| Date |
Text |
| 2022-06-13 11:24:37 | 1) PARTIALLY SATISFIED. PROVIDE A REVISED TRAFFIC |
| | ANALYSIS |
| | 1.1 SATISFIED. INCLUDE A THOROUGH QUEUE ANALYSIS. |
| | PERFORM DATA COLLECTION AT THE EXISTING CAR WASH AT |
| | SOUTHERN BLVD, INCLUSIVE OF VEHICLE VOLUMES AND MAXIMUM |
| | QUEUE LENGTHS |
| | 1.2 NOT SATISFIED. INCLUDE LATEST SITE PLAN IN THE |
| | APPENDIX |
| | 2) SATISFIED. PROVIDE COUNTY TPS LETTER |
| | 3) SATISFIED. PROVIDE CONTINGENCY PLAN IN THE CASE |
| | QUEUE SPILLS BEYOND PROPERTY ROW |
| | 4) SATISFIED. CONVERT ALLEYWAY ENTRANCE TO FULL ACCESS |
| | AND CONVERT THE WESTERLY PROPOSED DRIVEWAY AS EXIT ONLY |
| | 5) SATISFIED. ON THE SITE PLAN, PLEASE SHOWCASE BASIC |
| | CURB DETAILS (I.E. DRIVEWAY AND PARKING STALLS) ON THE |
| | OPPOSITE SIDE OF THE ROADS SURROUNDING THE PROPOSED |
| | DEVELOPMENT. PLEASE PROVIDE DOCUMENT NAME AND SHEET |
| | NUMBER SHOWCASING SUCH FEATURES. |
| | 6) SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR GARBAGE |
| | TRUCK AND/OR SERVICE VEHICLES DRIVING IN AND OUT OF THE |
| | PROPOSED DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES |
| | CLEARLY DEFINED. ANALYSIS SHOULD BE PROVIDED IN A |
| | SEPARATE FILE/DRAWING. PLEASE PROVIDE DOCUMENT NAME AND |
| | SHEET NUMBER SHOWCASING THE ANALYSIS. |
| | 7) NOT SATISFIED. WITH RESPECT TO INTERNAL CIRCULATION, |
| | WHAT HAPPENS WHEN ALL VACUUM STALLS ARE OCCUPIED AND A |
| | CUSTOMER DRIVES TO THE END OF THE DRIVEWAY AISLE WHILE |
| | SEARCHING FOR AN AVAILABLE STALL? |
| | 8) NOT SATISFIED. CLEARLY MARK DEDICATED EMPLOYEE |
| | PARKING STALLS |
| | 9) NOT SATISFIED. PROVIDE AN OPERATIONAL DIAGRAM OF THE |
| | FACILITY, SIMILAR TO THE ONE PRESENTED AT THE CITY |
| | MEETING FOR THE SOUTHERN BLVD FACILITY, SHOWCASING |
| | PROCESSING TIMES AND CAPACITIES (I.E. STACKING, |
| | GREETING, LOADING, TUNNEL, INTERIORS/VACUUM) |
| | |
| | VALERIO ORICCHIO |
| | CITY TRANSPORTATION ENGINEER |
| | 561-494-1092 |
| | [email protected] |
| | |
| |
Print |