| Plan Review Notes For Project Z21120018 |
| Project Number |
Z21120018 |
|
| Review Stop |
SURVEY |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2022-01-10 09:31:27 | 1. REVISE SURVEY AND ALL PLANS TO SHOW MAINTENANCE MAP | | | RIGHT-OF-WAY IN ROAD PLAT BOOK 11/94. | | | 2. MASTER METER MAY BE REQUIRED. METER BANK CONFLICTS | | | WITH PROPOSED LANDSCAPING. | | | 3. CHANGE LINE WEIGHT OF PROPERTY LINE FOR BETTER | | | DELINEATION. DIVIDE CONCEPTUAL PLAN INTO SEPARATE P&G | | | AND W&S PLANS. | | | 4. NEED TO SEE CROSS-SECTIONS ON ALL SIDES DUE TO GRADE | | | DIFFERENCES. | | | 5. N-S SANITARY LATERAL WILL BE PRIVATE. ADD POINT OF | | | SERVICE/MANHOLE. | | | 6. SURVEY NEEDS TO BE SIGNED/SEALED. | | | 7. ADD CONVERSION TO NGVD-29 TO ALL PLANS. | | | 8. CIVIL PLANS ALMOST ILLEGIBLE DUE TO OVER-WRITE. | | | 9. REPLAT MAY BE REQUIRED. | | | |
| |
Print |
|