| Plan Review Notes For Project Z22040014 |
| Project Number |
Z22040014 |
|
| Review Stop |
PU |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2022-05-11 15:25:20 | -NO ISSUES WITH THE CONCEPTUAL UTILITY PLAN. SOME | | | STANDARD COMMENTS HAVE BEEN ATTACHED BELOW: | | | -REVISE BANYAN ST TO BANYAN BLVD. | | | -SHOW ALL EXISTING UNDERGROUND UTILITIES WITHING CITY | | | ROW ( BANYAN AND CLEARWATER). CALL OUT SIZE/TYPE. | | | -CALL OUT THE EXISTING FM ON CLEARWATER DR AS 6? DIP. | | | -CALL OUT THE LOCATION OF THE CAP AND LOCATION OF THE | | | PROPOSED TAP ON THE 6? DIP FM. MAINTAIN A MIN. OF 10? | | | DISTANCE BETWEEN THE TWO. | | | -ADD NOTE FOR ALL EXISTING LATERALS: ?REHAB/REPLACE AS | | | REQUIRED? | | | -PROFILE OF SERVICE TAPS WILL BE NEEDED FOR ENGINEERING | | | SUBMITTAL AS WELL AS LEVEL OF SERVICE CALCS. SEE LIST | | | OF STANDARD COMMENTS. | | | |
| |
Print |
|