| Plan Review Notes For Project Z22020029 |
| Project Number |
Z22020029 |
|
| Review Stop |
STORM |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2022-03-09 17:47:47 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL | | | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION | | | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE | | | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT | | | APPLICATION PROCESSES. | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO | | | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING | | | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. | | | | | | | | | 1. PROVIDE AN EROSION CONTROL PLAN WITH DETAILS. | | | 2. PROVIDE CALCULATIONS DEMONSTRATING ADEQUATE | | | TREATMENT IS AVAILABLE FOR THE ADDITIONAL IMPERVIOUS | | | AREA AND NO NET INCREASE IN OFFSET DISCHARGE DUE TO THE | | | DECREASE IN THE DETENTION AREA. | | | | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | [email protected] | | | |
| |
Print |
|