWATER TO THE REVISED HOTEL/OFFICE DROP-OFF LOADING |
| | SPACE? |
| | |
| | 17. ITC BUS LOOP IS NOW ENTIRELY COVERED OVERHEAD BY |
| | PLAZA AND BUILDINGS/STRUCTURES. PREVIOUS DESIGN HAD AN |
| | OPEN-AIR CORRIDOR TO PROVIDE LIGHT, LANDSCAPING, AND |
| | VENTILATION/OPEN-AIR ACCESS. HOW WILL THE REMOVAL OF |
| | THESE ELEMENTS BE MITIGATED OR COMPENSATED FOR, |
| | ESPECIALLY WHERE ANY MECHANICAL VENTING WILL BE |
| | LOCATED? [THE ITC IS NOW COMPLETELY ENCLOSED UNDER AND |
| | WITHIN THE PARKING STRUCTURE. A NEW LANDSCAPED OPEN |
| | SPACE IS PROVIDED ADJACENT TO THE SOUTH END OF THE ITC. |
| | THIS AREA IS ACCESSIBLE TO TRANSIT PATRONS SO THEY CAN |
| | GET SUN OR SIT IN SHADE WITHIN A LANDSCAPE AREA WHILE |
| | WAITING FOR THEIR TRANSIT CONNECTION] |
| | [PARTIALLY SATISFIED] NOTE, PER SECTION 94-109 OPEN |
| | SPACE, PRIVATE - IF PRIVATE OPEN SPACE IS LOCATED ON |
| | THE GROUND FLOOR AND LOCATED ALONG THE LOT FRONTAGE, IT |
| | SHALL BE DESIGNED IN COMPLIANCE WITH THE PUBLIC OPEN |
| | SPACE REQUIREMENTS, AND IT SHALL BE ACCESSIBLE BY THE |
| | PUBLIC FOR PUBLIC USE. |
| | |
| | 18. PLEASE PROVIDE SHEETS AND DRAWINGS IDENTIFYING HOW |
| | THE FA?ADE ARTICULATION REQUIREMENTS ARE MET FOR THE |
| | PROJECT. PLEASE REFERENCE SEC. 94-109 AND TABLE IV-4: |
| | FA?ADE ARCHITECTURAL REQUIREMENTS. [PLANAR BREAKS AND |
| | BUILDING LENGTH DIAGRAMS ARE PROVIDED] |
| | [PARTIALLY SATISFIED] DIAGRAMS ARE PROVIDED |
| | A. ILLUSTRATE TRANSPARENCY CALCULATIONS, FENESTRATION |
| | CALCULATIONS, PLANAR BREAK CALCULATIONS, PROJECTIONS, |
| | ETC. FOR ALL BUILDING FACADES. [TRANSPARENCY, |
| | FENESTRATION, PLANAR BREAK CALCULATIONS, FOR ALL |
| | BUILDING FACADES PROVIDED.] |
| | [NOT SATISFIED] FOR GROUND FLOOR TO PODIUM (UP TO 7TH |
| | FLOOR IN TOD-25 DISTRICT) |
| | |
| | SHEET A5-05, A5-06, BALCONIES FOR THE RESIDENTIAL |
| | BUILDINGS DO NOT CONSTITUTE AS PLANAR BREAKS, AS THESE |
| | ARE JUST ?PUNCH OUTS? ALONG THE SAME BUILDING FACE. |
| | PORTIONS OF THE FA?ADE ITSELF NEEDS TO BE RECESSED OR |
| | PROTRUDE TO A DEPTH OF AT LEAST 3FT. |
| | |
| | SHEET A-5-07 SATISFIES PLANAR BREAK REQUIREMENTS. |
| | |
| | PLEASE PROVIDE MORE DETAIL FOR THE GARAGE SCREENING. IS |
| | THE GREEN-WALL LIVING PLANT MATERIAL; IF SO WHAT KIND |
| | OF PLANTS ARE PROVIDED/HOW IS THIS |
| | MAINTAINED/IRRIGATED? ARE THE GREEN-WALL SECTIONS |
| | RECESSED FROM THE METAL SCREENING? |
| | |
| | TRANSPARENCY REQUIREMENTS APPEAR TO BE MET BASED UPON |
| | ELEVATIONS PROVIDED. PLEASE PROVIDE CALCULATIONS WITHIN |
| | TABLE OR ON DRAWINGS. |
| | |
| | |
| | 19. PLEASE PROVIDE DETAILS AND MATERIALS OF THE GARAGE |
| | STRUCTURE, HOW IS IT BEING SCREENED, MATERIALS, PLANTS, |
| | ETC. [GENERAL SPECIFICATION FOR GARAGE FACADE SCREENING |
| | MATERIALS ADDED TO ELEVATIONS] |
| | PLEASE PROVIDE MORE DETAIL FOR THE GARAGE SCREENING. IS |
| | THE GREEN-WALL LIVING PLANT MATERIAL; IF SO WHAT KIND |
| | OF PLANTS ARE PROVIDED/HOW IS THIS |
| | MAINTAINED/IRRIGATED? ARE THE GREEN-WALL SECTIONS |
| | RECESSED FROM THE METAL SCREENING? ARE THERE OTHER |
| | RECESSED PORTIONS/PLANAR BREAKS WITHIN THE SCREENING TO |
| | BREAK UP THE MASS? PLEASE PROVIDE MORE DETAIL INTO |
| | SCREENING GRAPHIC, COLOR, & TREATMENT. |
| | |
| | 20. REGARDING THE ARCHITECTURAL DESIGN OF THE TOWERS, |
| | HAS VARIED FACADES AND ELEMENTS BEEN EXPLORED OR IS |
| | THERE A REASON FOR UNVARIED/SIMILARLY DESIGNED TOWERS? |
| | [THE PROPOSED PROJECT DESIGN WAS CREATED AND EXECUTED |
| | PERSONALLY BY ARCHITECT BERNARDO FORT-BRESCIA OF |
| | ARQUITECTONICA. THE PROJECT DESIGN IS EXTREMELY WELL |
| | BALANCED WHILE REPRESENTING ARQ'S SIGNATURE MODERN |
| | STYLIZATION THROUGHOUT THE COHESIVE DESIGN] |
| | NOTED. PREVIOUS APPROVAL FOR TRANSIT VILLAGE HAD |
| | INCORPORATED FAR MORE VARIATION IN MASSING AND |
| | ARCHITECTURAL FEATURES THAT RESPECTED THE CONTEXT OF |
| | THE SURROUNDING BUILT ENVIRONMENT AND HISTORIC ELEMENTS |
| | ADJACENT TO THE SITE. |
| | |
| | - GARAGE SCREENING PRESENTS A STARK CONTRAST BETWEEN |
| | THE HISTORIC SEABOARD TRAIN STATION AND PRESENTS AN |
| | OPPORTUNITY TO EXPLORE ALTERNATIVE COLOR SCHEMES, |
| | SCREENING/MESH, GRAPHICS, RECESSES/PROTRUSIONS, ETC. |
| | WITHIN ITS DESIGN. THE GARAGE SCREENING SHOULD RESPECT |
| | OR PRESENT THESE SPACES IN A MORE COHESIVE MANNER. |
| | CURRENTLY THE TRAIN-STATION SITS IN FRONT OF A MASSIVE |
| | BLOCKY BACKDROP AND GETS LOST. |
| | - THE WATER TREATMENT FACILITY ON BANYAN IS ALSO AN |
| | HISTORIC SITE WITHIN THE SHADOW OF THE RESIDENTIAL |
| | TOWER. PREVIOUS APPROVAL FEATURED A ?STEP-BACK? OR |
| | ?STAIRCASE? MASSING TO LOWER THE SCALE TOWARD |
| | BANYAN/WATER TREATMENT FACILITY, AND THE TRAIN STATION |
| | ALONG TAMARIND. RECOMMEND PURSUING A SIMILAR CONCEPT TO |
| | BETTER SCALE AND FRAME THE MASSINGS. |
| | - REGARDING THE HOTEL/OFFICE TOWER, PREVIOUS APPROVAL |
| | PROVIDED ADDITIONAL SPACING AND STEPPED BACK FURTHER |
| | FROM THE SEABOARD TRAIN STATION, PROVIDING A MORE |
| | APPROPRIATELY SCALED PEDESTRIAN ENVIRONMENT THAT DIDN?T |
| | OVERSHADOW THE HISTORIC BUILDING BELOW. ADDITIONALLY, |
| | THE BLUE FA?ADE TREATMENT OR PAINTING IS ANOTHER STARK |
| | CONTRAST TO THE TRAIN STATION, PLEASE EXPLORE MORE |
| | COMPATIBLE COLOR SCHEMES (E.G. EARTH TONES) |
| | |
| | 21. REGARDING THE TOWERS AND OVERALL PROJECT HEIGHT, |
| | STAFF REQUESTS THAT THE BANYAN RESIDENTIAL TOWER IS THE |
| | TALLEST RATHER THAN THE CLEARWATER HOTEL/OFFICE TOWER. |
| | THIS IS BECAUSE BANYAN IS THE WIDEST ROADWAY AND IS |
| | MORE APPROPRIATELY FRAMED/CAN ACCOMMODATE THE TALLER |
| | MASS. ADDITIONALLY, STAFF RECOMMENDS THAT THE BANYAN |
| | RESIDENTIAL TOWER STEPS DOWN IN SOME CAPACITY TOWARD |
| | TAMARIND AVE. AS WAS APPROVED WITHIN THE ORIGINAL SITE |
| | PLAN. THIS GIVES RESPECT TO THE SCALE OF THE SEABOARD |
| | TRAIN STATION AND PUBLIC REALM ALONG TAMARIND. |
| | [ACKNOWLEDGED BUT WE DO NOT AGREE WITH THE PROPOSED |
| | DESIGN SUGGESTIONS] |
| | SEE PREVIOUS COMMENT |
| | |
| | 22. BE COGNIZANT THAT THE EDGE 2 BUILDING LOCATED AT |
| | 300 CLEARWATER IS APPROVED AND UNDERGOING BUILDING |
| | PERMITTING PROCESS, THIS PROJECT?S INGRESS/EGRESS FROM |
| | DRIVES MAY PRESENT CONFLICT POINTS. THE GROUND LEVEL |
| | PLANS NEED TO SHOW THE EDGE 2 CURB CUTS IN ORDER FOR |
| | STAFF TO EVALUATE THE IMPACT OF THE ACCESS POINTS TO |
| | CLEARWATER. ADDITIONALLY, THE PEDESTRIAN CONNECTION |
| | FROM THE ?OASIS? PARK ELEMENT ACROSS CLEARWATER TO THE |
| | STAIRWELL/ELEVATOR FOR THE UPPER PLAZA WILL NEED |
| | RECONSIDERATION WITH THE INCOMING DEVELOPMENT. [WE WILL |
| | COORDINATE PROJECT FEATURES AS NEEDED] |
| | [PARTIALLY SATISFIED] THANK YOU FOR OVERLAYING PORTIONS |
| | OF THE ADJACENT PROPERTIES/ROW CONTEXT. THE CURB CUTS |
| | FOR EDGE 2 BUILDING ACROSS FROM SITE NEED TO BE REVISED |
| | AND REALIGNED TO ACCURATELY REFLECT CONDITIONS. |
| | |
| | 23. PLEASE CLARIFY GROUND FLOOR PEDESTRIAN CIRCULATION |
| | WITH ITC, ACCESSING UPPER PLAZA SPACES, AND INTERNAL |
| | CIRCULATION BETWEEN RETAIL AND RESIDENTIAL TOWERS. IS |
| | THE ITC BUS LOOP SEPARATED/CLOSED OFF IN THE EVENINGS |
| | WHEN BUS OPERATIONS HALT, HOW IS WAYFINDING ADDRESSED |
| | TO ACCESS THE UPPER PLAZA SPACES? [PATRONS WILL BE |
| | QUEUED BY FENCING, GATES, LIGHTING, AND WAY FINDING |
| | SIGNAGE] |
| | |
| | [NOT SATISFIED] IS THE INTENTION FOR GENERAL PUBLIC TO |
| | ACCESS REST OF SITE/RETAIL VIA ELEVATORS THROUGH THE |
| | RESIDENTIAL TOWERS? |
| | |
| | REPEAT COMMENT PORTION OF (9.J.IV.A.) PLEASE PROVIDE |
| | CLARIFICATION OF HOW GENERAL PUBLIC/USERS OF OFFICE, |
| | HOTEL, RETAIL, AND TRI-RAIL USERS WILL EFFICIENTLY |
| | ACCESS THESE FACILITIES FROM THE GARAGE. |
| | |
| | DRAWINGS INDICATE THAT THE CROSS-WALK FROM THE SOUTHERN |
| | SIDE OF THE HOTEL/OFFICE TOWER STILL EXISTS/WILL |
| | REMAIN. PLEASE ADJUST PLANS/DRAWINGS ACCORDINGLY. |
| | PLEASE PROVIDE JUSTIFICATION/CLARIFICATION OF WHY THIS |
| | CROSSWALK IS BEING REMOVED. |
| | |
| | PLEASE PROVIDE ELEVATIONS/RENDERS OF THE PROPOSED |
| | SPIRAL STAIRCASE/ELEVATOR ON CLEARWATER DR. FOR THE |
| | UPPER PLAZA. PUBLIC ACCESS TO UPPER PLAZA FROM THIS |
| | STAIRCASE IS NOT OBVIOUS; PLEASE PROVIDE ADDITIONAL |
| | CONTEXT DISPLAYING THIS ENTRANCE. |
| | |
| | STAFF SUGGESTS AN ADDITIONAL STAIRWELL OR ACCESS POINT |
| | FROM THE SOUTHERN END OF THE OFFICE/HOTEL TOWER FROM |
| | THE DECK/PLAZA TO PROVIDE ADDITIONAL CIRCULATION |
| | BETWEEN ITC/SFRTA AND UPPER PLAZA. |
| | |
| | A. THE ITC ADA PATH DRAWING SUBMITTED WITH THE |
| | APPLICATION SHOWS THE ADA ROUTE UTILIZING A CROSSWALK |
| | THAT IS DESIGNATED FOR REMOVAL. [THIS ADA PATHWAY AND |
| | CROSSWALK WILL BE REMOVED PURSUANT TO THE COUNTY |
| | REQUEST TO REMOVE THEM.] |
| | [NOT SATISFIED] DRAWINGS INDICATE THAT THE CROSS-WALK |
| | FROM THE SOUTHERN SIDE OF THE HOTEL/OFFICE TOWER STILL |
| | EXISTS/WILL REMAIN. PLEASE ADJUST PLANS/DRAWINGS |
| | ACCORDINGLY. PLEASE PROVIDE JUSTIFICATION/CLARIFICATION |
| | OF WHY THIS CROSSWALK IS BEING REMOVED. |
| | |
| | B. THE ITC FENCE EXHIBIT SHOWS THE FENCE AROUND THE |
| | OPEN SPACE AT THE SOUTH END OF THE SITE AS A ?PRIVATE |
| | PARK FENCE?. THIS DOES NOT MATCH THIS AS BEING DEPICTED |
| | AS PUBLIC OPEN SPACE ON OTHER PLANS. [THIS IS A BONUS |
| | OPEN SPACE AREA DESIGNED TO BE OPERATED IN CONJUNCTION |
| | WITH THE SFRTA PLATFORM AND ITC OPERATION. THIS AREA |
| | WILL BE CLOSED TO PUBLIC ACCESS WHEN THE ITC IS CLOSED] |
| | [NOT SATISFIED] |
| | PER SECTION 94-109 OPEN SPACE, PRIVATE - IF PRIVATE |
| | OPEN SPACE IS LOCATED ON THE GROUND FLOOR AND LOCATED |
| | ALONG THE LOT FRONTAGE, IT SHALL BE DESIGNED IN |
| | COMPLIANCE WITH THE PUBLIC OPEN SPACE REQUIREMENTS, AND |
| | IT SHALL BE ACCESSIBLE BY THE PUBLIC FOR PUBLIC USE. |
| | |
| | 24. STAFF WILL BE RECOMMENDING PEDESTRIAN IMPROVEMENTS |
| | AND INCREASED ACCESSIBILITY TO TAMARIND AND THE |
| | DOWNTOWN AREA. AS A TOD PROJECT, YOU MUST DEMONSTRATE |
| | HOW THE RELATION AND CONNECTIVITY IS IMPROVED TO THESE |
| | CORRIDORS INTO THE DOWNTOWN. RECOMMEND POTENTIAL: WORK |
| | WITH SFRTA TO IMPLEMENT AT-GRADE CONNECTION(S) ACROSS |
| | RAILS TO TAMARIND. IMPROVE THE PEDESTRIAN BRIDGE |
| | CONNECTING SEABOARD TRAIN STATION AND TRANSIT VILLAGE |
| | PROJECT. EXPLORE CONCEPT OF ADDITIONAL PEDESTRIAN |
| | BRIDGES OR CONNECTIONS. [THE REVISED PROJECT DESIGN |
| | PROVIDES ACCESSIBILITY TO THE GARAGE, RETAIL, BIKE |
| | STORAGE, ITC AND RAIL FACILITIES FROM BOTH BANYAN |
| | BOULEVARD AND CLEARWATER DRIVE. THESE ACCESS POINTS ARE |
| | PROVIDED UNDER COVERED WALKWAYS AND THEY HAVE ACTIVE |
| | USES PROVIDED ALONG THEIR FRONTAGES. THE NEW ACCESS |
| | POINT FROM BANYAN ALONG THE WEST SIDE OF THE TRACKS NOW |
| | PROVIDES A DIRECT ROUTE BACK TOWARD BANYAN BOULEVARD] |
| | [NOT SATISFIED] PLEASE CLARIFY OR MARK ON PLANS THE NEW |
| | ACCESS POINT FROM BANYAN. NOT UNDERSTANDING THE |
| | INCREASED ACCESSIBILITY AND PEDESTRIAN IMPROVEMENT |
| | DESCRIBED. ADDITIONALLY STAFF RECOMMENDS AN ADDITIONAL |
| | STAIRWELL OR ACCESS POINT FROM THE SOUTHERN END OF THE |
| | OFFICE/HOTEL TOWER FROM THE DECK/PLAZA TO PROVIDE |
| | ADDITIONAL CIRCULATION BETWEEN ITC/SFRTA AND UPPER |
| | PLAZA. |
| | |
| | 25. PLEASE PROVIDE INFORMATION ON WHAT THE ?MOTOR |
| | LOBBY? IS. [IT IS SMALL LOBBY FOR THE OFFICE AND HOTEL |
| | AT THE GROUND LEVEL INTENDED TO PROVIDE GROUND FLOOR |
| | ACCESS TO VEHICLES PICKING UP AND DROPPING OFF PATRONS, |
| | MAIL PACKAGES, LUGGAGE, ETC.] [SATISFIED] |
| | |
| | 26. THE SOUTH RESIDENTIAL BUILDING IS NOT PERMITTED TO |
| | ENCROACH THE 20-FOOT FIRE DEPARTMENT ACCESS EASEMENT. |
| | NOTE: EVEN WITHOUT THE BUILDING ENCROACHMENT, THIS DOES |
| | NOT FUNCTION. [THIS FIRE ACCESS IS NOT REQUIRED AND IS |
| | PROPOSED TO BE REMOVED] |
| | |
| | [NOT SATISFIED] PLEASE PROVIDE EVIDENCE OF EASEMENT |
| | REMOVAL AND FIRE DEPT. APPROVAL. |
| | |
| | 27. PROVIDE TURNING DIAGRAMS FOR THE LOADING AREAS |
| | UNDER THE NORTH BUILDING, ENTRY POINTS TO THE SITE AND |
| | THE OTHER LOADING AREAS. [AUTO TURN EXHIBITS PROVIDED] |
| | BASED UPON THE AUTOTURNS PROVIDED: |
| | [NOT SATISFIED] PLEASE PROVIDE JUSTIFICATION FOR DOUBLE |
| | INGRESS RAMP AND DOUBLE EGRESS RAMP. |
| | |
| | GROUND LEVEL LOADING BAYS AND OPERATION CREATES CLEAR |
| | CONFLICT POINTS AND IS A TRAFFIC/SAFETY HAZARD WITH |
| | INGRESS/EGRESS OF PATRONS TO THE UPPER LEVELS OF THE |
| | GARAGE AND GROUND LEVEL ADA ACCESS. QUEUING AND |
| | SPILLBACK IS AN INEVITABILITY DURING OPERATIONAL HOURS. |
| | |
| | AUTOTURN FOR DELIVERIES POSES CONFLICT POINTS WITH ADA |
| | AND OTHER OPERATIONS INTERSECTS WITH DOWNWARD RAMP. |
| | |
| | INTERNAL GARAGE CIRCULATION ALTERNATING ACROSS LEVELS |
| | WITH ONE-WAY/TWO-WAY AISLES POSES CONCERNS. |
| | |
| | IS THE INTENTION FOR GENERAL PUBLIC TO ACCESS REST OF |
| | SITE/RETAIL VIA ELEVATORS THROUGH THE RESIDENTIAL |
| | TOWERS? |
| | |
| | REPEAT COMMENT PORTION OF (9.J.IV.A.) PLEASE PROVIDE |
| | CLARIFICATION OF HOW GENERAL PUBLIC/USERS OF OFFICE, |
| | HOTEL, RETAIL, AND TRI-RAIL USERS WILL EFFICIENTLY |
| | ACCESS THESE FACILITIES FROM THE GARAGE. |
| | |
| | PLEASE PROVIDE DIMENSIONS FOR LOADING BAY ON THE GROUND |
| | FLOOR |
| | |
| | SHEET C-19 SHOWS ARROW IN OPPOSITE DIRECTION OF |
| | RESIDENTIAL DROP-OFF TRAFFIC FLOW |
| | |
| | 28. WHERE ARE THE GENERATORS, TRANSFORMERS, AND OTHER |
| | MECHANICAL EQUIPMENT AND HOW ARE THEY SCREENED IN |
| | ACCORDANCE WITH CITY CODE REQUIREMENTS? [LABELED ON |
| | PLANS] [NOT SATISFIED] |
| | SHEET C-05 & C-04 SHOW FDC IN WITHIN THE MIDDLE OF BIKE |
| | RACKS, OR EXPOSED WITHIN ROW. |
| | |
| | PLEASE WALL-MOUNT ANY WATER METERS, FIRE/CHECK/CONTROL |
| | VALVES, ETC. WHENEVER POSSIBLE. |
| | |
| | ANY EXPOSED MECHANICAL EQUIPMENT, METERS, OR VALVES |
| | SHALL BE SCREEENED FROM VIEW WITH LANDSCAPING. |
| | |
| | 29. PLEASE CONSIDER USING SUSTAINABLE INFRASTRUCTURE |
| | SUCH AS ROOFTOP SOLAR OR RAINWATER CAPTURE/REUSE |
| | CISTERNS. |
| | |
| | NO RESPONSE PROVIDED. WHILE NOT REQUIRED, HAS THIS ITEM |
| | BEEN GIVEN ANY CONSIDERATION? |
| | |
| | 30. SHEET A6-01 SHOWS PUBLIC OPEN SPACES EXTENDING INTO |
| | THE BUS LANE. [LANDSCAPE PLANS HAVE BEEN UPDATED |
| | REDUCING THE OPEN SPACES OUTSIDE OF THE BUS LANES.][ |
| | PLANS REVISED TO REMOVE SIDEWALK SERVING BUS LANE FROM |
| | THE OPEN SPACE] [SATISFIED] LANDSCAPE NO LONGER |
| | ENCROACHES/OVERLAPS |
| | |
| | 31. FOR THE EVENTUAL DOWNTOWN ACTION COMMITTEE (DAC) |
| | MEETING, PLEASE PROVIDE FULLY DETAILED RENDERINGS AND |
| | PERSPECTIVE DRAWINGS OF THE FINAL PROJECT. |
| | [ACKNOWLEDGED] |
| | |
| | [PARTIALLY SATISFIED] PLEASE NOTE, ALL PROVIDED |
| | RENDERINGS ARE ONLY OF THE TAMARIND AND BANYAN |
| | PERSPECTIVES. THERE ARE NO RENDERS SHOWN FOR CONDITIONS |
| | ALONG CLEARWATER DR. |
| | |
| | PLEASE PROVIDE DETAILS/RENDERS OF THE SPIRAL |
| | STAIRCASE/ELEVATOR SHAFT USED TO ACCESS THE UPPER |
| | PUBLIC OPEN SPACE/PLAZA. |
| | |
| | 32. PROVIDE A PRELIMINARY CONSTRUCTION PLAN TO SHOW HOW |
| | THE SITE WILL BE DEVELOPED WHILE MAINTAINING ITC |
| | OPERATIONS, TO INCLUDE PARKING. ADDITIONALLY, PROVIDE |
| | THE PRELIMINARY PLAN FOR EMPLOYEE AND CONTRACTOR |
| | PARKING DURING CONSTRUCTION. [THIS IS A PERMITTING |
| | ISSUE THAT REQUIRES CONSIDERABLE COORDINATION AND WILL |
| | BE ADDRESSED PRIOR TO BUILDING PERMITS BEING ISSUED |
| | PLEASE CARRY FORWARD AS A CONDITION OF APPROVAL. NOTE |
| | THAT AS PART OF THE PSA, WE ARE REQUIRED TO PROVIDE THE |
| | COUNTY WITH A CONTINUOUS OPERATONS PLAN. THE PLAN IS TO |
| | RELOCATE PALM TRAN TO THE EAST SIDE OF THE TRACKS, AS |
| | IS UNDER DISCUSSION AMONG THE CITY, THE COUNTY AND |
| | APPLICANT.] |
| | [ACKNOWLEDGED] |
| | |
| | THERE ARE COLUMN LOCATIONS THAT WHEN COMBINED WITH THE |
| | LOCATION OF THE PROPOSED ITC FENCE CREATE CHOKE POINTS |
| | FOR THE BUS PATRONS AS THEY CHANGE BETWEEN ROUTES. |
| | WHILE THEY ALL APPEAR TO COMPLY WITH ADA MINIMUMS, THEY |
| | DO NOT PROVIDE COMFORTABLE PEDESTRIAN WIDTHS FOR TWO |
| | USERS TO PASS SIDE-BY-SIDE. PLEASE REVIEW. [IN GENERAL |
| | THE PLAN IS TO START CONSTRUCTION ON THE NON ITC |
| | NORTHERN PORTION UNTIL THE ITC IS RELOCATED TO THE |
| | TAMARIND SIDE THEN BUILD THE ITC PORTION] |
| | [ACKNOWLEDGED] |
| | |
| | 33. THE SITE, LANDSCAPE AND CIVIL PLANS ALL NEED TO |
| | SHOW CONSISTENT, CODE COMPLIANT CONDITIONS. [PLANS |
| | COORDINATED][NOT SATISFIED] ARCHITECTURAL, LANDSCAPE, |
| | AND CIVIL PLANS ALL FEATURE INCONSISTENCIES OR ELEMENTS |
| | NOT COMPLIANT WITH CODE, PLEASE REVISE. |
| | |
| | EXAMPLES INCLUDE: |
| | - BANYAN PEDESTRIAN DROP-OFF, WHICH IS NOT PERMITTED, |
| | IS STILL SHOWN ACROSS ALL PLANS. |
| | - CROSSWALK AT THE ENTRANCE OF ITC STILL SHOWN ON |
| | PLANS, BUT COMMENTS/REFERENCES STATE IT IS TO BE |
| | REMOVED. |
| | - ELEVATIONS FEATURE COLUMNS NOT PRESENT IN GROUND |
| | FLOOR PLANS. |
| | - ETC. |
| | |
| | 34. PROVIDE VERIFICATION THAT THE PROJECT MEETS THE |
| | STREETSCAPE REQUIREMENTS OF SECTION 94-113. THIS |
| | INCLUDES LIGHTING, SIDEWALK WIDTH, LANDSCAPE, BICYCLE |
| | PARKING, STREET FURNITURE, ETC. [NOTED][ THE PROJECT |
| | COMPLIES WITH STREETSCAPE REQUIREMENTS OF SECTION |
| | 94-113.] |
| | [NOT SATISFIED] PLEASE PROVIDE DIMENSIONS FOR SIDEWALK |
| | WIDTHS AND CLEAR PATHS, PLEASE PROVIDE A LOCATION |
| | CALLOUT, DIMENSIONS, AND COUNT OF BICYCLE RACKS |
| | PROVIDED FOR PUBLIC ACCESS (REQUIREMENT IS 1 SPACE PER |
| | 100 FT. OF STREET FRONTAGE). |
| | |
| | 35. PROVIDE COMPLIANCE WITH SEC. 94-106 ? GENERAL USES |
| | WITH SPECIAL REQUIREMENTS (8.A) MICRO-UNITS |
| | (A.-F.)[NOTES ADDED TO PLAN TO SHOW COMPLIANCE WITH |
| | MINIMUM AVERAGE AND OTHER DWELLING UNITS REQUIREMENTS] |
| | A. MICRO-UNIT MEANS A SMALL RESIDENTIAL UNIT WITH A |
| | TOTAL SQUARE FOOTAGE BETWEEN 300 SQUARE FEET AND 549 |
| | SQUARE FEET, WITH A FULLY FUNCTIONING KITCHEN AND |
| | BATHROOM. [REGULAR UNITS WILL COMPLY TO ALL REGULATIONS |
| | THERE ARE ALSO COMPLAINT MICRO UNITS THAT ARE LESSED |
| | OUT FORM THE REGULAR UNIT AVERAGE CALCULATION ] |
| | B. SEC. 94-109 ?DWELLING UNIT REQUIREMENTS |
| | VIII. DWELLING UNITS SHALL NOT BE LESS THAN 550 SQUARE |
| | FEET. IN MULTIPLE DWELLING UNIT BUILDINGS, THE |
| | CUMULATIVE AVERAGE OF ALL DWELLING UNITS SHALL NOT BE |
| | LESS THAN 800 SQUARE FEET. |
| | IX. SMALLER DWELLING UNITS MAY BE ALLOWED AS |
| | MICRO-UNITS. THE CUMULATIVE AVERAGE SIZE MINIMUM SHALL |
| | NOT BE APPLICABLE TO MULTIPLE DWELLING UNIT BUILDINGS |
| | WHERE MICRO-UNITS COMPOSE A MINIMUM OF 80 PERCENT OF |
| | THE TOTAL NUMBER OF UNITS. IN ALL OTHER CASES, THE |
| | CUMULATIVE AVERAGE SIZE OF ALL DWELLING UNITS SHALL NOT |
| | INCLUDE THE MICRO-UNITS IN SUCH CALCULATION. SEE |
| | MICRO-UNITS. [ACKNOWLEDGED] |
| | [NOT SATISFIED] PLEASE PROVIDE CLARIFICATION FOR THE |
| | PARKING PROVIDED FOR MICRO-UNITS, IF ITS 13 CAR-SHARE |
| | ALONE OR IF ITS 13 SPACES AND 13 CAR-SHARE (26 TOTAL). |
| | PLEASE PROVIDE FINAL COUNT AND LOCATION FOR THE |
| | REQUIRED 0.5 BIKE SPACES PER UNIT. |
| | |
| | PLEASE NOTE CONDITION OF APPROVAL FOR MICRO-UNITS WILL |
| | INVOLVE A CONTRIBUTION TO THE CITY TROLLEY FEE PER UNIT |
| | PER MONTH. |
| | |
| | |
| | ADDITIONAL COMMENTS BASED UPON RESUBMITTED DOCUMENTS, |
| | SHEETS, AND REVISED PLANS: 7/5/22 |
| | |
| | 1. REVISE LIST OF VARIANCES BASED UPON CORRECTIONS TO |
| | OPEN SPACE, CURBCUT WIDTHS, PLANAR BREAKS/FA?ADE |
| | ARTICULATION, ETC. ANY DEVIATION FROM REQUIRED MINIMUMS |
| | OR MAXIMUMS CONSTITUTES A REQUEST FOR VARIANCE. |
| | |
| | 2. FA?ADE ARTICULATION ? PLEASE PROVIDE MORE DETAILS |
| | FOR THE GARAGE SCREENING, GREEN-WALL, AND PLANAR |
| | BREAKS. |
| | |
| | 3. PLEASE PROVIDE ALL NECESSARY APPROVALS FROM FIRE |
| | DEPARTMENT, UTILITY PROVIDERS, FPL, ETC. FOR THE |
| | VACATING/MODIFICATION OF ANY EASEMENTS AND STRUCTURES. |
| | |
| | 4. ON SITE PLANS, THE CROSSWALK AT THE INTERSECTION OF |
| | CLEARWATER/BANYAN NOT REFLECTIVE OF EXISTING BANYAN |
| | STREETSCAPE, THERE ARE SEPARATE BIKELANE AND PEDESTRIAN |
| | CROSSING LANE |
| | |
| | 5. SHOW SETBACK LINES ON THE ELEVATIONS |
| | |
| | 6. PLEASE PROVIDE CIRCULATION DIAGRAM OR ILLUSTRATE ALL |
| | INTERIOR DOORS/ENTRYWAYS TO, FROM, AND BETWEEN ROOMS, |
| | ENCLOSURES, RETAIL SPACES, ETC. (GROUND FLOOR FOR |
| | EXAMPLE ONLY SHOWS DOORS TO TR, BIKE ROOM, AND |
| | EXTERNAL/FA?ADE ROOMS) HELPS CLARIFY INTERNAL |
| | CIRCULATION OF PATRONS. |
| | |
| | 7. PRIVATE OPEN SPACE ON GROUND FLOOR, REQUIRED TO BE |
| | DESIGNED TO MEET PUBLIC OPEN SPACE REQUIREMENTS. |
| | |
| | 8. MAXIMUM FOOTPRINT LENGTH EXCEEDS 350 FT. FOR TOD-25 |
| | WOULD REQUIRE VARIANCE. |
| | |
| | |
| | 9. PLEASE PROVIDE A PHOTOMETRIC PLAN, SITE ILLUMINATION |
| | MINIMUM REQUIREMENT IS 0.6 FOOTCANDLES AS MEASURED AT |
| | THE BACK EDGE OF THE CURB AND ONE FOOT ABOVE THE |
| | SIDEWALK. |
| | |
| | 10. PLEASE FULLY DIMENSION SITE PLANS AND DRAWINGS, OR |
| | PROVIDE SEPARATE SHEETS OF DIMENSIONED SITE PLANS AND |
| | DRAWINGS, VERY LITTLE SPATIAL INFORMATION IS PROVIDED |
| | WITHIN PLANS. |
| | |
| | SIDEWALK WIDTHS, CURB-CUTS, LANDSCAPE BEDS, PLANAR |
| | BREAK DEPTHS, FRONTAGES, SETBACKS, PROPERTY LINES, ETC. |
| | |
| | 11. BASED UPON THE RESUBMITTED DOCUMENTS AND REVISED |
| | DRAWINGS, THE EXISTING ON-STREET PARKING ALONG |
| | CLEARWATER DRIVE HAS BEEN REMOVED. THE REMOVAL OF |
| | METERED ON-STREET PARKING WILL INCUR A FEE. PLEASE |
| | CONTACT ED DAVIS FROM PARKING TO CLARIFY FEES |
| | ASSOCIATED WITH THESE SPACES. [email protected] |
| | |
| |