Plan Review Notes
Plan Review Notes For Project Z22020024
Project Number Z22020024
Review Stop STORM
Sequence Number 1
Notes
Date Text
2022-03-09 17:37:14THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
 1. ANY CONDITIONS FROM PREVIOUS SITE PLAN APPROVAL
 STORMWATER REVIEWS WOULD APPLY TO THIS SITE PLAN.
 2. CROSS WALK STRIPING DOES NOT APPEAR TO ALIGN WITH
 CART PATH ON OPPOSITE SIDE OF PRESIDENTIAL WAY.
 3. PROVIDE A CROSS SECTION SIMILAR TO A-A BUT THROUGH
 THE CART PATH ALONG THE EAST PROPERTY LINE.
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP
 CRITERIA. STORMWATER CALCULATIONS WILL BE REVIEWED WITH
 THE ENGINEERING PERMIT SUBMITTAL.
  
 2. PROVIDE COPY OF SFWMD ERP MODIFICATION BEFORE START
 OF CONSTRUCTION, IF REQUIRED.
  
 3. PROVIDE AN EROSION CONTROL PLAN WITH DETAILS.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  