2022-04-26 13:12:39THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 3/24/2022 RESUBMITTAL:
  
 Z21120017 GRANT STREET AT TAMARIND AVE (NE CORNER)
 1. [SATISFIED] REMOVE REFERENCES TO VOW (VILLAGE OF
 WELLINGTON?) ON COVER.
  
 2. [SATISFIED] CONCEPTUAL ENGINEERING PLAN IS CONFUSING
 WITH EXISTING FEATURES SHOWN AND NOT SCREENED.
  
 3. [PARTIALLY SATISFIED] RELOCATE DRAINAGE SYSTEM FROM
 UNDER STAIRS. ADDITIONAL COMMENT ? OUTFALL PIPE IS
 UNDER THE SOUTH STAIRS OF BUILDING A. THIS PIPE IS WILL
 BE MAINTAINED BY THE PROPERTY OWNER. STAFF IS NOTIFYING
 ENGINEER TO SEE IF THE PIPE CAN BE INSTALLED IN ANOTHER
 LOCATION TO AVOID IMPACTING THE STAIRS IF THE PIPE
 NEEDS TO BE REPLACED/REPAIRED IN THE FUTURE.
  
 4. [PARTIALLY SATISFIED] PROVIDE FLOW ARROWS SHOWING
 DIRECTION OF SURFACE RUNOFF. ADDITIONAL COMMENT ?
 PROVIDE FLOW AREAS FOR THE AREAS AROUND THE BUILDING.
 PROPOSED SPOT GRADES ARE ONLY PROVIDED IN THE PARKING
 LOT.
  
 5. [PARTIALLY SATISFIED ? SEE COMMENTS UNDER NEW
 COMMENTS BELOW] PROVIDE CROSS SECTIONS FROM:
 A. FACE OF BUILDING TO TAMARIND AVE CENTERLINE
 B. FACE OF BUILDING TO GRANT ST CENTERLINE
 C. FACE OF BUILDING TO 19TH ST CENTERLINE
 D. AT PROPOSED DRIVEWAY
 E. FROM EAST PROPERTY LINE TO FACE OF BUILDING ?A?
 F. FROM EAST PROPERTY LINE TO FACE OF BUILDING ?B?
  
 LABEL STREETS, PROPERTY LINES, SURFACE FEATURES AND
 GENERAL SURFACE SLOPES. PROVIDE DIMENSIONS FOR
 CURBS/CURB AND GUTTER, SIDEWALKS AND DISTANCE FROM
 PROPERTY LINE TO FACE OF BUILDING. INCLUDE PROPOSED
 PARALLEL PARKING AREAS.
  
 6. [SATISFIED] SHOW MILL AND RESURFACING LIMITS WITHIN
 THE STREETS.
  
 7. [PARTIALLY SATISFIED] IDENTIFY ON THE CONCEPTUAL
 ENGINEERING PLAN WHERE THE SPECIAL TYPE ?F? CURB AND
 GUTTER WILL BE CONSTRUCTED. REDRAW THE DETAIL IN ACAD
 AND PROVIDE ENGLISH UNITS. ADDITIONAL COMMENT ? THE
 LOCATION FOR THIS CURB IS NOT CALLED OUT ON THE PGD
 PLAN.
  
 8. [SATISFIED] LABEL WHERE THE DRAINAGE CONTROL
 STRUCTURE WILL BE LOCATED AND PROVIDE A DETAIL OF THE
 STRUCTURE. NOTE THE CITY DOES NOT ALLOW THE USE OF
 BLEEDERS WITH EXFILTRATION TRENCHES.
  
 9. [SATISFIED ? NO NEW SIDEWALKS PER RESPONSE] PROVIDE
 HATCHING PATTERNS FOR SIDEWALKS TO REMAIN AND FOR
 NEW/REPLACEMENT SIDEWALKS.
  
