Plan Review Notes
Plan Review Notes For Project Z22030025
Project Number Z22030025
Review Stop TRAFFIC
Sequence Number 3
Notes
Date Text
2022-09-06 11:25:37NO FURTHER COMMENTS.
  
 1) SATISFIED. PROVIDE A REVISED TRAFFIC ANALYSIS
 1.1SATISFIED. INCLUDE A THOROUGH QUEUE ANALYSIS.
 PERFORM DATA COLLECTION AT THE EXISTING CAR WASH AT
 SOUTHERN BLVD, INCLUSIVE OF VEHICLE VOLUMES AND MAXIMUM
 QUEUE LENGTHS
 1.2SATISFIED. INCLUDE LATEST SITE PLAN IN THE APPENDIX
 2) SATISFIED. PROVIDE COUNTY TPS LETTER
 3) SATISFIED. PROVIDE CONTINGENCY PLAN IN THE CASE
 QUEUE SPILLS BEYOND PROPERTY ROW
 4) SATISFIED. CONVERT ALLEYWAY ENTRANCE TO FULL ACCESS
 AND CONVERT THE WESTERLY PROPOSED DRIVEWAY AS EXIT ONLY
 5) SATISFIED. ON THE SITE PLAN, PLEASE SHOWCASE BASIC
 CURB DETAILS (I.E. DRIVEWAY AND PARKING STALLS) ON THE
 OPPOSITE SIDE OF THE ROADS SURROUNDING THE PROPOSED
 DEVELOPMENT. PLEASE PROVIDE DOCUMENT NAME AND SHEET
 NUMBER SHOWCASING SUCH FEATURES.
 6) SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR GARBAGE
 TRUCK AND/OR SERVICE VEHICLES DRIVING IN AND OUT OF THE
 PROPOSED DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES
 CLEARLY DEFINED. ANALYSIS SHOULD BE PROVIDED IN A
 SEPARATE FILE/DRAWING. PLEASE PROVIDE DOCUMENT NAME AND
 SHEET NUMBER SHOWCASING THE ANALYSIS.
 7) SATISFIED. WITH RESPECT TO INTERNAL CIRCULATION.
 WHAT HAPPENS WHEN ALL VACUUM STALLS ARE OCCUPIED AND A
 CUSTOMER DRIVES TO THE END OF THE DRIVEWAY AISLE WHILE
 SEARCHING FOR AN AVAILABLE STALL?
 8) SATISFIED. CLEARLY MARK DEDICATED EMPLOYEE PARKING
 STALLS
 9) SATISFIED. PROVIDE AN OPERATIONAL DIAGRAM OF THE
 FACILITY, SIMILAR TO THE ONE PRESENTED AT THE CITY,
 SHOWCASING PROCESSING TIMES AND CAPACITIES (I.E.
 STACKING, GREETING, LOADING, TUNNEL, INTERIORS/VACUUM)
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  
2022-08-26 17:27:27NO FURTHER COMMENTS.
  
 1) SATISFIED. PROVIDE A REVISED TRAFFIC ANALYSIS
 1.1SATISFIED. INCLUDE A THOROUGH QUEUE ANALYSIS.
 PERFORM DATA COLLECTION AT THE EXISTING CAR WASH AT
 SOUTHERN BLVD, INCLUSIVE OF VEHICLE VOLUMES AND MAXIMUM
 QUEUE LENGTHS
 1.2SATISFIED. INCLUDE LATEST SITE PLAN IN THE APPENDIX
 2) SATISFIED. PROVIDE COUNTY TPS LETTER
 3) SATISFIED. PROVIDE CONTINGENCY PLAN IN THE CASE
 QUEUE SPILLS BEYOND PROPERTY ROW
 4) SATISFIED. CONVERT ALLEYWAY ENTRANCE TO FULL ACCESS
 AND CONVERT THE WESTERLY PROPOSED DRIVEWAY AS EXIT ONLY
 5) SATISFIED. ON THE SITE PLAN, PLEASE SHOWCASE BASIC
 CURB DETAILS (I.E. DRIVEWAY AND PARKING STALLS) ON THE
 OPPOSITE SIDE OF THE ROADS SURROUNDING THE PROPOSED
 DEVELOPMENT. PLEASE PROVIDE DOCUMENT NAME AND SHEET
 NUMBER SHOWCASING SUCH FEATURES.
 6) SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR GARBAGE
 TRUCK AND/OR SERVICE VEHICLES DRIVING IN AND OUT OF THE
 PROPOSED DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES
 CLEARLY DEFINED. ANALYSIS SHOULD BE PROVIDED IN A
 SEPARATE FILE/DRAWING. PLEASE PROVIDE DOCUMENT NAME AND
 SHEET NUMBER SHOWCASING THE ANALYSIS.
 7) SATISFIED. WITH RESPECT TO INTERNAL CIRCULATION.
 WHAT HAPPENS WHEN ALL VACUUM STALLS ARE OCCUPIED AND A
 CUSTOMER DRIVES TO THE END OF THE DRIVEWAY AISLE WHILE
 SEARCHING FOR AN AVAILABLE STALL?
 8) SATISFIED. CLEARLY MARK DEDICATED EMPLOYEE PARKING
 STALLS
 9) SATISFIED. PROVIDE AN OPERATIONAL DIAGRAM OF THE
 FACILITY, SIMILAR TO THE ONE PRESENTED AT THE CITY,
 SHOWCASING PROCESSING TIMES AND CAPACITIES (I.E.
 STACKING, GREETING, LOADING, TUNNEL, INTERIORS/VACUUM)
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved