| Plan Review Notes For Project Z22030046 |
| Project Number |
Z22030046 |
|
| Review Stop |
STORM |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2022-05-12 12:45:45 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL | | | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION | | | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE | | | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT | | | APPLICATION PROCESSES. | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE | | | PLAN APPROVAL: | | | | | | 1. THE CITY?S OFFICIAL VERTICAL DATUM IS NGVD1929. THE | | | CITY HAS ALLOWED THE USE OF NAVD1988 AS LONG AS THE | | | CONVERSION EQUATION TO NGVD1929 AT THE PROJECT LOCATION | | | IS PROVIDED. PROVIDE VERTICAL DATUM REFERENCE AND | | | CONVERSION TO NGVD1929 ON EVERY SHEET WITH ELEVATION | | | INFORMATION. | | | | | | 2. REVISE DIMENSION SYMBOL USED ON THE CROSS SECTION | | | VIEW OF THE FRENCH DRAINAGE DETAIL. | | | | | | 3. SHOW UTILITIES ON THE LANDSCAPE PLAN. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | [email protected] | | | |
| |
Print |
|