| Plan Review Notes For Project Z22020030 |
| Project Number |
Z22020030 |
|
| Review Stop |
TRAFFIC |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2022-02-16 21:47:13 | SITE AND TRAFFIC COMMENTS | | | 1) TO VERIFY PROPOSED LOADING ZONE OPERATIONAL | | | FEASIBILITY, PLEASE PROVIDE AUTOTURN ANALYSIS FOR | | | GARBAGE TRUCK AND DELIVERY/SERVICE VEHICLES DRIVING IN | | | AND OUT OF THE PROPOSED DEVELOPMENT WITH VEHICLE | | | DYNAMIC ENVELOPES CLEARLY DEFINED. ANALYSIS SHOULD BE | | | PROVIDED IN A SEPARATE FILE/DRAWING. PLEASE PROVIDE | | | DOCUMENT NAME AND SHEET NUMBER SHOWCASING THE ANALYSIS | | | 2) CONTACT PALM TRAN PERTAINING THE BUS STOP | | | RELOCATION. IF FEASIBLE, PROVIDE A BUS SHELTER. | | | 3) PLEASE ADDRESS THE CONDITIONS IMPOSED DURING THE | | | PREVIOUS APPLICATION: | | | A. UPDATE THE TRAFFIC STUDY BY SHOWCASING EXPECTED | | | TURNING VOLUMES OF THE DRIVEWAY ON DIXIE HIGHWAY | | | B. PROVIDE SYNCHRO ANALYSIS FOR THE FOLLOWING TWO | | | INTERSECTIONS: S DIXIE/BELVEDERE AND S DIXIE/VALENCIA | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
| |
Print |
|