| 2022-11-17 11:52:12 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER |
| | 561-822-1462 |
| | PROJECT: 1980 N TAMARIND Z21120018 |
| | NOVEMBER 17, 2022 |
| | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND |
| | PROVIDE THE FOLLOWING COMMENTS: |
| | |
| | 1. SATISFIED. PROVIDE A SEPARATE TREE DISPOSITION PLAN |
| | SHOWING THE LOCATIONS OF THE EXISTING TREES AND INCLUDE |
| | THE FOLLOWING INFORMATION: |
| | ??? SATISFIED. ADD A COLUMN TO THE CHART FOR MITIGATION |
| | SQUARE FOOTAGE DUE AND SHOW THE AMOUNT FOR EACH TREE |
| | PROPOSED TO BE REMOVED BASED ON THE CATEGORY OR TREE |
| | CANOPY DIAMETER. COLUMN SHOULD BE LABELED MITIGATION |
| | DUE. TREES WITH A CANOPY 20 FEET OR MORE IN DIAMETER |
| | MUST HAVE THE ACTUAL SQUARE FOOTAGE CALCULATED AND |
| | ENTERED ON THE CHART. |
| | MANGO AND TAMARIND ARE LESS THAN 20 FT CANOPY DIAMETER, |
| | AND BOTH ARE CATEGORY 1, SO EACH 300 SQ FT MITIGATION |
| | DUE. CORRECT ON TD-1. |
| | ??? SATISFIED. PROVIDE TOTAL OF MITIGATION SQUARE |
| | FOOTAGE DUE. |
| | TOTAL IS 600 SQ FT. CORRECT ON TD-1. |
| | ??? SATISFIED. PROVIDE A TOTAL OF MITIGATION SQUARE |
| | FOOTAGE PROVIDED BASED ON THE PLANT LIST. |
| | 7 SIMPSONS STOPPER, CATEGORY 3, EACH 100 SQ FT CREDIT, |
| | FOR 700 SQ FT |
| | 6 LIVE OAKS, CATEGORY 3, EACH 300 SQ FT CREDIT, FOR 900 |
| | SQ FT |
| | 8 ORANGE GEIGER, CATEGORY 2, EACH 150 SQ FT, FOR 1200 |
| | SQ FT |
| | 3 PIGEON PLUM, CATEGORY 2, EACH 150 SQ FT, FOR 450 SQ |
| | FT |
| | 6 THATCH PALM, CATEGORY 4, EACH 50 SQ FT, FOR 300 SQ FT |
| | TOTAL MITIGATION PROVIDED- 3,550 SQ FT |
| | SHOW ON TD-1 |
| | |
| | |
| | 2. SATISFIED. SECTION 94-448 (D)(3) REQUIRES NATIVE |
| | TREES IN GOOD CONDITION TO BE PRESERVED ON SITE OR |
| | RELOCATED. ANSI A 300 (PART 5) STANDARDS SPECIFY |
| | EXAMPLES OF SUITABILITY RATINGS OF GOOD, MODERATE, OR |
| | POOR FOR RELOCATION. PROVIDE AN ARBORIST REPORT SHOWING |
| | CONDITION FOR ALL TREES AND RELOCATION POTENTIAL FOR |
| | THE NATIVE TREES AND PALMS PROPOSED TO BE REMOVED. |
| | |
| | 3. SATISFIED. PROVIDE THE CALCULATIONS FOR THE MINIMUM |
| | REQUIRED SHADE TREES, FLOWERING TREES AND SHRUBS FOR |
| | THE SITE BASED ON 40% OPEN SPACE PER SECTION |
| | 94-442(C)(2)B. PROVIDE THE CALCULATIONS FOR THE OPEN |
| | SPACE BASED ON THE SITE SQUARE FOOTAGE. ADD THE |
| | MULTIFAMILY TREE REQUIREMENT TO THIS TOTAL. |
| | |
| | 4. SATISFIED. PROVIDE THE NUMBER AND PERCENTAGE OF |
| | SUBSTITUTION OF PALMS FOR REQUIRED TREES. SECTION |
| | 94-442(D) REQUIRES A 3:1 RATIO FOR SUBSTITUTION FOR |
| | PALMS EXCEPT THE LISTED 1:1 SPECIES. |
| | |
| | |
| | 5. SATISFIED. PER SECTION 94-443(A)(2) LABEL THE |
| | REQUIRED 5 FOOT LANDSCAPE BUFFER ALONG EACH PROPERTY |
| | LINE AND CALCULATE THE NUMBER OF TREES REQUIRED AND |
| | PROVIDED FOR EACH BUFFER SEGMENT. THE TOTAL LENGTH OF |
| | THE PROPERTY LINE PER THE SURVEY MUST BE USED. |
| | THE WESTERN BUFFER ALONG TAMARIND HAS MULTIPLE BREAKS |
| | FOR PAVED AREAS. STAFF WILL DETERMINE IF THE PATIO |
| | AREAS CANNOT EXCEED 20 PERCENT INTERRUPTION INTENDED. |
| | |
| | 6. SATISFIED. PER SECTION 94-443 (E)2., PROVIDE THE 30% |
| | FOUNDATION PLANTING CALCULATION REQUIRED AND PROVIDED |
| | FOR EACH BUILDING. |
| | THE PLAN MUST SHOW THE LINEAR FOOTAGE OF EACH BUILDING |
| | PERIMETER, REQUIRED LINEAR FOOTAGE AND PROVIDED. |
| | THE REQUIREMENT IS 40% PER SECTION 94-443(D)2.A. |
| | |
| | |
| | 7. SATISFIED. PER SECTION 94-443(C)(3)A. AND B., |
| | TERMINAL LANDSCAPE ISLANDS AND INTERIOR ISLANDS MUST |
| | HAVE AT LEAST 8 FEET WIDE LANDSCAPE AREA AND RUN THE |
| | FULL LENGTH OF THE ADJACENT PARKING SPACE. EACH AREA |
| | SHALL HAVE AT LEAST ONE SHADE OR FLOWERING TREE PER ROW |
| | OF PARKING. LANDSCAPE BUFFER OF 5 FEET MAY BE COUNTED |
| | AS PART OF THE TERMINAL ISLAND. SHOW DIMENSIONS ON THE |
| | LANDSCAPE PLAN. |
| | |
| | 8. SATISFIED. A MINIMUM OF 75% OF ALL TREES REQUIRED TO |
| | BE PLANTED WITHIN THE PARKING AREA MUST BE CATEGORY 1 |
| | SHADE TREES. SHOW THE PERCENTAGE PROVIDED. |
| | 9. SATISFIED. PER SECTION 94-442(G) PROVIDE THE |
| | REQUIRED 50 POINTS FROM THE FLORIDA FRIENDLY DESIGN |
| | OPTIONS LIST AND SHOW THE TOTAL PROVIDED. |
| | 10. SATISFIED. PROVIDE A SECTION IN A LANDSCAPE DATA |
| | CHART TO COMPLY WITH SECTION 94-445 L. PLANT SPECIES. A |
| | MINIMUM OF 60 PERCENT OF PLANT MATERIAL ADDED SHALL BE |
| | FLORIDA NATIVE OR DROUGHT TOLERANT SPECIES SELECTED |
| | FROM THE CITY LIST OR THE LIST OF SPECIES IN THE MOST |
| | RECENT EDITION OF SOUTH FLORIDA WATER MANAGEMENT |
| | DISTRICT WATERWISE SOUTH FLORIDA LANDSCAPES. PROVIDE |
| | THE TOTAL PERCENTAGE OF NATIVE AND DROUGHT TOLERANT |
| | PLANTS BASED ON FINAL PLANT LIST. |
| | |
| | 11. SATISFIED. LOCATIONS OF PROPOSED UTILITY LINES |
| | INCLUDING WATER, SEWER AND DRAINAGE CONFLICT WITH |
| | REQUIRED LANDSCAPING. CIVIL ENGINEERING PLAN, SITE PLAN |
| | AND LANDSCAPE PLAN MUST BE CONSISTENT. |
| | |
| | UTILITIES MUST BE SHOWN ON THE LANDSCAPE PLAN AND |
| | CONFLICTS RESOLVED. UTILITY POSITIONS AND EXFILTRATION |
| | LOCATION WILL PROHIBIT PLANTING OF SEVERAL REQUIRED |
| | TREES. |
| | 8/8/22 CONFLICTS STILL SHOWN WITH DRAINAGE LINES AND |
| | SEWER LINES. |
| | |
| | 12. SATISFIED. SHOW AND LABEL ALL OVERHEAD POWER LINES |
| | THAT WILL LIMIT THE TREE SPECIES TO RIGHT TREE RIGHT |
| | PLACE GUIDELINES. |
| | |
| | 13. SATISFIED. PER SECTION 94-443 (A)(1) A PROTECTIVE |
| | SCREEN WALL IS REQUIRED ALONG THE ADJACENT RESIDENTIAL |
| | PROPERTY LINES. |
| | |
| | ADDITIONAL COMMENTS 8/8/22: |
| | |
| | 14. SATISFIED. MUST SHOW SCREENING OF ABOVE GROUND |
| | VALVES. |
| | |
| | 15. SATISFIED. ORANGE GEIGER AND LIGUSTRUM NEED TO BE |
| | SHOWN AT 12 FT HEIGHT SPECIFICATION ON THE PLAN. ANY |
| | SUPPLY ISSUES MAY BE ADDRESSED AT TIME OF INSTALLATION. |
| | |
| | |
| | |
| | CONDITIONS OF APPROVAL |
| | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON |
| | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE |
| | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT |
| | SERVICES DEPARTMENT, PLANNING DIVISION. |
| | 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE |
| | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE |
| | STREET TREES AND RIGHT OF WAY LANDSCAPING AND |
| | IRRIGATION APPROVED WITH THIS PETITION. |
| | 3. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE |
| | RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF |
| | WAY LANDSCAPING AND IRRIGATION. THIS WILL BE THROUGH A |
| | SEPARATE MAINTENANCE AGREEMENT WITH THE CITY. |
| | |
| |