| Plan Review Notes For Project Z22030025 |
| Project Number |
Z22030025 |
|
| Review Stop |
TRAFFIC |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2022-04-13 17:32:21 | 1) PROVIDE A REVISED TRAFFIC ANALYSIS | | | 1.1) INCLUDE A THOROUGH QUEUE ANALYSIS. PERFORM DATA | | | COLLECTION AT THE EXISTING CAR WASH AT SOUTHERN BLVD, | | | INCLUSIVE OF VEHICLE VOLUMES AND MAXIMUM QUEUE LENGTHS | | | 1.2) INCLUDE LATEST SITE PLAN IN THE APPENDIX | | | 2) PROVIDE COUNTY TPS LETTER | | | 3) PROVIDE CONTINGENCY PLAN IN THE CASE QUEUE SPILLS | | | BEYOND PROPERTY ROW | | | 4) CONVERT ALLEYWAY ENTRANCE TO FULL ACCESS AND CONVERT | | | THE WESTERLY PROPOSED DRIVEWAY AS EXIT ONLY | | | 5) ON THE SITE PLAN, PLEASE SHOWCASE BASIC CURB DETAILS | | | (I.E. DRIVEWAY AND PARKING STALLS) OF ADJACENT | | | PROPERTIES | | | 6) PROVIDE AUTOTURN ANALYSIS FOR GARBAGE TRUCK AND/OR | | | SERVICE VEHICLES DRIVING IN AND OUT OF THE PROPOSED | | | DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES CLEARLY | | | DEFINED. ANALYSIS SHOULD BE PROVIDED IN A SEPARATE | | | FILE/DRAWING. PLEASE PROVIDE DOCUMENT NAME AND SHEET | | | NUMBER SHOWCASING THE ANALYSIS | | | 7) CIRCULATION. WHAT HAPPENS WHEN ALL VACUUM STALLS ARE | | | OCCUPIED AND A CUSTOMER DRIVES TO THE END OF THE | | | DRIVEWAY WHILE SEARCHING FOR AN AVAILABLE STALL? | | | 8) CLEARLY MARK DEDICATED EMPLOYEE PARKING STALLS | | | | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
| |
Print |
|