Plan Review Notes
Plan Review Notes For Project Z22020030
Project Number Z22020030
Review Stop TRAFFIC
Sequence Number 3
Notes
Date Text
2022-03-11 15:13:041) SATISFIED. TO VERIFY THE PROPOSED NEW LOADING ZONE
 OPERATIONAL FEASIBILITY, PLEASE PROVIDE AUTOTURN
 ANALYSIS FOR GARBAGE TRUCK AND DELIVERY/SERVICE
 VEHICLES DRIVING IN AND OUT OF THE PROPOSED DEVELOPMENT
 WITH VEHICLE DYNAMIC ENVELOPES CLEARLY DEFINED.
 ANALYSIS SHOULD BE PROVIDED IN A SEPARATE SITE PLAN
 DRAWING FOR CLARITY PURPOSES
 2) SATISFIED. CONTACT PALM TRAN PERTAINING THE BUS STOP
 RELOCATION. IF FEASIBLE, PLEASE INSTALL A BUS SHELTER.
 PLEASE CC [email protected] FOR EMAIL CORRESPONDENCE IN
 THIS MATTER.
 3) SATISFIED. PLEASE ADDRESS THE CONDITIONS IMPOSED
 DURING THE PREVIOUS APPLICATION:
 A. UPDATE THE TRAFFIC STUDY BY SHOWCASING EXPECTED
 TURNING VOLUMES OF THE DRIVEWAY ON DIXIE HIGHWAY
 B. PROVIDE SYNCHRO ANALYSIS FOR THE FOLLOWING TWO
 INTERSECTIONS: S DIXIE/BELVEDERE AND S DIXIE/VALENCIA
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved