| 2022-12-13 10:46:28 | CONDITIONS FOR SITE PLAN APPROVAL: |
| | |
| | 1. SHOW OUTLINE OF EXFILTRATION TRENCHES ON THE |
| | LANDSCAPE PLANS. CONFIRM THE PROPOSED LANDSCAPING WILL |
| | NOT INTERFERE WITH THE EXFILTRATION TRENCHES. |
| | 2. CONFIRM THE CONSTRUCTABILITY OF THE 6 FEET WIDE |
| | EXFILTRATION TRENCH EAST OF BUILDING A BETWEEN THE |
| | EXISTING RETAINING WALL AND THE FOOTER FOR THE |
| | BUILDING. FUTURE MAINTENANCE (I.E. REPLACEMENT) OF THE |
| | EXFILTRATION TRENCH NEEDS TO BE CONSIDERED IF THE |
| | TRENCH WILL BE LOCATED UNDER ANY BUILDING OVERHANGS. |
| | 3. SHOW AND LABEL (SIZE AND MATERIAL) ALL EXISTING |
| | UTILITIES IN THE R/W. |
| | 4. CONFIRM THE EXISTING DRAINAGE STRUCTURE TO BE |
| | CONNECTED TO IS NOT A BUBBLE-UP STRUCTURE. SHOW |
| | EXISTING DRAINAGE PIPE CONNECTIONS. PROVIDE PROPOSED |
| | INVERT ELEVATION FOR PIPE CONNECTION TO EXISTING INLET. |
| | PROVIDE THE BOTTOM ELEVATION INVERT ELEVATION FOR THE |
| | EXISTING PIPE(S) CONNECTED TO THE INLET. |
| | 5. CALLOUT THE FDOT CURB RAMP STYLE FOR THE MIDBLOCK |
| | CROSS WALK ON BOTH SIDES OF TAMARIND AVE. |
| | 6. COORDINATE CURBING CALLOUTS ON SHEET C2.3 WITH THE |
| | CROSS SECTIONS AND THE GRADES ON SHEET C2.1. |
| | 7. COORDINATE THE EAST-WEST LOCATION OF THE DRAINAGE |
| | STRUCTURES IN THE PARKING LOT WITH THE SECTION A. |
| | 8. PROVIDE SIGNING AND STRIPING FOR THE MIDBLOCK CROSS |
| | WALK. LABEL THE FDOT CURB RAMP STYLE. |
| | 9. COORDINATE DETAILS FOR THE CONTROL STRUCTURES WITH |
| | THE DRAINAGE PLAN. |
| | 10. PROVIDE A CROSS SECTION AT THE PROPOSED DRIVEWAY |
| | FROM THE CNETERLINE OF THE R/W TO 5 FEET PAST THE HIGH |
| | POINT OF THE DRIVEWAY. SHOW BREAK POINTS, SURFACE |
| | FEATURES, R/W LINE. PROVIDE DIMENSIONS FROM THE R/W TO |
| | THE DRIVEWAY HIGH POINT AND OTHER BREAK POINTS, TO THE |
| | BACK OF CURB/EDGE OF PAVEMENT, TO THE R/W CENTERLINE. |
| | SHOW AND DIMENSION WHERE THE SIDEWALK WILL CROSS THE |
| | DRIVEWAY. |
| | |
| | |
| | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE |
| | 11/4/2022 SUBMITTAL. PREVIOUSLY SATISFIED COMMENTS ARE |
| | NOT INCLUDED. |
| | |
| | 5. [SATISFIED - SEE COMMENTS UNDER NEW COMMENTS BELOW] |
| | PROVIDE CROSS SECTIONS FROM: |
| | A. FACE OF BUILDING TO TAMARIND AVE CENTERLINE |
| | B. FACE OF BUILDING TO GRANT ST CENTERLINE |
| | C. FACE OF BUILDING TO 19TH ST CENTERLINE |
| | D. AT PROPOSED DRIVEWAY |
| | E. FROM EAST PROPERTY LINE TO FACE OF BUILDING ?A? |
| | F. FROM EAST PROPERTY LINE TO FACE OF BUILDING ?B? |
| | |
| | LABEL STREETS, PROPERTY LINES, SURFACE FEATURES AND |
| | GENERAL SURFACE SLOPES. PROVIDE DIMENSIONS FOR |
| | CURBS/CURB AND GUTTER, SIDEWALKS AND DISTANCE FROM |
| | PROPERTY LINE TO FACE OF BUILDING. INCLUDE PROPOSED |
| | PARALLEL PARKING AREAS. |
| | |
| | |
| | |
| | |
| | 9. [SATISFIED - NO NEW SIDEWALKS PER PREVIOUS RESPONSE] |
| | PROVIDE HATCHING PATTERNS FOR SIDEWALKS TO REMAIN AND |
| | FOR NEW/REPLACEMENT SIDEWALKS. ADDITIONAL COMMENT: |
| | SECTION A ON SHEET C3.2 CALLS OUT NEW SIDEWALK ALONG |
| | 19TH ST AND ALONG GRANT AVE. REVISE SECTION OR ADD |
| | PROPOSED SIDEWALK HATCH PATTERN ON SHEETS C2.1 AND C2.3 |
| | AND HATCH THE PROPOSED SIDEWALKS. |
| | |
| | 10. [SATISFIED] EXPLAIN HOW ACCESS FROM THE BUILDINGS |
| | TO THE PARKING LOT WILL BE PROVIDED FOR THE 4 FT+/- |
| | GRADE DIFFERENTIAL. ADDITIONAL COMMENT (REVISED FOR |
| | 7/19 SUBMITTAL): PARKING LOT ELEVATION AT EAST END OF |
| | HANDICAP ACCESS AISLE IS APPROX.. 27.7 FT NAVD. THE |
| | LANDING AT THE BOTTOM OF 19.0 FT LONG RAMP IS AT |
| | ELEVATION 26.0 FT NAVD. RAMP SLOPE CALCULATES TO 8.9%, |
| | WHICH IS STEEPER THAN THE 1:12 ALLOWED FOR NEW |
| | CONSTRUCTION. THE SOUTH END OF THE 10 FT LONG RAMP IS |
| | 47.5 FEET FROM THE NORTH CORNER OF THE BUILDING B. THE |
| | SOUTH SIDE OF THE DOOR FRAME OF THE APARTMENT ADJACENT |
| | TO THE RETAIL SPACE IS 47.08 FEET FROM THE NORTH CORNER |
| | OF BUILDING B SO THAT THE RAMP WILL BE IN FRONT OF THE |
| | DOOR. |
| | |
| | |
| | 20. [PARTIALLY SATISFIED ??? SHOW OUTLINE OF |
| | EXFILTRATION TRENCHES.] SHOW UTILITIES ON THE LANDSCAPE |
| | PLANS. |
| | |
| | |
| | |
| | NEW COMMENTS: |
| | |
| | 26. [NOT SATISFIED ??? ONSITE DRAINAGE SYSTEM MAY NOT |
| | CONNECT TO THE STRUCTURE IF THE DRAINAGE STRUCTURE IS |
| | NOT CONNECTED TO A POSITIVE DRAINAGE SYSTEM.] SHOW ALL |
| | EXISTING PIPE CONNECTIONS (WITH PIPE SIZES) TO THE |
| | EXISTING CURB INLET AND THE STRUCTURES THESE PIPES ARE |
| | CONNECTED TO. |
| | |
| | 30. - 33 [NOT SATISFIED ? NOTE PREVIOUS SECTIONS WERE |
| | REPLACED WITH NEW SECTIONS ON THE 7/19 SUBMITTAL. THE |
| | COMMENTS BELOW ARE FOR THE NEW SECTIONS. |
| | |
| | 30. SECTION A (SHEET C3.2): |
| | A. SECTION APPEARS TO CORRESPOND TO SECTION B SYMBOL ON |
| | SHEET C2.1. |
| | B. CHANGE LABEL OF GRANT AVE TO GRANT ST. |
| | C. SIDEWALKS ON GRANT ST AND 19TH ST APPEAR TO HAVE |
| | THICKENED EDGE AT BACK OF SIDEWALK. PROVIDE A DETAIL |
| | FOR THE SIDEWALK. |
| | D. DOOR AND WINDOW LAYOUT FOR BUILDINGS A AND B DO NOT |
| | MATCH THE ARCHITECTURAL ELEVATION DRAWINGS. |
| | E. CONFIRM THE GRADES PROVIDED FOR GRANT ST. THE EP IS |
| | SHOWN HIGHER THAN THE CENTERLINE. |
| | |
| | 31. SECTION B (SHEET C3.2): |
| | A. [SATISFIED] SECTION APPEARS TO CORRESPOND TO SECTION |
| | A SYMBOL ON SHEET C2.1. |
| | B. [SATISFIED] VERIFY ELEVATION FOR EAST SIDE OF DRIVE |
| | AISLE (29.7). |
| | C. [SATISFIED] SIDEWALK ALONG TAMARIND AVE APPEARS TO |
| | HAVE A THICKENED EDGE. |
| | D. [NOT SATISFIED] CENTER OF DRIVE AISLE APPEARS TO BE |
| | LOW SPOT (INVERTED CROWN) BUT THE DRAINAGE STRUCTURES |
| | ON SHEET C2.1 ARE 14+ FEET FROM THE EAST EDGE OF THE |
| | PARKING LOT. |
| | |
| | 32.[SATISFIED] SECTION C (SHEET C3.2): |
| | A. THIS SECTION DOESN???T APPEAR TO BE FOR THIS |
| | DEVELOPMENT. BUILDING A WIDTH IS CALLED OUT AS 132 FEET |
| | WHEREAS IN SECTION A THE BUILDING A WIDTH IS 88 FEET. |
| | B. PROVIDE A SECTION CORRESPONDING TO THE SECTION C |
| | SYMBOL ON SHEET C2.1. |
| | |
| | 36. [NOT SATISFIED] ARCHITECTURAL NORTH AND SOUTH |
| | ELEVATIONS APPEAR TO BE MISLABELED ON SHEETS |
| | A-2.1/A2.2B AND SHEETS A-2.1A/A-2.2A. |
| | |
| | NEW COMMENTS ON 7/19/22 SUBMITTAL: |
| | |
| | 37. [SATISFIED] PROVIDE A CROSS SECTION FROM THE CENTER |
| | OF THE PARKING LOT TO THE EAST FACE OF BUILDING, |
| | CENTERED ON THE RAMP FROM THE PARKING LOT TO THE FIRST |
| | FLOOR SIDEWALK. PROVIDE HORIZONTAL DIMENSIONS AND |
| | ELEVATIONS AT EACH GRADE BREAK. |
| | |
| | 38.[SATISFIED[ LABEL BUILDING A AND BUILDING B ON THE |
| | CIVIL DRAWINGS. |
| | |
| | 39. [NOT SATISFIED] LABEL THE EXISTING UTILITIES (PIPE |
| | SIZE AND MATERIAL) IN THE RIGHTS OF WAYS. |
| | |
| | 40. [SATISFIED] HOW DOES ONE ACCESS BUILDING A FROM THE |
| | PARKING LOT? THERE DOESN?T APPEAR TO BE A SIDEWALK |
| | CONNECTION BETWEEN THE TWO BUILDINGS ON THE EAST SIDE |
| | OF THE BUILDINGS. |
| | |
| | 41. [NOT SATISFIED] CALLOUT THE FDOT CURB RAMP STYLE |
| | FOR THE MIDBLOCK CROSS WALK ON BOTH SIDES OF TAMARIND |
| | AVE. |
| | |
| | 42. [NOT SATISFIED] PROVIDE PROPOSED INVERT ELEVATION |
| | FOR PIPE CONNECTION TO EXISTING INLET. PROVIDE THE |
| | BOTTOM ELEVATION INVERT ELEVATION FOR THE EXISTING |
| | PIPE(S) CONNECTED TO THE INLET. |
| | |
| | 43. [SATISFIED] SOUTH STAIRWELL OF BUILDING B APPEARS |
| | TO CONFLICT WITH THE WEST RETAINING WALL OF THE PARKING |
| | LOT. |
| | |
| | 44. [SATISFIED] PROVIDE A YARD DRAIN AT WEST END OF THE |
| | AREA BETWEEN THE TWO BUILDINGS TO COLLECT RUNOFF BEFORE |
| | IT FLOWS OVER THE SIDEWALK. |
| | |
| | 45. [SATISFIED ??? SUGGEST MOVING STRUCTURES S-101 AND |
| | S-102 SOUTHWARD] SLOPE OF PARKING LOT BETWEEN S-101 AND |
| | BACK OF SIDEWALK APPEARS TO BE CLOSE TO 9%. |
| | |
| | 46. [PARTIALLY SATISFIED ??? DOUBLE PROPOSED SPOT |
| | GRADES PROVIDED FOR EAST EDGE OF PARKING LOT.] SHOW |
| | CURBING ALONG SOUTH AND EAST SIDES OF PARKING LOT ON |
| | THE CIVIL DRAWINGS. SHEET C2.3 CALLS OUT TYPE D CURB. |
| | |
| | 46. [NOT SATISFIED] BIKE LANE STRIPING SHALL FOLLOW THE |
| | CITY STANDARD DETAILS AND THE MUTCD. |
| | |
| | 47. [NOT SATISFIED] SIGNAGE AND STRIPING NEEDED FOR THE |
| | MID-BLOCK CROSS WALK. |
| | |
| | 48. [NOT SATISFIED] REVIEW PIPE SIZES AND INVERT |
| | ELEVATIONS LISTED ON THE CONTROL STRUCTURE S-104 |
| | DETAILS. |
| | |
| | 49. [NOT SATISFIED] REVIEW PIPE MATERIAL LISTED ON THE |
| | CONTROL STRUCTURE S-102 DETAILS. |
| | |
| | 50. [SATISFIED] MOVE CONSTRUCTION ACCESS AREA OUTSIDE |
| | OF THE ROAD RIGHT OF WAY. |
| | |
| | NEW COMMENT (11/4/2022 SUBMITTAL) |
| | 51. CONFIRM THERE IS SUFFICIENT SPACE FOR THE 6-FOOT |
| | WIDE EXFILTRATION TRENCH BETWEEN THE EXISTING RETAINING |
| | WALL AND THE BUILDING A FOOTER AS WELL AS INSTALL THE |
| | PERIMETER LANDSCAPING. |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | 561-494-1120 (O) |
| | 561-351-0510 (M) |
| | [email protected] |
| | |
| | |
| | |
| |
Print |