 10. [NOT SATISFIED] EXPLAIN HOW ACCESS FROM THE
 BUILDINGS TO THE PARKING LOT WILL BE PROVIDED FOR THE 4
 FT+/- GRADE DIFFERENTIAL. ADDITIONAL COMMENT: PARKING
 LOT ELEVATION AT EAST END OF HANDICAP ACCESS AISLE IS
 APPROX.. 27.7 FT NAVD. 17.6 FT LONG RAMP AT 1:12 SLOPE
 WOULD PUT LANDING ELEVATION AT 26.23 FT NAVD. THE 30 FT
 LONG RAMP FROM LANDING TO SIDEWALK AT BUILDING LEVEL
 WOULD HAVE BOTTOM OF RAMP ELEVATION OF 23.73 FT NAVD.
 THIS IS NEARLY 3 INCHES HIGHER THAN FFE OF 23.5 FT NAVD
 FOR BUILDING ?B?. THE SIDEWALK ADJACENT TO THE BUILDING
 WILL NEED TO SLOPE AWAY FROM THE BUILDING.
  
 11. [PARTIALLY SATISFIED] PER FIGURE XV-2: GENERAL
 PARKING DIMENSIONS IN SECTION 94-485 OF THE CITY?S CODE
 OF ORDINANCES, THE CURB LENGTH OF PARALLEL PARKING
 SPACES IS 22 FEET. THE SITE PLAN SHOWS 25 FEET AND GAPS
 IN THE PARKING SPACES ON TAMARIND AVE. ADDITIONAL
 COMMENT: SP-1 STILL SHOWS 25? DIMENSION AND DOES NOT
 DIMENSION THE NEW PARKING SPACE LAYOUT.
  
 12. [SATISFIED] CONSIDER ANGLING THE CURBING AT EACH
 END OF PROPOSED PARALLEL PARKING SPACES TO FACILITATE
 ACCESS TO AND FROM THE END SPACES.
  
 13. [NOT SATISFIED] THE CITY?S OFFICIAL VERTICAL DATUM
 IS NGVD1929. THE CITY HAS ALLOWED THE USE OF NAVD1988
 AS LONG AS THE CONVERSION EQUATION TO NGVD1929 AT THE
 PROJECT LOCATION IS PROVIDED. PROVIDE THE NAVD1988 TO
 NGVD1929 CONVERSION EQUATION ON THE SURVEY.
  
 14. [SAITISFIED ? NO NEW CURBING IN THE RIGHT OF WAY]
 LABEL ANY NEW GUTTER OR CURB AND GUTTER IN THE RIGHT OF
 WAY.
  
 15. [SATISFIED] CONSIDER LOW IMPACT DEVELOPMENT
 DRAINAGE SYSTEMS IN LIEU OF EXFILTRATION TRENCHES.
  
 16. [SATISFIED] SHOW EXISTING GUTTER BETWEEN PLANTER AT
 NORTH END OF N. TAMARIND AVE AND THE CURB ALONG THE
 SIDEWALK.
  
 17. [SATISFIED ? POLE WILL NEED TO BE SUPPORTED DURING
 PIPE INSTALLATION] STORM OUTFALL PIPE IS LESS THAN 2
 FEET FROM FPL CONCRETE POLE.
  
 18. [SATISFIED] INDICATE IS TRAFFIC CONTROL BOX IS TO
 REMAIN OR BE RELOCATED.
  
 19. [SATISFIED] UTILITY EASEMENT MAY BE NEEDED FOR THE
 EXISTING FIRE HYDRANT.
  
 20. [NOT SATISFIED] SHOW UTILITIES ON THE LANDSCAPE
 PLANS.
  
 21. [NOT SATISFIED] EXFILTRATION TRENCH APPEARS TO
 CROSS THE EAST PROPERTY LINE AND ALSO BE IN CONFLICT
 WITH EXISTING RETAINING WALL.
  
 22. [NOT SATISFIED] 2.5 FT GRADE DIFFERENTIAL BETWEEN
 EAST PROPERTY LINE AND PARKING LOT.
  
 23. [SATISFIED] LABEL GRANT ST. CORRECTLY.
  
  
 NEW COMMENTS:
 24. ON SITE PLAN SHEETS AND ENGINEERING PLAN SHEETS
 UPDATE REFERENCES TO FDOT INDEX NUMBERS TO LATEST FDOT
 STANDARD PLAN NUMBERS.
  
 25. JUSTIFY 18? DIAMETER PIPE SIZE FOR OUTFALL PIPE
 BETWEEN S-104 AND EXISTING CURB INLET.
  
 26. SHOW ALL EXISTING PIPE CONNECTIONS (WITH PIPE
 SIZES) TO THE EXISTING CURB INLET AND THE STRUCTURES
 THESE PIPES ARE CONNECTED TO.
  
 27. PIPE BETWEEN S-102 AND S-103 CROSSES THE PROPERTY
 CORNER.
  
 28. SUGGEST MOVING THE MILL AND RESURFACING LIMITS ON
 GRANT AVE TO THE EAST SIDE OF THE STAMPED ASPHALT CROSS
 WALK.
  
 29. PROPOSED SPOT GRADE OF 28.2 FT NAVD AT EAST SIDE OF
 PROPOSED DRIVEWAY TO 19TH STREET IS LOWER THAN THE
 EXISTING SPOT GRADE OF 29.13 FT NAVD. SHOW HOW THE ROAD
 WILL TRANSITION TO THE PROPOSED GRADE.
  
 30. SECTION A (SHEET C3.2):
 A. VALLEY GUTTER APPEARS TO BE SHOWN.
 B. PROVIDE SWALE BETWEEN BACK OF SIDEWALK AND BUILDING.
 C. PROVIDE DISTANCE FROM PROPERTY LINE TO FACE OF
 BUILDING.
 D. LABEL BUILDING AS BUILDING ?B? DUE TO LISTED FFE.
 E. SHOW AND DIMENSION PATIO.
  
 31. SECTION B (SHEET C3.2):
 A. VALLEY GUTTER APPEARS TO BE SHOWN.
 B. SHOW BUILDING AND DISTANCE BETWEEN PROPERTY LINE AND
 BUILDING FACE.
 C. SHOW GROUND SLOPE TO BUILDING FACE.
  
 32. SECTION C (SHEET C3.2):
 A. TYPE ?D? CURB SHOWN BUT THIS CURB IS NOT SHOWN ON
 THE PGD PLAN.
 B. SHOW LOCATION OF PROPOSED FENCE.
 C. MOVE LOCATION OF THE SECTION TO THE CENTER OF THE
 RAMP NEXT TO THE HANDICAP PARKING SPACE AND EXTEND
 SECTION TO THE FACE OF BUILDING ?B?. SHOW ALL GRADE
 BREAKS AND DIMENSIONS.
  
 33. SECTION D (SHEET C3.2):
 A. ELEVATION GRID NUMBERING OFF.
 B. VALLEY GUTTER APPEARS TO BE SHOWN. SHOW THIS ON THE
 PGD PLAN.
 C. CONFIRM EDGE OF PAVEMENT ELEVATION AT THE LOCATION
 OF THE CROSS SECTION.
 D. CALLOUT NEW SIDEWALK FOR DRIVEWAY APRON.
  
 34. PROVIDE CROSS SECTION FROM CENTERLINE OF 19TH
 STREET TO FACE OF BUILDING ?B?. SHOW GRADE BREAKS AND
 DIMENSIONS FROM PROPERTY LINE. (REPEAT COMMENT)
  
 35. PROVIDE CROSS SECTION FROM 3 FEET EAST OF THE EAST
 PROPERTY LINE TO THE FACE OF BUILDING ?A?. SHOW GRADE
 BREAKS AND DIMENSIONS FROM PROPERTY LINE. (REPEAT
 COMMENT)
  
 36. ARCHITECTURAL NORTH AND SOUTH ELEVATIONS APPEAR TO
 BE MISLABELED ON SHEET A-2.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved