| 2022-03-04 13:01:30 | 1) VERIFY THE PROPOSED NEW LOADING ZONE OPERATIONAL | | | FEASIBILITY, PLEASE PROVIDE AUTOTURN ANALYSIS FOR | | | GARBAGE TRUCK AND DELIVERY/SERVICE VEHICLES DRIVING IN | | | AND OUT OF THE PROPOSED DEVELOPMENT WITH VEHICLE | | | DYNAMIC ENVELOPES CLEARLY DEFINED. ANALYSIS SHOULD BE | | | PROVIDED IN A SEPARATE SITE PLAN DRAWING FOR CLARITY | | | PURPOSES | | | 2) CONTACT PALM TRAN PERTAINING THE BUS STOP | | | RELOCATION. IF FEASIBLE, PLEASE INSTALL A BUS SHELTER | | | 3) PLEASE ADDRESS THE CONDITIONS IMPOSED DURING THE | | | PREVIOUS APPLICATION, SPECIFICALLY: | | | A. UPDATE THE TRAFFIC STUDY BY SHOWCASING EXPECTED | | | TURNING VOLUMES OF THE DRIVEWAY ON DIXIE HIGHWAY | | | B. PROVIDE SYNCHRO ANALYSIS FOR THE FOLLOWING TWO | | | INTERSECTIONS: S DIXIE/BELVEDERE AND S DIXIE/VALENCIA | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
| |
Print |
|