| Plan Review Notes For Project Z21120020 |
| Project Number |
Z21120020 |
|
| Review Stop |
PU |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2022-01-05 16:56:55 | -PROVIDE LEVEL OF SERVICE CALCULATIONS. | | | - SHOW EXISTING UTILITIES ON TAMARIND. | | | - REPLACE/LINE EXISTING LATERALS AS REQUIRED. PROVIDE | | | POST CCTV FOOTAGE. | | | -ADD NOTE TO CUT AND CAP EXISTING DOUBLE WATER METER AT | | | MAIN. | | | -CONFIRM THAT THE EXISTING 6? LATERAL IS SUFFICIENT FOR | | | PROPOSED FLOW. REFERENCE DOUBLE SERVICE DETAIL. | | | -TELEVISE AND CONFIRM CONDITION OF EXISTING LATERALS | | | AND VERIFY THAT IT IS ADEQUATE. | | | -SHOW PROFILE OF 4? CONNECTION FROM TAP TO POINT OF | | | SERVICE. | | | -SHOW EXISTING VALVES. | | | -CUSTOMER SERVICE TO COMMENT ON MASTER METER VS | | | INDIVIDUAL METER. | | | -TELEVISE EXISTING UTILITY FRONTING PROPERTY FROM | | | MANHOLE TO MANHOLE. | | | -SHOW PROPERTY LINE ON 19TH ST. | | | -PLEASE UPSIZE THE 6? WM TO 8? WITHIN PROJECT LIMITS. | | | -MISSING LEVEL OF SERVICE CALC SHEET. | | | - FOR STORMWATER STRUCTURES CALL OUT STATIONING AND | | | HORIZONTAL SEPARATION BETWEEN UTILITIES | | | | | | CONTACT MIKE TECHNOW 561-494-1047 WITH ANY QUESTIONS. |
| |
Print |
|