Plan Review Notes
Plan Review Notes For Project Z22020019
Project Number Z22020019
Review Stop STORM
Sequence Number 2
Notes
Date Text
2022-08-05 10:33:56THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 4/15/2022 SUBMTITAL:
  
 1. [SATISFIED] NGVD1929 TO NAVD1988 CONVERSION EQUATION
 IS DIFFERENT BETWEEN THE SURVEY AND THE ENGINEERING
 PLAN.
  
 2. [SATISFIED] REDUCE THE AMOUNT OF DRAINAGE PIPE IN
 THE RIGHT OF WAY BY CONNECTING TO THE EXISTING VALLEY
 GUTTER INLET BETWEEN THE ON-STREET PARKING SPACES.
  
 3. [SATISFIED] LABEL THE ONSITE DRAINAGE CONTROL
 STRUCTURE.
  
 4. [SATISFIED] THERE IS A PROPOSED FPL CHARGING STATION
 PROJECT ON THE SOUTH SIDE OF THE ALLEY. SHOW THE
 DRIVEWAY OPENING AND OTHER PROPOSED IMPROVEMENTS ALONG
 THE SOUTH R/W OF THE ALLEY FROM THAT PROJECT ON THE
 CONCEPTUAL ENGINEERING PLAN.
  
 5. [SATISFIED] REVIEW THE CITY'S PROPOSED UTILITY
 PROJECT IN THE ALLEY BETWEEN ROSEMARY AVE AND QUADRILLE
 PLAZA DRIVE.
  
 6. [SATISFIED - SEE COMMENT BELOW] LABEL THE WEST RIGHT
 OF WAY LINE OF QUADRILLE PLAZA DRIVE.
  
 7. [SATISFIED BASED ON EOR RESPONSE] GARAGE OPENING TO
 BE OF SUFFICIENT HEIGHT FOR MAINTENANCE VEHICLES TO
 ACCESS THE DRAINAGE SYSTEM UNDER THE BUILDING.
  
 8. [NOT SATISFIED] SHOW EXISTING AND PROPOSED UTILITIES
 ON THE LANDSCAPE PLANS.
  
 9. [SATISFIED - SEE ADDITIONAL COMMENT BELOW] PROVIDE
 CROSS SECTIONS FROM SOUTH ALLEY RIGHT OF WAY TO FACE OF
 BUILDING AND TO 30 FEET INSIDE BUILDING AT THE
 DRIVEWAY. LABEL RIGHT OF WAY LINES AND PROVIDE
 DIMENSIONS FROM THE RIGHT OF WAY TO BUILDING FACE AND
 SHOW GENERAL SURFACE SLOPES.
  
 10. [SATISFIED] EXTRA SET OF DOORS SHOWN ON CONCEPTUAL
 ENGINEERING PLAN OPENING ON QUADRILLE PLAZA DRIVE.
  
 NEW COMMENTS:
  
 11. REGARDING THE QUADRILLE PLAZA DRIVE R/W
 DESIGNATION, CHECK WITH VINCE NOEL (561-494-1096) ON
 HOW IT SHOULD BE LABELED (AS R/W LINE, PARCEL LINE,
 ETC.)
  
 12. SHOW AND LABELED THE PROPOSED EAST PROPERTY LINE
 FOR THE DEVELOIPMENT.
  
 13. MOVE THE STORM MANHOLE OUT OF THE CLEMATIS STREET
 R/W OR RUN THE STORM PIPE FROM THE PROPOSED CONTROL
 STRUCTURE TO THE BACK OF THE EXISTING INLET ON CLEMATIS
 STREET WITHOUT A MANHOLE.
  
 14. JUSTIFY ANY OUTFALL PIPE LARGER THAN 15-INCH
 DIAMETER.
  
 15. BUILDING ON THE CONCEPTUAL ENGINEERING PLAN DOES
 NOT MATCH THE ARCHITECTURAL SITE PLAN WITH RESPECT TO
 RECESSS DOOR OPENINGS, BUILDING SHAPE, ETC.
  
 16. ADVISE IF THE FPL U.E. WILL CONFLICT WITH THE
 R-TANKS STORAGE CHAMBERS.
  
 17. LABEL THE EAST-WEST DASHED LINE SHOWN NORTH OF THE
 PROPOSED CONTROL STRUCTURE.
  
 18. SHOW SHALLOW SWALE ON TYPICAL SECTION B-B TO
 PREVENT DIRECT RUNOFF INTO THE ALLEY.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  