Plan Review Notes
Plan Review Notes For Project Z22020030
Project Number Z22020030
Review Stop TRAFFIC
Sequence Number 1
Notes
Date Text
2022-02-16 21:47:13SITE AND TRAFFIC COMMENTS
 1) TO VERIFY PROPOSED LOADING ZONE OPERATIONAL
 FEASIBILITY, PLEASE PROVIDE AUTOTURN ANALYSIS FOR
 GARBAGE TRUCK AND DELIVERY/SERVICE VEHICLES DRIVING IN
 AND OUT OF THE PROPOSED DEVELOPMENT WITH VEHICLE
 DYNAMIC ENVELOPES CLEARLY DEFINED. ANALYSIS SHOULD BE
 PROVIDED IN A SEPARATE FILE/DRAWING. PLEASE PROVIDE
 DOCUMENT NAME AND SHEET NUMBER SHOWCASING THE ANALYSIS
 2) CONTACT PALM TRAN PERTAINING THE BUS STOP
 RELOCATION. IF FEASIBLE, PROVIDE A BUS SHELTER.
 3) PLEASE ADDRESS THE CONDITIONS IMPOSED DURING THE
 PREVIOUS APPLICATION:
 A. UPDATE THE TRAFFIC STUDY BY SHOWCASING EXPECTED
 TURNING VOLUMES OF THE DRIVEWAY ON DIXIE HIGHWAY
 B. PROVIDE SYNCHRO ANALYSIS FOR THE FOLLOWING TWO
 INTERSECTIONS: S DIXIE/BELVEDERE AND S DIXIE/VALENCIA
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved