Plan Review Notes
Plan Review Notes For Project Z21110019
Project Number Z21110019
Review Stop TRAFFIC
Sequence Number 1
Notes
Date Text
2021-12-09 12:45:25TRAFFIC COMMENTS
 1) PROVIDE THE 2007 STUDY JUSTIFYING THE TRIP
 GENERATION CALCULATIONS
 2) PROVIDE DOCUMENTATION SUBSTANTIATING VESTED TRIPS
 AND APPROVED DRIVEWAYS
 3) PROVIDE COUNTY TPS LETTER
  
 SITE COMMENTS
 4) PROVIDE SIDEWALK AND WALKWAYS? DIMENSIONS IN THE
 SITE PLAN
 5) PROVIDE AUTOTURN ANALYSIS FOR GARBAGE TRUCK AND/OR
 SERVICE VEHICLES DRIVING IN AND OUT OF THE PROPOSED
 DEVELOPMENT WITH VEHICLE DYNAMIC ENVELOPES CLEARLY
 DEFINED. ANALYSIS SHOULD BE PROVIDED IN A SEPARATE
 FILE/DRAWING. PLEASE PROVIDE DOCUMENT NAME AND SHEET
 NUMBER SHOWCASING THE ANALYSIS.
 6) PROVIDE PARKING TABLE SHOWCASING THE NUMBER OF
 REQUIRED AND PROVIDED PARKING SPACES, INCLUSIVE OF ADA
 AND BICYCLE ONES
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved