Plan Review Notes
Plan Review Notes For Project Z22020019
Project Number Z22020019
Review Stop STORM
Sequence Number 3
Notes
Date Text
2022-09-30 09:07:12THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 8/31/22. PREVIOUSLY SATISFIED COMMENTS ARE NOT
 INCLUDED.
  
 8. [SATISFIED] SHOW EXISTING AND PROPOSED UTILITIES ON
 THE LANDSCAPE PLANS.
  
 NEW COMMENTS (4/15/22 SUBMITTAL):
  
 11. [SATISFIED BUT SEE NEW COMMENT #19 BELOW.]
 REGARDING THE QUADRILLE PLAZA DRIVE R/W DESIGNATION,
 CHECK WITH VINCE NOEL (561-494-1096) ON HOW IT SHOULD
 BE LABELED (AS R/W LINE, PARCEL LINE, ETC.)
  
 12. [SATISFIED BUT SEE NEW COMMENT #19 BELOW.] SHOW AND
 LABELED THE PROPOSED EAST PROPERTY LINE FOR THE
 DEVELOPMENT.
  
 13. [SATISFIED] MOVE THE STORM MANHOLE OUT OF THE
 CLEMATIS STREET R/W OR RUN THE STORM PIPE FROM THE
 PROPOSED CONTROL STRUCTURE TO THE BACK OF THE EXISTING
 INLET ON CLEMATIS STREET WITHOUT A MANHOLE.
  
 14. [SATISFIED] JUSTIFY ANY OUTFALL PIPE LARGER THAN
 15-INCH DIAMETER.
  
 15. [SATISFIED - SEE COMMENT #20 BELOW] BUILDING ON THE
 CONCEPTUAL ENGINEERING PLAN DOES NOT MATCH THE
 ARCHITECTURAL SITE PLAN WITH RESPECT TO RECESSS DOOR
 OPENINGS, BUILDING SHAPE, ETC.
  
 16. [SATISFIED] ADVISE IF THE FPL U.E. WILL CONFLICT
 WITH THE R-TANKS STORAGE CHAMBERS.
  
 17. [SATISFIED] LABEL THE EAST-WEST DASHED LINE SHOWN
 NORTH OF THE PROPOSED CONTROL STRUCTURE.
  
 18. [SATISFIED] SHOW SHALLOW SWALE ON TYPICAL SECTION
 B-B TO PREVENT DIRECT RUNOFF INTO THE ALLEY.
  
 NEW COMMENTS (8-31-22 SUBMITTAL)
  
 19. PROPOSED PROPERTY LINES ON THE CONCEPTUAL
 ENGINEERING PLAN DO NOT APPEAR TO BE SHOWN IN THE
 CORRECT LOCATION. IT IS STAFF'S UNDERSTANDING THE NORTH
 PROPERTY LINE WILL COINCIDE WITH THE SOUTH R/W OF
 CLEMATIS STREET, THE EAST PROPERTY LINE WILL BE 65 FEET
 WEST OF AND PARALLEL TO THE WEST 100' F.E.C. RAILWAY
 R/W, AND THE SOUTH PROPERTY LINE WILL COINCIDE WITH THE
 NORTH R/W OF THE 14' ALLEY. ALSO REVISE THE PL LABELED
 ON SECTION B-B.
  
 20. THE WEST SIDE OF THE DRIVEWAY TO THE ALLEY DOES
 NOTT APPEAR TO LINE UP WITH THE WALL OPENING. THIS CAN
 BE CORRECTED WITH THE ENGINEERING PERMIT SUBMITTAL.
  
 21. LABEL THE STORM PIPE IN THE R/W AS RCP.
  
 22. PROVIDE INFORMATION (RIM, INVERTS, BOTTOM
 ELEVATION) OF THE EXISTING CATCH BASIN THAT THE
 STORMWATER PIPE WILL CONNECT TO. THIS CAN BE PROVIDED
 WITH THE ENGINEERING PERMIT SUBMITTAL.
  
 23. SHOW AND PROVIDE INFORMATION (TYPE, SIZE, MATERIAL,
 ELEVATION) OF DRY UTILITIES IN THE R/W. THIS CAN BE
 PROVIDED WITH THE ENGINEERING PERMIT SUBMITTAL.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 [email protected]
  