2022-06-30 17:38:30THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 5-13-2022 SUBMITTAL. THEY CAN BE ADDRESSED DURING THE
 ENGINEERING PERMIT SUBMITTAL IF NO OTHER SUBMITTALS OF
 THE ENGNEERING PLAN IS REQUIRED FOR SITE PLAN APPROVAL.
  
 1. [SATISFIED] THE CITY'S OFFICIAL VERTICAL DATUM IS
 NGVD1929. THE CITY HAS ALLOWED THE USE OF NAVD1988 AS
 LONG AS THE CONVERSION EQUATION TO NGVD1929 AT THE
 PROJECT LOCATION IS PROVIDED. PROVIDE CONVERSION TO
 NGVD1929 ON THE SURVEY AND EVERY SHEET WITH ELEVATION
 INFORMATION.
  
 2. [PARTIALLY SATISFIED - LABEL PIPE AND PIPE MATERIAL]
 SHOW AND LABEL STORM PIPE BETWEEN CATCH BASIN IN THE
 CUL-DE-SAC AND THE CANAL.
  
 3. [NOT SATISFIED - PROVIDE WITH ENGINEERING PERMIT
 SUBMITTAL] PROVIDE CROSS SECTIONS AT THE DRIVEWAY
 CONNECTIONS AT THE PROPERTY LINES. LABEL PROPERTY LINE
 AND SHOW GENERAL SURFACES ARE SLOPING AND WHERE THE
 HIGH POINT WILL BE WITHIN THE SITE.
  
 4. [NOT SATISFIED - PROVIDE WITH ENGINEERING PERMIT
 SUBMITTAL] PROVIDE CROSS SECTION FROM PALM BEACH LAKES
 BLVD TO INTERIOR OF VEHICLE STACKING AREA.
  
 5. [NOT SATISFIED - PROVIDE WITH ENGINEERING PERMIT
 SUBMITTAL] PROVIDE CROSS SECTION FROM OUTSIDE NORTHEAST
 PROPERTY LINE TO FACE OF BUILDING. DIMENSION DRIVE
 AISLE, PARKING, LANDSCAPING, ETC.
  
 6. [SATISFIED] CAR WASH WASTEWATER IS NOT TO ENTER THE
 DRAINAGE SYSTEM.
  
 7. [SATISFIED] THE CITY DOES NOT ALLOW THE USE OF
 ORIFICES WITH EXFILTRATION TRENCHES.
  
 8. [SATISFIED] INCLUDE PRBS IN STRUCTURES CONNECTED TO
 EXFILTRATION TRENCHES TO EXTEND THE LIFE OF THE
 EXFILTRATION TRENCHES.
  
 9. [SATISFIED] AVOID PLANTING TREES OVER UTILITY PIPES.
  
 NEW COMMENTS:
 10. MOVE THE EXFILTRATION TRENCH AWAY FROM THE SANITARY
 SEWER LATERAL CROSSING. WHY IS THE EXFILTRATION SPLIT?
 CAN PORTION OF THE EXFILTRATION BE MOVED CLOSER TO THE
 CONTROL STRUCTURE AND/OR NORTHEAST OF THE CONTROL
 STRUCTURE SO THAT THE EASTERN STORM SYSTEM HAS
 TREATMENT BEFORE FLOWING OVER THE WEIR.
  
 11. HAVE YOU CONSIDERED MOVING THE INVERTED CROWN OF
 THE EASTERN DRIVEWAY FROM THE MIDDLE OF THE 13 FT DRIVE
 LANE TO THE SOUTHWEST EDGE OF THE DRIVE LANE (BETWEEN
 DRIVE LANE AND PARKING STALLS)?
  
 12. HAVE YOU CONSIDERED MOVING THE INVERTED CROWN OF
 THE NORTHERN DRIVEL LANES FROM THE CENTER OF THE DRIVE
 LANES TO AGAINST THE CURB LINE.
  
 13. SAFETY CURB MAY NOT BE NEEDED FOR THE SIDEWALK
 CONNECTION TO THE PALM BEACH LAKES BOULEVARD SIDEWALK.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved