| Plan Review Notes For Project Z22020030 |
| Project Number |
Z22020030 |
|
| Review Stop |
TRAFFIC |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2022-03-11 15:13:04 | 1) SATISFIED. TO VERIFY THE PROPOSED NEW LOADING ZONE | | | OPERATIONAL FEASIBILITY, PLEASE PROVIDE AUTOTURN | | | ANALYSIS FOR GARBAGE TRUCK AND DELIVERY/SERVICE | | | VEHICLES DRIVING IN AND OUT OF THE PROPOSED DEVELOPMENT | | | WITH VEHICLE DYNAMIC ENVELOPES CLEARLY DEFINED. | | | ANALYSIS SHOULD BE PROVIDED IN A SEPARATE SITE PLAN | | | DRAWING FOR CLARITY PURPOSES | | | 2) SATISFIED. CONTACT PALM TRAN PERTAINING THE BUS STOP | | | RELOCATION. IF FEASIBLE, PLEASE INSTALL A BUS SHELTER. | | | PLEASE CC [email protected] FOR EMAIL CORRESPONDENCE IN | | | THIS MATTER. | | | 3) SATISFIED. PLEASE ADDRESS THE CONDITIONS IMPOSED | | | DURING THE PREVIOUS APPLICATION: | | | A. UPDATE THE TRAFFIC STUDY BY SHOWCASING EXPECTED | | | TURNING VOLUMES OF THE DRIVEWAY ON DIXIE HIGHWAY | | | B. PROVIDE SYNCHRO ANALYSIS FOR THE FOLLOWING TWO | | | INTERSECTIONS: S DIXIE/BELVEDERE AND S DIXIE/VALENCIA | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
| |
Print |
|