2022-05-05 11:53:575/5/22 - FAILED
  
  
 PLEASE NOTE THE FOLLOWING PROCESS COMMENTS WHEN
 RESUBMITTING:
 A. WRITTEN RESPONSES TO COMMENTS MADE BY ALL
 DEPARTMENTS SHALL BE PROVIDED UPON RESUBMISSION.
 B. PROVIDE AN ELECTRONIC COPY OF ALL PLANS AND REQUIRED
 MATERIALS AND 2 SETS OF FOLDED PHYSICAL PLANS, ALONG
 WITH ONE (1) REDUCED COPY (11 IN X 17 IN).
 C. PLEASE NOTE THAT RE-SUBMITTALS MAY BE SUBJECT TO
 ADDITIONAL COMMENTS.
 D. IF NO RESPONSE IS RECEIVED WITHIN 60 DAYS OF THE
 ISSUANCE OF THESE COMMENTS, THE APPLICATION WILL BE
 CONSIDERED WITHDRAWN AND ANY FURTHER ACTION WILL
 REQUIRE SUBMISSION OF A NEW DEVELOPMENT APPLICATION.
 E. PLEASE NOTE THAT YOU ARE PERMITTED ONE (1)
 RESUBMITTAL AT NO ADDITIONAL COST. A RESUBMITTAL FEE OF
 20% OF THE ORIGINAL APPLICATION FEE WILL BE ASSESSED
 AFTER THE FIRST RESUBMITTAL.
  
 REQUIRED MATERIALS MUST BE PROVIDED:
 F. PLEASE PROVIDE LETTERS FROM ALL PUBLIC UTILITIES
 (FLORIDA POWER & LIGHT COMPANY, FLORIDA PUBLIC
 UTILITIES, AT&T TELECOMMUNICATION, COMCAST CABLE
 COMMUNICATIONS, CITY OF WEST PALM BEACH UTILITIES)
 CONFIRMING THAT THE PROPOSED PROJECT DOES NOT ENCROACH
 INTO THEIR EASEMENTS OR OTHERWISE INTERFERE WITH THE
 PROVISIONS OF THEIR SERVICES.
 G. PLEASE PROVIDE A TRAFFIC CONCURRENCY/PERFORMANCE
 STANDARD REVIEW (TPS) LETTER FROM THE PALM BEACH COUNTY
 TRAFFIC DIVISION FOR THE SUBJECT PROJECT.
 H. PLEASE PROVIDE REVISED PLANS ADDRESSING THE REVIEW
 COMMENTS BELOW.
 I. PLEASE PROVIDE/INDICATE/DEMONSTRATE CONSISTENT
 INFORMATION ON ALL THE DIFFERENT PLANS AND REQUIRED
 MATERIALS WITHIN THE APPLICATION PACKET RESUBMITTAL.
  
 PLANS REVIEW COMMENTS MUST BE ADDRESSED:
 1. PLEASE CORRECTLY IDENTIFY/INDICATE/DEMONSTRATE THE
 EXISTING PROPERTY LINE ON ALL THE DIFFERENT PLANS,
 ACCORDINGLY.
 2. PLEASE IDENTIFY/INDICATE THE PROPOSED USE(S) FOR
 BOTH ?PHASE 1? AND ?PHASE 2? IN THE SITE DATA TABLE ON
 THE SITE PLAN, SHEET # SP.1.
 3. IN ACCORDANCE WITH THE CITY?S ZONING AND LAND
 DEVELOPMENT REGULATIONS (ZLDR) SUBSECTION 94-35(C)(9),
 PLEASE IDENTIFY/INDICATE/DEMONSTRATE A CONNECTION
 BETWEEN THE EXISTING PUBLIC SIDEWALK AND THE PROPOSED
 ON-SITE PRIVATE SIDEWALK ON ALL THE DIFFERENT PLANS,
 ACCORDINGLY.
 4. PLEASE IDENTIFY/INDICATE/DEMONSTRATE A
 SINGLE/PEDESTRIAN GATE OR OPENING IN THE PROPOSED ?6?
 HT. BLACK CHAIN LINK FENCE? FOR THE SIDEWALK CONNECTION
 ON ALL THE DIFFERENT PLANS, ACCORDINGLY.
 5. PLEASE IDENTIFY/INDICATE/DEMONSTRATE THE LOCATION,
 HEIGHT, AND INTENSITY OF ALL OUTDOOR ILLUMINATION ON
 ALL THE DIFFERENT PLANS, ACCORDINGLY.
 6. PLEASE IDENTIFY/INDICATE/DEMONSTRATE THE LOCATION OF
 EXISTING AND PROPOSED FIRE HYDRANTS (OR OPERATIONAL
 EQUIVALENTS) WITHIN 250 FEET OF THE PROPOSED
 STRUCTURE(S) ON THE SITE PLAN, SHEET # SP.1.
 7. THE APPROVED SITE PLAN
 IDENTIFIES/INDICATES/DEMONSTRATES A ?FPL TRANSFORMER W/
 10? X 15? EASEMENT?. THEREFORE, PLEASE
 IDENTIFY/INDICATE/DEMONSTRATE THE LOCATION OF THE
 PROPOSED ?FPL TRANSFORMER W/ 10? X 15? EASEMENT? ON ALL
 THE DIFFERENT PLANS, ACCORDINGLY.
 8. PLEASE CORRECT THE ?TOTAL SITE AREA? CALCULATION (BY
 PROVIDING THE AREA CALCULATIONS FOR THE ENTIRE SITE AND
 BOTH PHASES SEPARATELY) IN THE ?SITE DATA? TABLE ON THE
 SITE PLAN, SHEET # SP.1.
 9. PLEASE CORRECT THE ?MAX. IMPERVIOUS AREA? AND
 ?PROPOSED IMPERVIOUS AREA? CALCULATIONS (BY PROVIDING
 THE IMPERVIOUS AREA CALCULATIONS FOR THE ENTIRE SITE
 AND BOTH PHASES SEPARATELY) IN THE ?SITE DATA? TABLE ON
 THE SITE PLAN, SHEET # SP.1.
 10. PLEASE CORRECT THE ?PROPOSED BUILDING COVERAGE?
 CALCULATION (BY PROVIDING THE BUILDING COVERAGE
 CALCULATIONS FOR THE ENTIRE SITE AND BOTH PHASES
 SEPARATELY) IN THE ?SITE DATA? TABLE ON THE SITE PLAN,
 SHEET # SP.1.
 11. PLEASE CORRECT THE ?PROPOSED BUILDING FAR?
 CALCULATION (BY PROVIDING THE FLOOR AREA RATIO
 CALCULATION FOR THE ENTIRE SITE AND BOTH PHASES
 SEPARATELY) IN THE ?SITE DATA? TABLE ON THE SITE PLAN,
 SHEET # SP.1. THE PROPOSED 756 SQUARE FOOT ?COVERED
 PATIO? AREA SHALL NOT BE INCLUDED IN THE FLOOR AREA
 RATIO CALCULATION.
 12. PLEASE CORRECT THE ?REQUIRED OPEN SPACE? AND
 ?PROPOSED OPEN SPACE? CALCULATIONS (BY PROVIDING THE
 OPEN SPACE CALCULATIONS FOR THE ENTIRE SITE AND BOTH
 PHASES SEPARATELY) IN THE ?SITE DATA? TABLE ON THE SITE
 PLAN, SHEET # SP.1.
 13. PLEASE CORRECT THE ?REQUIRED PARKING? CALCULATION
 IN THE ?SITE DATA? TABLE ON THE SITE PLAN, SHEET #
 SP.1. THE MINIMUM PARKING REQUIREMENT FOR THE PROPOSED
 USE OF ?RESTAURANTS SERVING A LIMITED CLIENTELE
 (PRIVATE CLUBS AND LODGES)? IS 1 SPACE PER 200 GROSS
 SQUARE FEET (THE PROPOSED GROSS SQUARE FOOTAGE
 INDICATED IS 3,264 SQUARE FEET).
 14. PLEASE CORRECT THE ?REQUIRED VEHICULAR LANDSCAPE
 AREA? CALCULATIONS (FROM ?209.6 SF? TO 209.7 SF AND
 FROM ?499.6 TOTAL SF? TO 499.7 TOTAL SF) IN THE ?SITE
 DATA? TABLE ON THE SITE PLAN, SHEET # SP.1.
  
  
 KEVIE DEFRANC
 PLANNER - PLANNING DIVISION
 [email protected]
 561-822-1449
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved