Plan Review Notes
Plan Review Notes For Project Z22030025
Project Number Z22030025
Review Stop TRAFFIC
Sequence Number 1
Notes
Date Text
2022-04-13 17:32:211) PROVIDE A REVISED TRAFFIC ANALYSIS
 1.1) INCLUDE A THOROUGH QUEUE ANALYSIS. PERFORM DATA
 COLLECTION AT THE EXISTING CAR WASH AT SOUTHERN BLVD,
 INCLUSIVE OF VEHICLE VOLUMES AND MAXIMUM QUEUE LENGTHS
 1.2) INCLUDE LATEST SITE PLAN IN THE APPENDIX
 2) PROVIDE COUNTY TPS LETTER
 3) PROVIDE CONTINGENCY PLAN IN THE CASE QUEUE SPILLS
 BEYOND PROPERTY ROW
 4) CONVERT ALLEYWAY ENTRANCE TO FULL ACCESS AND CONVERT
 THE WESTERLY PROPOSED DRIVEWAY AS EXIT ONLY
 5) ON THE SITE PLAN, PLEASE SHOWCASE BASIC CURB DETAILS
 (I.E. DRIVEWAY AND PARKING STALLS) OF ADJACENT
 PROPERTIES
 6) PROVIDE AUTOTURN ANALYSIS FOR GARBAGE TRUCK AND/OR
 SERVICE VEHICLES DRIVING IN AND OUT OF THE PROPOSED
 DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES CLEARLY
 DEFINED. ANALYSIS SHOULD BE PROVIDED IN A SEPARATE
 FILE/DRAWING. PLEASE PROVIDE DOCUMENT NAME AND SHEET
 NUMBER SHOWCASING THE ANALYSIS
 7) CIRCULATION. WHAT HAPPENS WHEN ALL VACUUM STALLS ARE
 OCCUPIED AND A CUSTOMER DRIVES TO THE END OF THE
 DRIVEWAY WHILE SEARCHING FOR AN AVAILABLE STALL?
 8) CLEARLY MARK DEDICATED EMPLOYEE PARKING STALLS
  
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved