| 2022-05-12 13:09:43 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL: |
| | |
| | 1. DRAINAGE STRUCTURES, EXFILTRATION TRENCHES, ETC. ARE |
| | NOT TO CROSS THE PROPERTY LINE. |
| | |
| | 2. THE CITY DOES NOT ALLOW THE USE OF BLEEDERS WITH |
| | EXFILTRATION TRENCH SYSTEMS. |
| | |
| | 3. PLEASE PROVIDE CONVERSION EQUATION BETWEEN THE |
| | VERTICAL DATUM USED ON THE PLANS (NGVD1929) TO |
| | NAVD1988. |
| | |
| | 4. SHOW CURRENT LAYOUT OF BANYAN BLVD. |
| | |
| | 5. PROVIDE FLOW ARROWS SHOWING DIRECTION OF SURFACE |
| | RUNOFF. |
| | |
| | 6. PROVIDE CROSS SECTIONS FOR THE DRIVEWAYS (EXTEND TO |
| | HIGH POINT) AND ON-STREET PARKING AREAS SHOWING HOW |
| | PAVEMENT WITH SLOPE. PROVIDE DIMENSIONS FROM EDGE OF |
| | TRAVEL LANE TO ALL CURBING, BREAK POINTS AND RIGHT OF |
| | WAY LINE. |
| | |
| | 7. PROVIDE CROSS SECTIONS AT EACH PROPERTY LINE FROM |
| | CENTERLINE OF ROAD TO FACE OF BUILDING. PROVIDE |
| | DIMENSIONS TO SURFACE FEATURES AND BREAK POINTS IN |
| | SURFACE SLOPES. LABEL THE RIGHT OF WAY WITH THE STREET |
| | NAME. |
| | |
| | 8. DEMOLITION PLAN INDICATES THE CURB INLETS ON |
| | CLEARWATER DRIVE ARE TO REMAIN BUT THE PGD PLAN CALLS |
| | FOR THEM TO BE REMOVED. EXISTING STRUCTURES SHOULD NOT |
| | REMAIN IF THE EXISTING PIPE CAN BE EXTENDED TO THE NEW |
| | STRUCTURES. |
| | |
| | 9. BUILDINGS OVER EXFILTRATION TRENCHES SHOULD HAVE |
| | SUFFICIENT VERTICAL CLEARANCE BELOW THE BUILDING FOR |
| | MAINTENANCE EQUIPMENT FOR THE EXFILTRATION TRENCH AND |
| | FOR REPLACING THE EXFILTRATION TRENCH IN THE FUTURE |
| | WHEN IT NO LONGER IS FUNCTIONING AS INTENDED. |
| | |
| | 10. STREETS SHALL BE PROPERLY SHOWN ON THE PLAN VIEWS. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP |
| | CRITERIA. STORMWATER CALCULATIONS WILL BE REVIEWED WITH |
| | THE ENGINEERING PERMIT SUBMITTAL. |
| | |
| | 2. PROVIDE SPREAD CALCULATIONS FOR THE INLETS ON |
| | CLEARWATER DRIVE. |
| | |
| | 2. PROVIDE COPY OF SFWMD ERP PERMIT BEFORE START OF |
| | CONSTRUCTION. |
| | |
| | 3. PROVIDE EROSION CONTROL PLAN WITH THE ENGINEERING |
| | PERMIT SUBMITTAL. |
| | |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | 561-494-1120 (O) |
| | 561-351-0510 (M) |
| | [email protected] |
| | |
| |